Accomplishment Breakdown: Contract ID#: 16EO0083 Name of Project

This document provides a progress report for the construction and maintenance of bridges along national roads in the Philippines. It details the accomplishments and costs for various tasks such as providing a field office, safety programs, signage, excavation, embankment, concrete work, structural steel installation, drainage, and miscellaneous structures from the start of the project through 12 September 2020. The project is over 50% complete with some tasks fully finished while others have yet to begin.

Uploaded by

Dennis Sagao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

Accomplishment Breakdown: Contract ID#: 16EO0083 Name of Project

This document provides a progress report for the construction and maintenance of bridges along national roads in the Philippines. It details the accomplishments and costs for various tasks such as providing a field office, safety programs, signage, excavation, embankment, concrete work, structural steel installation, drainage, and miscellaneous structures from the start of the project through 12 September 2020. The project is over 50% complete with some tasks fully finished while others have yet to begin.

Uploaded by

Dennis Sagao
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Project ID No.

: 0088 Date covered


Form No.: ACCOMPLISHMENT BREAKDOWN From:
Document No. To: 12 September 2020

Name of Construction and Maintenance of Bridges along National Roads-replacement of Permanent


Contract ID#: 16EO0083 weak Bridges, Pinamanaan Br.(B00076MR) along Mindoro West Coastal Rd. (phase II)
Project:
ACCOMPLISHED QUANTITY TOTAL COST
REMAINING REMAINING
ITEM NO. DESCRIPTION QTY UNIT UNIT COST AMOUNT WT % This Phy Acc Phy Acc
Previous Period To Date % Previous This Period To Date % WT % QTY BALANCE BALANCE

PART NO. A FACILITIES FOR THE ENGINEER


A.1.1(8) Provision of field office for the engineer (rental basis) 7.00 Month 15,750.00 110,250.00 0.28% 6.00 0.50 6.50 7.14% 94,500.00 7875.00 102,375.00 92.86% 0.26% 0.50 7,875.00 ###
PART NO. B OTHER GENERAL REQUIREMENTS
B.5 Project Billbord/Signboard/Warning Signs 2.00 each 4,202.87 8,405.74 0.02% 2.00 - 2.00 0.00% 8,405.74 0.00 8,405.74 100.00% 0.02% - - ###
B.7 Occupational Safety and Health Program 7.00 Month 24,705.52 172,938.64 0.44% 6.00 0.50 6.50 7.14% 148,233.12 12352.76 160,585.88 92.86% 0.41% 0.50 12,352.76 ###
B.8 Traffic Management 7.00 Month 22,826.40 159,784.80 0.41% 6.00 0.50 6.50 7.14% 136,958.40 11413.20 148,371.60 92.86% 0.38% 0.50 11,413.20 ###
B.9 Mobilization/Demobilization 1.00 L.S. 197,131.39 197,131.39 0.50% 0.50 - 0.50 0.00% 98,565.70 0.00 98,565.70 50.00% 0.25% 0.50 98,565.70 ###
PART NO. C EARTHWORKS -
100 (3)a Embankment( from excavation) 5,088.60 cu.m 290.27 1,477,067.92 3.77% 4,100.00 - 4,100.00 0.00% 1,190,107.00 0.00 1,190,107.00 80.57% 3.04% 988.60 286,960.92 ###
101 (3)b3 Embankment (from Borrow ) 4,620.00 cu.m 847.34 3,914,710.80 9.99% 4,620.00 - 4,620.00 0.00% 3,914,710.80 0.00 3,914,710.80 100.00% 9.99% - - ###
102(2) Structure Excavation (common soil) 225.15 cu.m 296.88 66,842.53 0.17% 155.00 - 155.00 0.00% 46,016.40 0.00 46,016.40 68.84% 0.12% 70.15 20,826.13 ###
PART NO. D SUB BASE AND BASE COURSE
200(1) Aggregate Sub base Course 757.00 cu.m 1,062.54 804,342.78 2.05% 640.00 - 640.00 0.00% 680,025.60 0.00 680,025.60 84.54% 1.73% 117.00 124,317.18 ###
PART NO. E SURFACE COURSE
300(1) Aggregate Surface Course 154.00 cu.m 1,229.16 189,290.64 0.48% - 50.00 50.00 32.47% - 61458.00 61,458.00 32.47% 0.16% 104.00 127,832.64 ###
311(1)e.1 .28m. Thk.PCCP 1,736.00 sq.m 1,730.52 3,004,182.72 7.66% - - 0.00% - 0.00 - 0.00% 0.00% 1,736.00 3,004,182.72 ###
PART NO. F BRIDGE STRUCTURES ###
401(2)a Concrete Bridge Railing 99.20 l.m. 3,958.79 392,711.97 1.00% 99.20 - 99.20 0.00% 392,711.97 0.00 392,711.97 100.00% 1.00% - - ###
403(5) Structural Steel, Furnished, Fabricated and erected 97,288.00 kgs. 229.67 22,344,134.96 57.00% 97,288.00 - 97,288.00 0.00% 22,344,134.96 0.00 22,344,134.96 100.00% 57.00% - - ###
404(1a) Reinforcing Steel (Grade 40) 12,974.00 kgs. 61.30 795,306.20 2.03% 12,974.00 - 12,974.00 0.00% 795,306.20 0.00 795,306.20 100.00% 2.03% - - ###
404(1b) Reinforcing Steel (Grade 60) 829.00 kgs. 63.94 53,006.26 0.14% 829.00 - 829.00 0.00% 53,006.26 0.00 53,006.26 100.00% 0.14% - - ###
405(1) Structural Concrete Class- A 85.82 Cu.m. 17,623.78 1,512,472.80 3.86% 85.82 - 85.82 0.00% 1,512,472.80 0.00 1,512,472.80 100.00% 3.86% - - ###
412(1) Elastomeric Bearing Pad 8.00 Each 20,562.52 164,500.16 0.42% 8.00 - 8.00 0.00% 164,500.16 0.00 164,500.16 100.00% 0.42% - - ###
415(1) Elastomeric, Hot-Applied Expansion Joint Sealant 0.40 Cu.m. 48,534.13 19,413.65 0.05% - - - 0.00% - 0.00 - 0.00% 0.00% 0.40 19,413.65 ###
PART NO. G DRAINAGE & SLOPE PROTECTION STRUCTURES
505-5 Grouted Riprap, Class "A" 34.04 Cu.m. 3,378.97 115,020.14 0.29% - - - 0.00% - 0.00 - 0.00% 0.00% 34.04 115,020.14 ###
511(1) Gabions 1,173.00 Cu.m. 2,507.80 2,941,649.40 7.50% - - - 0.00% - 0.00 - 0.00% 0.00% 1,173.00 2,941,649.40 ###
511(3) Filther cloth 529.00 sq.m. 398.57 210,843.53 0.54% - - - 0.00% - 0.00 - 0.00% 0.00% 529.00 210,843.53 ###
517 (1) Metal Drain Pipe 130.00 l.m. 3,051.35 396,675.50 1.01% 130.00 - 130.00 0.00% 396,675.50 0.00 396,675.50 100.00% 1.01% - - ###
PART NO. H MISCELANEOUS STRUCTURES ###
612-1 Reflectorized Pavement Marking (White) 61.00 sq.m. 823.10 50,209.10 0.13% - - - 0.00% - 0.00 - 0.00% 0.00% 61.00 50,209.10 ###
612-2 Reflectorized Pavement Marking (Yellow) 90.00 sq.m. 960.96 86,486.40 0.22% - - - 0.00% - 0.00 - 0.00% 0.00% 90.00 86,486.40 ###
605 (2)a3 Regulatory Signs (600mm dia, R6-4) 2.00 each 6,374.98 12,749.96 0.03% - - - 0.00% - 0.00 - 0.00% 0.00% 2.00 12,749.96 ###
-

TOTAL AMOUNT 39,200,127.99 100.00% 31,976,330.60 93,098.96 32,069,429.56 81.81% 7,130,698.43

NOTE : ACTIVITY -CONCRETE POURING OF CONCRETE RAILLING POST ( COMPLETED )

Prepared by: Checked by: Recommending Approval: Approved by:

LOPETO M. ASCANO Dennis Sagao Ernesto Larosa Ariel Lim


Project Manager Sr. Planning Engineer Operation Manager General Manager
Project ID No.: 0088 Date covered
Form No.: ACCOMPLISHMENT BREAKDOWN From:
Document No. To: 29 August 2020

Name of Construction and Maintenance of Bridges along National Roads-replacement of Permanent weak Bridges, Pinamanaan Br.(B00076MR) along Mindoro West Coastal Rd.
Contract ID#: 16EO0083 (phase II)
Project:
ACCOMPLISHED QUANTITY TOTAL COST
REMAINING REMAINING
ITEM NO. DESCRIPTION ORIGINAL CONTRACT APPROVED VARIATION ORDER WT % This Phy Acc Phy Acc
Previous Period To Date % Previous This Period To Date % WT % QTY BALANCE BALANCE
Quanity Unit Unit Cost Amount Quanity Unit Unit Cost Amount
PART NO. A FACILITIES FOR THE ENGINEER
A.1.1(8) Provision of field office for the engineer (rental basis) 7.00 Month 12,216.50 85,515.50 7.00 Month 12,216.50 85,515.50 0.23% 5.50 0.50 6.00 7.14% 67,190.75 6108.25 73,299.00 85.71% 0.20% 1.00 12,216.50 ###
PART NO. B OTHER GENERAL REQUIREMENTS
B.5 Project Billbord/Signboard/Warning Signs 2.00 each 6,390.62 12,781.24 2.00 each 6,390.62 12,781.24 0.03% 2.00 - 2.00 0.00% 12,781.24 0.00 12,781.24 100.00% 0.03% - - ###
B.7 Occupational Safety and Health Program 7.00 Month 23,588.38 165,118.66 7.00 Month 23,588.38 165,118.66 0.44% 5.50 0.50 6.00 7.14% 129,736.09 11794.19 141,530.28 85.71% 0.38% 1.00 23,588.38 ###
B.8 Traffic Management 7.00 Month 18,848.31 131,938.17 7.00 Month 18,848.31 131,938.17 0.35% 5.50 0.50 6.00 7.14% 103,665.71 9424.16 113,089.86 85.71% 0.30% 1.00 18,848.31 ###
B.9 Mobilization/Demobilization 1.00 L.S. 305,412.50 305,412.50 1.00 L.S. 305,412.50 305,412.50 0.81% 0.50 - 0.50 0.00% 152,706.25 0.00 152,706.25 50.00% 0.41% 0.50 152,706.25 ###
PART NO. C EARTHWORKS - -
100 (3)a Embankment( from excavation) 5,088.60 cu.m 287.53 1,463,125.16 389.00 cu.m 287.53 111,849.17 0.30% 389.00 - 389.00 0.00% 111,849.17 0.00 111,849.17 7.64% 0.02% 4,699.60 1,351,275.99 ###
101 (3)b3 Embankment (from Borrow ) 4,620.00 cu.m 793.49 3,665,923.80 4,665.80 cu.m 793.49 3,702,265.64 9.88% 4,620.00 - 4,620.00 0.00% 3,665,923.80 0.00 3,665,923.80 100.00% 9.88% - - ###
102(2) Structure Excavation (common soil) 225.15 cu.m 267.61 60,252.39 225.15 cu.m 267.61 60,252.39 0.16% 130.00 25.00 155.00 11.10% 34,789.30 6690.25 41,479.55 68.84% 0.11% 70.15 18,772.84 ###
PART NO. D SUB BASE AND BASE COURSE
200(1) Aggregate Sub base Course 757.00 cu.m 1,026.12 776,772.84 860.00 cu.m 1,026.12 882,463.20 2.35% 520.00 35.00 555.00 4.62% 533,582.40 35914.20 569,496.60 73.32% 1.73% 202.00 207,276.24 ###
PART NO. E SURFACE COURSE
300(1) Aggregate Surface Course 154.00 cu.m 1,193.55 183,806.70 154.00 cu.m 1,193.55 183,806.70 0.49% - - 0.00% - 0.00 - 0.00% 0.00% 154.00 183,806.70 ###
311(1)e.1 .28m. Thk.PCCP 1,736.00 sq.m 1,637.78 2,843,186.08 1,535.64 sq.m 1,637.78 2,515,040.48 6.71% - - 0.00% - 0.00 - 0.00% 0.00% 1,736.00 2,843,186.08 ###
PART NO. F BRIDGE STRUCTURES ###
401(2)a Concrete Bridge Railing 99.20 l.m. 3,863.32 383,241.34 99.20 l.m. 3,863.32 383,241.34 1.02% 74.25 16.00 90.25 16.13% 286,851.51 61813.12 348,664.63 90.98% 0.93% 8.95 34,576.71 ###
403(5) Structural Steel, Furnished, Fabricated and erected 97,288.00 kgs. 218.98 21,304,126.24 97,288.00 kgs. 218.98 21,304,126.24 56.85% 97,288.00 - 97,288.00 0.00% 21,304,126.24 0.00 21,304,126.24 100.00% 56.85% - - ###
404(1a) Reinforcing Steel (Grade 40) 12,974.00 kgs. 58.71 761,703.54 12,974.00 kgs. 58.71 761,703.54 2.03% 12,974.00 - 12,974.00 0.00% 761,703.54 0.00 761,703.54 100.00% 2.03% - - ###
404(1b) Reinforcing Steel (Grade 60) 829.00 kgs. 68.86 57,084.94 829.00 kgs. 68.86 57,084.94 0.15% 829.00 - 829.00 0.00% 57,084.94 0.00 57,084.94 100.00% 0.15% - - ###
405(1) Structural Concrete Class- A 85.82 Cu.m. 18,090.85 1,552,556.75 85.82 Cu.m. 18,090.85 1,552,556.75 4.14% 85.82 - 85.82 0.00% 1,552,556.75 0.00 1,552,556.75 100.00% 4.14% - - ###
412(1) Elastomeric Bearing Pad 8.00 Each 20,307.05 162,456.40 8.00 Each 20,307.05 162,456.40 0.43% 8.00 - 8.00 0.00% 162,456.40 0.00 162,456.40 100.00% 0.43% - - ###
415(1) Elastomeric, Hot-Applied Expansion Joint Sealant 0.40 Cu.m. 46,697.85 18,679.14 0.40 Cu.m. 46,697.85 18,679.14 0.05% - - - 0.00% - 0.00 - 0.00% 0.00% 0.40 18,679.14 ###
PART NO. G DRAINAGE & SLOPE PROTECTION STRUCTURES
505-5 Grouted Riprap, Class "A" 34.04 Cu.m. 3,282.68 111,742.43 432.35 Cu.m. 3,282.68 1,419,266.70 3.79% - - - 0.00% - 0.00 - 0.00% 0.00% 34.04 111,742.43 ###
511(1) Gabions 1,173.00 Cu.m. 2,318.73 2,719,870.29 1,242.00 Cu.m. 2,318.73 2,879,862.66 7.68% - - - 0.00% - 0.00 - 0.00% 0.00% 1,173.00 2,719,870.29 ###
511(3) Filther cloth 529.00 sq.m. 340.66 180,209.14 1,150.00 sq.m. 340.66 391,759.00 1.05% - - - 0.00% - 0.00 - 0.00% 0.00% 529.00 180,209.14 ###
517 (1) Metal Drain Pipe 130.00 l.m. 2,923.80 380,094.00 11.50 l.m. 2,923.80 33,623.70 0.09% 11.50 - 11.50 0.00% 33,623.70 0.00 33,623.70 8.85% 0.01% 118.50 346,470.30 ###
PART NO. H MISCELANEOUS STRUCTURES ###
612-1 Reflectorized Pavement Marking (White) 61.00 sq.m. 785.24 47,899.64 56.00 sq.m. 785.24 43,973.44 0.12% - - - 0.00% - 0.00 - 0.00% 0.00% 61.00 47,899.64 ###
612-2 Reflectorized Pavement Marking (Yellow) 90.00 sq.m. 968.28 87,145.20 84.00 sq.m. 968.28 81,335.52 0.22% - - - 0.00% - 0.00 - 0.00% 0.00% 90.00 87,145.20 ###
605 (2)a3 Regulatory Signs (600mm dia, R6-4) 2.00 each 6,790.39 13,580.78 2.00 each 6,790.39 13,580.78 0.04% - - - 0.00% - 0.00 - 0.00% 0.00% 2.00 13,580.78 ###
605 (2)a3 Removal of existing PCCP ( 0.23thk. ) 1,535.64 sq.m 139.53 214,267.85 1,535.64 sq.m 139.53 214,267.85 0.57% - - - 0.00% - 0.00 - 0.00% 0.00% 1,535.64 214,267.85 ###
-

TOTAL AMOUNT 37,688,490.72 37,473,961.65 100.00% 28,970,627.78 131,744.17 29,102,371.95 77.61% 8,586,118.77

NOTE :

Prepared by: Checked by: Recommending Approval: Approved by:

LOPETO M. ASCANO Dennis Sagao Ernesto Larosa Ariel Lim


Project Manager Sr. Planning Engineer Operation Manager General Manager