1. The document provides general notes for a engineering drawing including that all drawings should be read together with architect drawings and any discrepancies reported. 2. All dimensions are in millimeters unless otherwise stated and written dimensions take precedence over scaled dimensions. 3. Foundations have been designed with an assumed bearing capacity of 150 kN/m2 and foundation depths must be confirmed by the engineer before concrete is placed. Blinding shall not be done without engineer approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views

01 - Foundation Layout

1. The document provides general notes for a engineering drawing including that all drawings should be read together with architect drawings and any discrepancies reported. 2. All dimensions are in millimeters unless otherwise stated and written dimensions take precedence over scaled dimensions. 3. Foundations have been designed with an assumed bearing capacity of 150 kN/m2 and foundation depths must be confirmed by the engineer before concrete is placed. Blinding shall not be done without engineer approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES

1 2 T 1 6 -0 1
500 1. REFERENCES
ALL ENGINEERS' DRAWINGS SHALL BE READ IN CONJUNCTION
x R 8 -0 2 -1 5 0 WITH ALL ARCHITECT'S DRAWINGS. ANY DISCREPANCY SHOULD
BE REPORTED TO BOTH ARCHITECT AND ENGINEER.
1 2 3 4 2. DIMENSIONS

500
ALL DIMENSIONS ARE IN MILLIMETERS (UNLESS STATED OTHERWISE).
WRITTEN DIMENSIONS SHOULD BE PREFERRED TO SCALE DIMENSIONS.
15000
3. FOUNDATIONS
5000 5000 5000
FOUNDATIONS HAVE BEEN DESIGNED ON AN ASSUMED BEARING
S E C T IO N : B - B CAPACITY OF 150 kN/m2. FOUNDATION DEPTHS TO BE CONFIRMED
1500 1500 1500 1500 1500 1500 1500 1500 1500 BY ENGINEER PRIOR TO PLACING CONCRETE. BLINDING SHALL NOT
BE PLACED WITHOUT ENGINEER'S APPROVAL
A C1
C1
C1 C1

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200
APPROVED FILL SHALL BE PLACED AND SPREAD IN LAYERS OF 150mm
to 250mm, OMC ACHIEVED AND COMPACTED TO 98% MDD (MODIFIED AASHTO)

2500
4. BLOCKWORK
ALL LOAD BEARING BLOCKWORK TO BE CONSTRUCTED FROM
SOLID BLOCKS OF 4.0N/mm2 MIN CHARACTERISTIC COMPRESSIVE
300x165x10mm kg/m

5000
C1 STRENGTH COMPLYING WITH BS5628 PART 1: STRUCTURAL USE OF
REINFORCED MASONRY. MORTAR TO CONFORM TO
MORTAR DESIGNATION (III) OF TABLE 1, BS5628 PART 1.

2500
C1 5. CONCRETE
406X 178X 85kG /m U B 406X 178X 85kG /m U B 406X 178X 85kG /m U B

1250
P E R M IT T E D T Y P E M A X . S IZ E W O R K A B IL IT Y
PROPOSED USE GRADE
GIRDER SYSTEM C1 OF AGGREGATE AGGREGATE
B R E IN F O R C E D C O N C . COURSE F IN E

1250
C1 (IN C L . G R O U N D 20 m m M E D IU M
C 25 BS 882 BS 882
B E A R IN G S L A B ) (7 5 )

2500
C1 CONCRETE
M E D IU M
406X 178X 85kG /m U B C 20 BS 882 BS 882

1250
406X 178X 85kG /m U B 406X 178X 85kG /m U B C O N T A IN IN G N O 20 m m (7 5 )
EM BEDDED M ETAL

15000
300x165x10mm kg/m C1

5000
B L IN D IN G C O N C R E T E C 1 0 M E D IU M
BS 882 BS 882 40 m m
(7 5 )

1250
C1 C O N C R E T E IN
406X 178X 85kG /m U B M E D IU M
M IN O R E L E M E N T S C 25 BS 882 BS 882 10 m m

2500
(7 5 )
S T A N C H IO N E G L IN T E L S
406X 178X 85kG /m U B 406X 178X 85kG /m U B 406X 178X 85kG /m U B

1250
A B C1
6. COVER TO CONCRETE

G RO U N D FLO O R
C LOCATION COVER

1250
C1 GIRDER SYSTEM T O M E S H IN G R O U N D S L A B 25m m
150

C O L U M N S (C O V E R T O L IN K S )

2500
406X 178X 85kG /m U B 406X 178X 85kG /m U B B U R IE D IN G R O U N D 50m m
ABOVE GROUND 25m m
C1
50

406X 178X 85kG /m U B R .C S L A B (C O V E R T O M A IN B A R S ) 25m m


F O U N D A T IO N S

5000
300x165x10mm kg/m
150

TOP AND BOTTOM 50m m


600

C1 S ID E S 50m m

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200

IPE 200
4 N o s .2 4 D x 6 0 0 L O N G
H O L D IN G D O W N B O L T S 7. REINFORCEMENT
10

1 5 R 1 0 -0 3 -2 0 0 L IN K S

ALL REINFORCEMENT TO BE IN ACCORDANCE WITH CONSULTING


150 150
ENGINEER'S SPECIFICATIONS.

R -------- DENOTES ROUND MILD STEEL BARS


D C1 T -------- DENOTES HIGH YIELD BOND STRENGTH STEEL BARS
C1 300x165x10mm kg/m
LAP LENGTHS: T12 - 600mm
T16 - 800mm
1800

B B T20 - 1000mm
1 2 T 1 6 -0 1 T25 - 1250mm

F IR S T F L O O R S L A B 8. STEEL WORK.
ALL STEEL WORK IS TO BE DESIGNED IN ACCORDANCE WITH BS 5950
PART 1 - 2000, BRITISH STANDARD FOR STRUCTURAL USE OF
STEEL WORK IN BUILDINGS. ALL STRUCTURAL STEEL TO BE OF
GRADE 43 TO BS 4360 UNLESS STATED OTHERWISE.

10m m T H IC K 9. TIMBER
500

M S P LA T E ALL TIMBER SHALL BE IN ACCORDANCE WITH BS5268 PART 2: 1984,


406X 178X 85kG /m U B "STRUCTURAL USE OF TIMBER", AND LATEST GRADING RULES ISSUED BY GOVT.

75
RAFTER ALL STRUCTURAL TIMBER TO BE OF MINIMUM STRENGTH

7 5 1 0 0 1 00 10 0 1 00 10 0 1 00
CLASS SC3 OF TABLE 8, BS5268
50

TIMBER SIZES INDICATED ON THE DRAWING ARE NOMINAL SIZES,


1 2 T 1 6 -0 7 -2 0 0 (B 1 /B 2 ) AND MINIMUM SIZES SHALL NOT BE LESS THAN THOSE SPECIFIED.

750 500 750 ALL TIMBER SHALL BE IMPREGNATED EITHER AT WORKS OR AFTER
FABRICATION OR ON SITE BEFORE ERECTION AGAINST FUNGUS, ROT,
2000 DECAY, AND INFESTATION CONFORMING TO BS 5268 PART 3
"PRESERVATION TREATMENT FOR CONSTRUCTION TIMBER"

SAWN OR CUT ENDS AND NOTCHES EXPOSED BY WORKING


AFTER TREATMENT SHALL BE FURTHER PAINTED WITH LIBERAL
S E C T IO N : A - A 14M 20 (8.8) B O LT S APPLICATION OF AN APPROVED PRESERVATIVE

S E C T IO N : B - B NOTCHES AND ALL CORNERS OF NOTCHES TO BE PRE-DRILLED PRIOR TO


FORMING THE NOTCH, TO AVOID CROSS OR OVERCUTTING OF JOISTS.

406X 178X 85kG /m U B


10m m T H IC K
RAFTER
M S P LA T E
FOR APPROVAL

75 1 0 0 1 0 0 1 00 10 0 1 00 10 0 7 5
NO. DATE R E V IS IO N D E S C R IP T IO N BY REMARKS
750

KNEE HAUNCH
406X 178X 85kG /m U B
150 150
IP E 200
1 2 T 1 6 -0 7 -2 0 0 (B 1 )

T IE B E A M W E LD E D T O
150

14 M 20 (8.8) B O LT S
2000

500

150

C L IE N T :
406X 178X 85kG /m U B
S T A N C H IO N B A R A V IA TION

1 2 T 1 6 -0 7 -2 0 0 (B 2 )
750

A R C H IT E C T :
S E C T IO N : A - A
FRA N CIS W A N D IJO

1200 500 300

2000
C IV IL / S T R U C T U R A L E N G IN E E R :
A N ETA LIS IRE D A N IEL

B A S E P L A N T Y P E : "F 1 "(8 N o s )
P R O JE C T :

D R A W IN G T IT L E :

F O U N D A T IO N G E N E R A L A R R A N G E M E N T A N D
F O O T IN G D E T A IL S
SCALE: DRAW N: CHECKED:
1 :1 0 0 , 1 :2 5 , 1 :1 0 ND EM
DATE: JO B N O . DRG NO. REV
AUG 2021 M 2 0 -2 0 01

You might also like