CR For Sap Bods: Emergency Transports
CR For Sap Bods: Emergency Transports
76 R / SR No. CR90708
Functional Consultant NA
Technical Consultant
Production System SP6 720
CR Release Proposed date of
CR Logging Date 14.09.2021 15.09.2021 07.10.2021
Date prod. movement
09 Functional Consultant No No No NA
Acceptance Test (FAT)
10 FAT Reviewed by No No No NA
TL/FM
11 User Acceptance Test No No No NA
(UAT)
12 Tree structure of Yes No Yes 06.10.2021
transport request
Sr. No. TR Number Date Created Actual date of quality Actual date of prod.
movement movement
1. DS6K924237 06.10.2021 07.10.2021 07.10.2021
2. DS6K924239 06.10.2021 07.10.2021 07.10.2021
3. DS6K924241 06.10.2021 07.10.2021 07.10.2021
EMERGENCY TRANSPORTS JUSTIFICATION : NA
Check list document for request transpost
If a restore is required it must be authorized by the Systems Manager and the Basis Head.
The Back out / Contingency plan must include In order to Back out / Reverse the change the
detailed steps that are required to blackout any following needs to take place;
change that has taken place.
1)
Failure to complete a Back out / Contingency
plan will result in delays when raising the Change 2)
Request.
3)