Cable Inspection Check List

This document is an inspection checklist for upgrading the public address and general alarm system at KJO. It involves inspecting PAGA cables for length, insulation resistance, continuity and correct number of cores. It also checks that cable trays, flexible conduits and underground cable laying have been installed properly, including any required excavation or scaffolding. The inspection verifies that the upgrade work meets contract GT629IT19 specifications.

Uploaded by

Numan Saleem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
89% found this document useful (9 votes)
9K views1 page

Cable Inspection Check List

This document is an inspection checklist for upgrading the public address and general alarm system at KJO. It involves inspecting PAGA cables for length, insulation resistance, continuity and correct number of cores. It also checks that cable trays, flexible conduits and underground cable laying have been installed properly, including any required excavation or scaffolding. The inspection verifies that the upgrade work meets contract GT629IT19 specifications.

Uploaded by

Numan Saleem
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Upgrade of KJO’s Public Address &

General Alarm System

Contract: GT629IT19

Date:
INSPECTION CHECKLIST
DESCRIPTION: PAGA Cable Inspection

LOCATION: AREA:

DRAWING#: FROM STN# TO STN#:


PAGING STATION
CABLE TAG#:
MANUFACTURER:

INSPECTION ITEMS Results Remarks

1. Check length of the cable meter

2. Check Insulation Resistance of the


cable

3. Check Continuity of the cable Ok  Not ok 

4. Check the no. of Cable Core for Paging


16 Core  >16 Core  <16 Core 
Stations
5. Check the No. of Cable Core for
4 Core  >4 Core  < 4 Core 
Speaker
6. Check the flexible conduit installed
Yes  No 
with all required accessories

7. Check the Cable Tray Installed for ~Length


Yes  No 
cable laying

8. Check Conduit Installed for cable ~Length


Yes  No 
laying
~Length
9. Check Underground cable laying Yes  No 

10. Check Excavation Required for ~Length


Yes  No 
Underground Cable Laying
11. Check Scaffolding Required for New ~Height
Yes  No 
Cable Laying

Project Manager Name: Abdul Raheem - Survey Engineer Name:

Signature / Date Signature / Date