0% found this document useful (0 votes)
586 views

Truss 2 Detail

The document contains details of the construction of a roof structure. It includes C-shaped purlins spaced at 600mm intervals and angle bars used as top and bottom chords. The trusses are made of 2-6mm angle bars for the webs and 6mm angle bars for the top and bottom chords. The trusses have a span of 7250mm and are spaced at 1000mm.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
586 views

Truss 2 Detail

The document contains details of the construction of a roof structure. It includes C-shaped purlins spaced at 600mm intervals and angle bars used as top and bottom chords. The trusses are made of 2-6mm angle bars for the webs and 6mm angle bars for the top and bottom chords. The trusses have a span of 7250mm and are spaced at 1000mm.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

C-PURLINS 75MM X 50MM X 1.2 THK.

SPACED @ 600MM O.C.

2-6mm x 50mm ANGLE BAR TOP & BOT. CHORDS


2-6mm x 50mm ANGLE BAR TOP & BOT. CHORDS
SEE DETAIL CORBEL
TOP OF PARAPET WALL
TOP OF PARAPET WALL C-PURLINS 75MM X 50MM X 1.2 THK.
SPACED @ 600MM O.C.
2-6mm x 38mm ANGLE BAR WEBS

975

1000
300

399
CEILING LINE CEILING LINE

1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1380 1380 1380 1380 1380 1380 1380 1380
RB2
7250 7250
SEE DETAIL 11000
LOUVER 14500
2-6mm x 38mm ANGLE BAR WEBS
TRUSS
SCALE :
2 DETAIL
1:30 MTS RB2 RB2

TRUSS
SCALE :
1 DETAIL
1:30 MTS
100 100
300 200
CAP BEAM

CHB PARAPET ROOFING

700
CONSTRUCTION GUTTER

TOP OF PARAPET WALL

300
12MMØ LONGITUDINAL BARS
CORBEL

400
SPACING @ 200MM O.C RB1

925
LOWER BLOCKS
SEE TRUSS DETAIL

INTERIOR CEILING
600
10MMØ TEMP, BARS

4000
@20MM O.C RB1
RB2
1200
300 900 RB1 400
50
150

DRIP MOLD
200
12MMØ SPACING COLUMN
150MM O.C
WINDOW 200 INSIDE GUTTER DETAIL
SCALE : 1:30 MTS

BLOW UP INSIDE GUTTER

PROJECT TITLE: CERTIFIED BY : PRC NO. : PREPARED BY : CHECKED & REVIEWED BY : RECOMMENDING APPROVAL : APPROVED BY : SHEET CONTENTS : SHEET NO. :
VALIDITY : TRUSS DETAIL
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF AGRICULTURE
PHILIPPINE RURAL DEVELOPMENT PROJECT
REPUBLIC OF THE PHILIPPINES
REGION VI-WESTERN VISAYAS
PROVINCE OF ILOILO
REHABILITATION AND EXPANSION
OF PUNTALES FEEDER PORT
P T R NO. :

DATE ISSUED :
BLOW UP TRUSS DETAIL
S-06
BONIFACIO DRIVE , ILOILO CITY 5000
PROJECT SP ID NP.: EVA MAE V. PARRENAS ROMEO ANDIG RAUL N. BANIAS M.D.,MPA ATTY. SUZETTE A. MAMON ARTHUR R. DEFENSOR JR.
PRDP-IB-R006-ILO-010-000-000-2019-AF
PROJECT LOCATION: BRGY. NIPA , CONCEPCION , ILOILO
PLACE ISSUED :

T I N:
M U N I C I P A L E N G I N E E R ACTING PROVINCIAL ENGINEER MUNICIPAL MAYOR , MUNICIPALITY OF CONCEPCION PROVINCIAL ADMINISTRATOR P R O V I N C I A L G O V E R N O R 29-59