Emergency Communication Flow Chart HdGCP-3 Rev 2

The document is an emergency communication flow chart for the Haradh-Hawiyah Field Gas Compression Program. It outlines the communication procedures and key contacts in the event of an emergency scenario at the site. The chart shows the primary and secondary communication flows between the project manager, incident commander, emergency response teams, and external emergency assistance contacts to ensure a coordinated response. Contact details are provided for the incident manager, construction and HSE superintendents, area managers, and emergency response supervisors.

Uploaded by

Sabre Alam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (1 vote)
309 views

Emergency Communication Flow Chart HdGCP-3 Rev 2

The document is an emergency communication flow chart for the Haradh-Hawiyah Field Gas Compression Program. It outlines the communication procedures and key contacts in the event of an emergency scenario at the site. The chart shows the primary and secondary communication flows between the project manager, incident commander, emergency response teams, and external emergency assistance contacts to ensure a coordinated response. Contact details are provided for the incident manager, construction and HSE superintendents, area managers, and emergency response supervisors.

Uploaded by

Sabre Alam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Haradh – Hawiyah Field Gas Compression Program

EMERGENCY COMMUNICATION FLOW CHART /HHFGCP


HdGCP- 3 / U31 / 522

External Emergency
Assistance
PMT
PMT HSE
Abdulwasa AlGarni Project Manager
059 376 1952 Jose M. Soltero 053 042 7219

TR Site HSE Manager Site Manager


Jose Rizo 053 046 3069 Carmelo Clavain 053 023 1815
Incident Commander Incident Manager
TR HSE Area Manager TR Construction Area Manager
Juan Pablo Gomez 053 847 4320 Jose Bruno / 050 716 1855
Emergency Marshall Incident Deputy Manager

TR HSE Superintendent
TR Construction Superintendent
Mehmet Yilmaz 053 450 1249
Ridvan Simsek 055 793 8748
Huseyin Pehlivan 053 361 5722
Site Response Team
TR HSE Supervisor
Abdullah Shah 058 072 4420
Osman Salih Bas 059 795 4632 Verify Activation
Emergency Protocol
TR Site Response Team

Subcontractor
Immediately
Supervisor / HSE Staff)

TR HOT LINE
Observer/Witness 053 399 2200
(Any Individual at site)
Site Emergency
Scenario

Main Communication flow


Secondary Communication flow Rev. 1.

You might also like