Bill of Materials For Plumbing Works

This document contains a bill of materials for plumbing works including items for water distribution and sewer/drainage systems. The water distribution line items include uPVC and PPR pipes and fittings of various sizes, as well as gate valves, check valves, meters, and water pumps. Sewer/drainage items include PVC pipes, tees, reducers, wyes, bends, and end caps of various sizes. The total cost of materials is listed as 2.1M.

Uploaded by

Karen Ty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
615 views

Bill of Materials For Plumbing Works

This document contains a bill of materials for plumbing works including items for water distribution and sewer/drainage systems. The water distribution line items include uPVC and PPR pipes and fittings of various sizes, as well as gate valves, check valves, meters, and water pumps. Sewer/drainage items include PVC pipes, tees, reducers, wyes, bends, and end caps of various sizes. The total cost of materials is listed as 2.1M.

Uploaded by

Karen Ty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Subject BILL OF MATERIALS FOR PLUMBING WORKS

Description Quantity Unit


1- WATER DISTRIBUTION LINE
Water Supply from source to Cistern (all uPVC pipes and
1
fittings)
a. Ø75 Gatevalve 2 pcs
b. Ø75 Checkvalve 2 pcs
c. Ø75 Meter 2 pcs
e. Ø75 uPVC Pipe x 3m Class 150 66 pcs
f. Ø50 uPVC Pipe x 3m Class 150 55 pcs
g. Ø32 uPVC Pipe x 3m Class 150 98 pcs
h. Ø20 uPVC Pipe x 3m Class 150 41 pcs
i. Ø75 x Ø75 uPVC Tee 5 pcs
j. Ø75 x 90 deg. uPVC bend 9 pcs
k. Ø50 x Ø50 uPVC Tee 12 pcs
l. Ø50 x 90 deg. uPVC bend 9 pcs
m. Ø32 x 90 deg uPVC bend 31 pcs
n. Ø75 C.I. Gate Valve 37 pcs
o. Ø50 C.I. Gate Valve 6 pcs
p. Ø20 C.I. Gate Valve 9 pcs
q. Ø50 x 32 PPR Reducer 44 pcs
r. Ø32 x Ø32 PPR Tee 31 pcs
s. Ø32 x 90 deg PPR Bend 62 pcs
t. Ø32 x 20 PPR Tee Reducer 25 pcs
u. Ø20 x Ø20 PPR Tee 37 pcs
v. Ø20 x 90 deg PPR bend 75 pcs
w. Ø20 PPR Female thread Tee 47 pcs
x. Ø20 PPR Female thread x 90 deg bend 28 pcs

Constant Pressure Duplex Pumps Q=13 CMH x 30m TDH 3HP


2 each pump supplied and installed with complete accessories, 2 assy
control panel, bladder tank and valves (verify voltage)

3 Valve box 6 units


4 Solvent Cement 140 cans

2 - SEWER AND DRAINAGE


4 Ø150 PVC Series 1000 x 3m 2 pcs
5 Ø100 PVC Series 1000 x 3m 66 pcs
6 Ø75 PVC Series 1000 x 3m 55 pcs
7 Ø50 PVC Series 1000 x 3m 98 pcs
8 Ø32 PVC x 3m (Aircon Drain) 41 pcs
9 Ø150 x Ø150 PVC Tee 5 pcs
10 Ø150 x Ø100 PVC Tee Reducer 9 pcs
11 Ø150 x Ø75 PVC Tee Reducer 12 pcs
12 Ø150 x Ø50 PVC Tee Reducer 9 pcs
13 Ø100 x Ø100 PVC Tee 31 pcs
14 Ø100 x Ø75 PVC Tee Reducer 37 pcs
15 Ø100 x Ø50 PVC Tee Reducer 6 pcs
16 Ø75x Ø75 PVC Tee 9 pcs
17 Ø75 x Ø50 PVC Tee Reducer 44 pcs
18 Ø50 x Ø50 PVC Tee Reducer 31 pcs
19 Ø50 x Ø50 PVC Double Tee 62 pcs
20 Ø50 x Ø32 Reducer 25 pcs
21 Ø32 x Ø32 Tee 37 pcs
22 Ø150 x Ø100 PVC Wye Reducer 75 pcs
23 Ø150 x Ø75 PVC 75 Wye Reducer 47 pcs
24 Ø150 x Ø50 PVC Wye Reducer 28 pcs
25 Ø100 x Ø100 PVC Wye 2 pcs
26 Ø100 x Ø75 PVC Wye Reducer 6 pcs
27 Ø100 x Ø50 PVC Wye Reducer 78 pcs
28 Ø75x Ø75 PVC Wye 156 pcs
29 Ø75 x Ø50 PVC Wye Reducer 1 pcs
30 Ø150 x 90 deg PVC bend 10 pcs
31 Ø150 x 45 deg PVC bend 7 pcs
32 Ø100 x 90 deg PVC bend 10 pcs
33 Ø100 x 45 deg PVC bend 19 pcs
34 Ø75 x 90 deg PVC bend 8 pcs
35 Ø75 x 45 deg PVC bend 14 pcs
36 Ø50 x 45 deg PVC bend 26 pcs
37 Ø50 x 45 deg PVC bend 26 pcs
38 Ø32 x 45 deg PVC bend 14 pcs
39 Ø32 x 45 deg PVC bend 14 pcs
40 Ø150 End Cap / Cleanout 10 pcs
41 Ø100 End Cap / Cleanout 8 pcs
42 Ø75 End Cap / Cleanout 8 pcs
43 Ø50 End Cap / Cleanout 22 pcs
44 Ø32 End Cap / Cleanout 7 pcs

TOTAL AMOUNT
2.1M