Structural Design of Mat Foundation
Structural Design of Mat Foundation
Foundation
Conventional Rigid Method:
7m
Ix
L=1500KN J=1200KN
K=1500KN
0.436m
7m Iy
0.095m
7m ex
F=400KN D=350KN M
F H E=500KN J D
8m 8m
Cu= 25 KPa
qu= 128.5 KPa
qall= 42.83333 KPa
B= 16.5 m
L= 21.5 m
b= 0.5 m
QA= 400 KN
QB= 500 KN
QC= 450 KN
QD= 350 KN
QE= 500 KN
QF= 400 KN
QG= 1500 KN
QH= 1500 KN
QI= 1200 KN
QJ= 1200 KN
QK= 1500 KN
QL= 1500 KN
SQ= 11000 KN
Q M y X M xY
q Y '
A Iy Ix
2
A=BL= 354.75 m
1
Ix BL3
13665.27 m 4
12
1
Iy LB 3
8048.391 m
4
12
Qi X i Q iY i
X ' 7.813636 m
Y ' 10.84545 m
Q Q
B
ex X ' -0.43636 m
e y Y '
L
0.095455 m
2
2
M y Qe x 4800 KN.m
M x Qe y 1050 KN.m
11.000 4800.x 1050.y
q 31.
354.75 8048 13665
11.000 4800.x 1050. y
q 31.0 0.6x 0.077yKPa
354.75 8048 13665
QA= 372.8911 KN
QL= 1398.342 KN
QG= 1398.342 KN
QF= 372.8911 KN
The load per unit beam is equal to 164.766 KN
Strip GIJH
qav= (qB+qE)/2 31 Kpa
Total soil reaction qav.B1.L 5332 KN
Total column load on this strip 4000 KN
Average load 4666 KN
Modified average soil pressure
qav.modified= 27.128 Kpa
Factor modified column load F= 1.167
QB= 583.25 KN
QK= 1749.75 KN
QH= 1749.75 KN
QE= 583.25 KN
The load per unit beam is equal to 217 KN
Strip ICDJ
qav= (qC+qD)/2 26.05 Kpa
Total soil reaction qav.B1.L 2380.32 KN
Total column load on this strip 3200 KN
Average load 2790.159 KN
Modified average soil pressure
qav.modified= 30.53526 Kpa
Factor modified column load F= 0.871925
QC= 392.3662 KN
QJ= 1046.31 KN
QI= 1046.31 KN
QD= 305.1737 KN
The load per unit beam is equal to 129.775m KN
Shear on point
SA1= 41.19146 KN 0.25
SA2= -331.7 KN 0.25
SL1= 821.6612 KN 7.25m
SL2= -576.68 KN 7.25m
SG1= 576.6805 KN 14.25m
SG2= -821.661 KN 14.25m
SF1= 331.6997 KN 21.25m
SF2= -41.1915 KN 21.25m
Shear on point
SB1= 54.25581 KN 0.25
SB2= -528.994 KN 0.25
SK1= 990.17m KN 7.25m
SK2= -759.6m KN 7.25m
SH1= 759.58m KN 14.25m
SH2= -990.2m KN 14.25m
SE1= 528.99m KN 21.25m
SE2= -54.26m KN 21.25m
Shear on point
SC1= 32.4437 KN 0.25
SC2= -359.92 KN 0.25
SJ1= 548.502 KN 7.25m
SJ2= -497.81 KN 7.25m
SI1= 410.616 KN 14.25m
SI2= -635.69 KN 14.25m
SD1= 272.73 KN 21.25m
SD2= 32.4437 KN 21.25m
Moment on point
X1= 2.013158 m
X2= 4.986842 m
MA= 5.148933 KN.m
Mmax(AL)= -328.733 KN.m
ML= 1720.014 KN.m X5= 3.5m
Mmax(LG)= 710.824m KN.m X6= 3.5m
MG= 1720.014 KN.m
Mmax(GF)= -328.733 KN.m
MF= -5.14893 KN.m
X3= 2.01316m m
X4= 4.986842 m
Moment on point
X1= 2.4375 m
X2= 4.5625m m
0.25 MB= 6.781977 KN.m
2.01316 Mmax(BK)= -637.93 KN.m
7.25m MK= 1620.892 KN.m X5= 3.5m
10.75m Mmax(KH)= 291.62m KN.m X6= 3.5m
14.25m MH= 1620.9m KN.m
17.75m Mmax(HE)= -637.93 KN.m
21.25m X3= 2.4375m m
X4= 4.5625m m
ME= -6.78198
Moment on point
X1= 2.77344 m
X2= 4.23 m
MC= 4.05546 KN.m
Mmax(CJ)= -495.06 KN.m
MJ= 664.08 KN.m X5= 3.84m
Mmax(JI)= -290.70 KN.m X6= 3.1641
MI= 358.91 KN.m
Mmax(ID)= -282.52 KN.m
X3= 2.10156 m
X4= 4.89844 m
MD= 4.05546 KN.m
Shear diagram AF
1000
800 821.6612435
600 576.6804506
400
331.6996577
Strength(KN)
200
0 41.19146076
-41.19146076
0 5 10 15 20 25
-200
-331.6996577
-400
-600 -576.6804506
-800 -821.6612435
-1000
Distance(m)
Moment diagram AF
2000
1720.014483 1720.014483
1500
Moment(KN.m)
1000
710.8236945m
500
0 5.148932594 -5.148932594
0 5 10 15 20 25
-328.7329597 -328.7329597
-500 Bottom steel
Similarly
As= 0.0425a
0.000726 = 0.0425a(0.68-a/2)
2
= 0.0289a-0.02125a
2
0.0289a-0.02125a -0.00073=0 So a= 0.02575
-0.02125 As= 0.00109 m2/m
0.0289 As= 1094.25 mm2/m
2
-0.00073 For steel D=25mm A= 490.874 mm
0.00077 So for spacing bars at 300mm center to center
0.02781 As provided= (490.874)(1000/300)= 1963.5 mm2/m
a= 0.02575