Weekly Progress Report No 24 en and FR
Weekly Progress Report No 24 en and FR
NAVIGATOR
Page 5 of 84
22 100 % 100 % 65 % 22
COMPLETION FOR
NTP FOR SEGMENT 4
PROJECT NTP FOR NTP FOR
CONSTRUCTION 22 FEB 2022
COMMENCEMENT CONSTRUCTION CONSTRUCTION
FOR SEGMENT 4 FOR SEGMENT 5 &6 FOR SEGMENT 1 &3
DATE- 22 JAN OVERALL PROJECT
22 MAR 2021 22 JUN 2021 22 SEP 2021
2021 COMPLETION DATE-
22 JUL 2022
NTP FOR
NTP FOR
DETAILED
DETAILED
DESIGN FOR
DESIGN FOR
SEGMENT 4,5 & 6
SEGMENT 1, 2 & 3
- 22 JAN 2021
22 APR 2021
2021 2022
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18
NAVIGATOR
Page 6 of 84
KEY HIGHLIGHTS :
NAVIGATOR
Page 7 of 84
Submitted to
DEVIATION CICO on 22-JUL-21 24-JUL-21 08-AUG-21 10-SEP-21
STATEMENT
1st July 21
GEOMETRY
SUBFOLDER Submitted to 22-JUL-21 24-JUL-21 08-AUG-21 10-SEP-21
PLAN DRAWING
CICO on
1st July 21
Approved by
Submitted to CICO/
PROFILE CICO on 22-JUL-21 24-JUL-21 08-AUG-21 10-SEP-21
DRAWING Commented by
1st July 21 SAG & IE
HYDRAULIC
DETAILED DESIGN 23-AUG-21 25-SEP-21
REPORT Approved by
HYDRAULIC
CICO/
SUBFOLDER 22-JUL-21 08-AUG-21
Commented by
LONGITUDINAL SAG & IE
DRAINAGE TYPICAL 23-AUG-21 25-SEP-21
DRAWINGS
NAVIGATOR
Page 8 of 84
Hydraulic Longitudinal
Subfolder drainage Detailed 22- Jul-21 8-Aug-21 23-Aug-21 25-Sep-21
Drawings
Pavement
Detailed Design Submitted to
15-Jul-21 19-Jul-21 30-Jul-21
Report CICO
Roadway and
Pavement Aggregate-
Subfolder Submitted Submitted Submitted Submitted Submitted Submitted
Technical
Bitumen-Technical
Characteristics Submitted Submitted Submitted Submitted Submitted Submitted
NAVIGATOR
Page 9 of 84
Environment
Subfolder Environmental and
Social
Submitted Submitted Submitted Submitted 17-Aug-21 31-Aug-21
Management Plans
Vertical signage
07-Aug-21 07-Aug-21 07-Aug-21 07-Aug-21 07-Aug-21 16-Aug-21
Safety and arrangements
Operating
Equipment
Subfolder
Horizontal signage
07-Aug-21 07-Aug-21 07-Aug-21 07-Aug-21 07-Aug-21 16-Aug-21
arrangement
Key points of
Synthetic file submitted designs 09-Aug-21 09-Aug-21 09-Aug-21 09-Aug-21 09-Aug-21 18-Aug-21
NAVIGATOR
Page 10 of 84
3 Training No's 2
4 Permits No's 36
5 Checklists No's 41
NAVIGATOR
Page 11 of 84
NAVIGATOR
Page 12 of 84
NAVIGATOR
Page 13 of 84
To be procured Planned
Till last Cum Till 10th Consumption
S.NO Material UOM This Week for next 2 Consumption
week July 21 for Jul’21
weeks for 2 Weeks
NAVIGATOR
Page 14 of 84
COMPLETIO
LOCATION/ TOTAL
ACTIVITY SEGMENT UNIT SCOPE BALANCE N JUL'21 AUG'21
FACILITY COMPLETED
%
LATERITE BORROW
AREA SAMPLING SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%
AND TESTING
SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10
SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10
NAVIGATOR
Page 15 of 84
TOTAL COMPLETI
LOCATION/
ACTIVITY SEGMENT UNIT SCOPE COMPLETE BALANCE ON JUL'21 AUG'21
FACILITY
D %
3.55 4.48
NAVIGATOR
Page 16 of 84
TOTAL COMPLETIO
LOCATION/
ACTIVITY SEGMENT UNIT SCOPE COMPLETE BALANCE N JUL'21 AUG'21
FACILITY
D %
SAG
% 100% 46% 54% 46% 25% 10% 9%
ACCOMODATION
CAMP FACILITY BASE
INTERNAL ROAD PK49.75
CAMP 1
WORKS-LATERITE M 1612 1,550 62 96% 62
BOULDER
INTERNAL ROAD
M 1612 1,200 412 74% 412
WORKS-GNT
AFCONS
ACCOMODATION
NOS 42 32 10 76% 5 5
CONTAINERS
SHIFTING
NAVIGATOR
Page 17 of 84
NAVIGATOR
Page 18 of 84
Asphalt Cutting is in GNT Works is in progress at PK Earthworks is in progress at Conveyor Belt erected at
progress at PK 59 RHS 60+950 LHS PK 57 Crusher Plant
Existing Platform Soil Machinery Inspection by Hot Mix Plant Commission GNT Works is in progress at PK.
Sampling at PK 40 LHS HSE Team at PK 50 works completed at PK.50 54+250 LHS
NAVIGATOR
Page 19 of 84
169 OF
547 T OTAL DES HEURES DE SÉCURITÉ EFFECT UÉES
STATIQUE DE LA MÉTÉO
2 MM DE 10
JOURS DURÉE SUR LE PROJET
358,810 PRÉCIPITATIONS
NAVIGATOR
Page 20 of 84
MISE À JOUR
HEBDOMADAIRE L'ÉTAT DU PROJET
TRAVAUX
DÉMARRAGE
Monday
D'ARPENTAGE
ENQUÊTE MOBILISATION FINS
Monday
GÉOTECHNIQUE POUR
TERMINÉS POUR LE
JAN 2021 PK50-PK75.
PK50-PK75. JUL 2022
22 100 % 100 % 65 % 22
ACHEVEMENT POUR
NTP POUR NTP DE NTP DE LE SEGMENT 4
DATE DE DÉBUT CONSTRUCTION CONSTRUCTION CONSTRUCTION 22 FÉVRIER 2022
DU PROJET - 22 POUR LE POUR LES POUR LES
JANVIER 2021 SEGMENT 4 22 SEGMENTS 5 & 6 SEGMENTS 1 ET 3 DATE GLOBALE D'ACH ACH
MAR 2021 22 JUIN 2021 22 SEP 2021 ACHÈVEMENT DU PROJET-
NTP POUR LA 22 JUILLET 2022
CONCEPTION NTP POUR LA
DÉTAILLÉE DES CONCEPTION
SEGMENTS 4, 5 DÉTAILLÉE POUR
ET 6 LES SEGMENTS 1,
- 22 JAN 2021 2 ET 3 22 AVR
2021
2021 2022
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18
NAVIGATOR
Page 21 of 84
MISE À JOUR
HEBDOMADAIRE POINTS FORTS DE CETTE SEMAINE
POINTS CLÉS :
NAVIGATOR
Page 22 of 84
MISE À JOUR
HEBDOMADAIRE ÉTAT DE LA CONCEPTION
SOUS- TITRE DE LA PK 50.00 TO PK 56.10 TO PK 95.00 TO
PK 61.30 TO PK75 PK 40 TO PK50 PK 24 TO PK40
DOSSIERS SOUMISSION PK56.10 PK61.3 PK105
DÉCLARATION
SOUMIS AU CICO 22 JUILLET 21 24 JUILLET 21 08-AOÛT-21 10 SEPTEMBRE 21
D'ÉCART
SOUS-DOSSIER
GÉOMÉTRIE DESSIN EN PLAN SOUMIS AU CICO 22 JUILLET 21 24 JUILLET 21 08-AOÛT-21 10 SEPTEMBRE 21
Approuvé par
SOUMIS AU
DESSIN DE PROFIL CICO/ commenté 22 JUILLET 21 24 JUILLET 21 08-AOÛT-21 10 SEPTEMBRE 21
CICO
par SAG & IE
RAPPORT DE
CONCEPTION
23 AOÛT 21 25 SEPTEMBRE 21
DÉTAILLÉE
HYDRAULIQUE Approuvé par CICO/
SOUS-DOSSIER
commenté par SAG 22 JUILLET 21 08-AOÛT-21
HYDRAULIQUE
& IE
DRAINAGE
LONGITUDINAL 23 AOÛT 21 25 SEPTEMBRE 21
DESSINS TYPES
NAVIGATOR
Page 23 of 84
MISE À JOUR
HEBDOMADAIRE ÉTAT DE LA CONCEPTION
SOUS- TITRE DE LA PK 50.00 TO PK 56.10 TO PK 61.30 TO PK 95.00 TO
PK 40 TO PK50 PK 24 TO PK40
DOSSIERS SOUMISSION PK56.10 PK61.3 PK75 PK105
DESSINS
SOUS- 25
DÉTAILLÉS DU
DOSSIER 22- JUILLET-21 8 AOÛT 21 23 AOÛT 21 SEPTEMBRE
DRAINAGE
HYDRAULIQU 21
LONGITUDINAL
E
RAPPORT DE
CONCEPTION
SOUMIS À CICO 15 JUILLET 21 19 JUILLET 21 30 JUILLET 21
DÉTAILLÉE DE
SOUS- LA CHAUSSÉE
DOSSIER
CHAUSSÉES AGRÉGAT-
ET SOUMIS SOUMIS SOUMIS SOUMIS SOUMIS SOUMIS
TECHNIQUE
TROTTOIRS
BITUME -
CARACTÉRISTIQU SOUMIS SOUMIS SOUMIS SOUMIS SOUMIS SOUMIS
ES TECHNIQUES
NAVIGATOR
Page 24 of 84
MISE À JOUR
HEBDOMADAIRE ÉTAT DE LA CONCEPTION
SOUS- TITRE DE LA PK 50.00 TO PK 56.10 TO PK 61.30 TO PK 95.00 TO
PK 40 TO PK50 PK 24 TO PK40
DOSSIERS SOUMISSION PK56.10 PK61.3 PK75 PK105
SOUS-
DOSSIER PLANS DE
ENVIRONNE GESTION
MENT SOUMIS SOUMIS SOUMIS SOUMIS 17 AOÛT 21 31 AOÛT 21
ENVIRONNEMENT
ALE ET SOCIALE
DISPOSITIFS DE
SOUS- SIGNALISATION 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 16 AOÛT 21
DOSSIER VERTICALE
SÉCURITÉ ET
MATÉRIEL
D'EXPLOITATI DISPOSITION
ON HORIZONTALE DE
07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 16 AOÛT 21
LA
SIGNALISATION
FICHIER
SYNTHÉTIQU
POINTS CLÉS DES
E 09-AOÛT-21 09-AOÛT-21 09-AOÛT-21 09-AOÛT-21 09-AOÛT-21 18 AOÛT 21
PROJETS SOUMIS
NAVIGATOR
Page 25 of 84
MISE À JOUR
HEBDOMADAIRE RAPPORT DE SÉCURITÉ
RAPPORT HEBDOMADAIRE HSE
3 FORMATION No's 2
4 PERMIS No's 36
NAVIGATOR
Page 26 of 84
NAVIGATOR
Page 27 of 84
A ACHETER CONSOMMATIO
JUSQU'À LA CONSOMMATIO
S.N CETTE CUM JUSQU'AU POUR LES 2 N PRÉVUE
MATÉRIEL UDM SEMAINE N POUR
O SEMAINE 10 JUILLET 21 PROCHAINES POUR 2
DERNIÈRE JUILLET 21
SEMAINES SEMAINES
NAVIGATOR
Page 28 of 84
NAVIGATOR
Page 29 of 84
MISE À JOUR
HEBDOMADAIRE PLAN D'AMÉNAGEMENT - 4 SEMAINES
LOOK AHEAD PLAN
COMPLETIO
LOCATION/ TOTAL
ACTIVITY SEGMENT UNIT SCOPE BALANCE N JUL'21 AUG'21
FACILITY COMPLETED
%
LATERITE BORROW
AREA SAMPLING SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%
AND TESTING
SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10
SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10
NAVIGATOR
Page 30 of 84
MISE À JOUR
HEBDOMADAIRE PLAN D'AMÉNAGEMENT - 4 SEMAINES
LOOK AHEAD PLAN
TOTAL COMPLETI
LOCATION/
ACTIVITY SEGMENT UNIT SCOPE COMPLETE BALANCE ON JUL'21 AUG'21
FACILITY
D %
3.55 4.48
NAVIGATOR
Page 31 of 84
MISE À JOUR
HEBDOMADAIRE PLAN D'AMÉNAGEMENT - 4 SEMAINES
LOOK AHEAD PLAN
TOTAL COMPLETIO
LOCATION/
ACTIVITY SEGMENT UNIT SCOPE COMPLETE BALANCE N JUL'21 AUG'21
FACILITY
D %
SAG
% 100% 46% 54% 46% 25% 10% 9%
ACCOMODATION
CAMP FACILITY BASE
INTERNAL ROAD PK49.75
CAMP 1
WORKS-LATERITE M 1612 1,550 62 96% 62
BOULDER
INTERNAL ROAD
M 1612 1,200 412 74% 412
WORKS-GNT
AFCONS
ACCOMODATION
NOS 42 32 10 76% 5 5
CONTAINERS
SHIFTING
NAVIGATOR
Page 32 of 84
MISE À JOUR
HEBDOMADAIRE SOUTIEN NÉCESSAIRE
SOUTIEN NÉCESSAIRE:
Accélérer la remise des terrains pour les opérations de construction sur le site.
Une instruction de modification concernant les dessins approuvés par le ministère
est attendue.
NAVIGATOR
Page 33 of 84
MISE À JOUR
HEBDOMADAIRE LES PHOTOS
La coupe de l'asphalte est en cours GNT Travaux en cours à PK Les travaux de terrassement sont en Bande transporteuse érigée dans une
au PK 59 RHS 60+950 LHS cours au PK 57 usine de concassage .
Échantillonnage du sol de la plate- Inspection des machines par Centrale d'enrobage à chaud Travaux de GNT Les travaux sont en cours à PK.
forme existante au PK 40 LHS l'équipe HSE à PK 50 commission achevés à PK.50 54+250 LHS
NAVIGATOR
Page 34 of 84
Page 35 of 84
Page 36 of 84
Page 37 of 84
Page 38 of 84
Page 39 of 84
Page 40 of 84
Page 41 of 84
Page 42 of 84
Page 43 of 84
Page 44 of 84
Page 45 of 84
Page 46 of 84
Page 47 of 84
Page 48 of 84
Page 49 of 84
Page 50 of 84
Page 51 of 84
Page 52 of 84
Page 53 of 84
Page 54 of 84
Page 55 of 84
Page 56 of 84
Page 57 of 84
Page 58 of 84
Page 59 of 84
Page 60 of 84
Page 61 of 84
Page 62 of 84
Page 63 of 84
Page 64 of 84
Page 65 of 84
Page 66 of 84
Page 67 of 84
Page 68 of 84
Page 69 of 84
Page 70 of 84
Page 71 of 84
Page 72 of 84
Page 73 of 84
Page 74 of 84
Page 75 of 84
Page 76 of 84
Page 77 of 84
Page 78 of 84
Page 79 of 84
Page 80 of 84
Page 81 of 84