Weekly Progress Report No 24 en and FR

wpr en and fr

Uploaded by

Adrian Frantescu
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

Weekly Progress Report No 24 en and FR

wpr en and fr

Uploaded by

Adrian Frantescu
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 84

Revision List

Rev Date Description Remarks

0 13-07-2021 Issued for Approval

JOB NO. 5267


Weekly Progress Report No-024
DRAWING NO. WPR-AFC-5267-0024 REV.0
INDEX

01. Attach 01 of 07 - Weekly Progress Report No. -024 (English)……………………………………04-18


02. Attach 02 of 07 -Weekly Progress Report No. -024 (French)…………………………………….19-33
03. Attach 03 of 07 -Tool Box Talk………………………………………………………………………………..34-69
04. Attach 04 of 07 -Health Safety Environment Induction…………………………………………….70-75
05. Attach 05 of 07 -Safety Training……………………………………………………………………………..76-79
06. Attach 06 of 07 -NM 06.07.2021……………………………………………………………………………..80-81
07. Attach 07 of 07 -Dangerous Occurrence 09.07.2021………………………………………………..82-84

JOB NO. 5267


Weekly Progress Report No-024
DRAWING NO. WPR-AFC-5267-0024 REV.0
Page 4 of 84

GABON ROAD PROJECT SATURDAY


JULY 2021
TOTAL SAFE MANHOURS
169 OF
547 ACHIEVED ON PROJECT
WEATHER STATICS
10
DAYS DURATION
358,810 2 MM RAINFALL

REHABILITATION & UPGRADATION OF NATIONAL ROAD RN1 FROM 2x2 PK24 To PK 40


AND 2 LANE PK 40 to PK 105 ON EPC BASIS IN GABON
WEEKLY PROGRESS REPORT 24 (04th July 2021 to 10th July 2021)

 NAVIGATOR
Page 5 of 84

WEEKLY UPDATE PROJECT STATUS 


START
Monday SURVEY WORKS GEO TECHNICAL MOBILISATION FINISH
Monday

COMPLETED FOR PK50- INVESTIGATION FOR


JAN 2021 PK75. PK50-PK75. JUL 2022

22 100 % 100 % 65 % 22

COMPLETION FOR
NTP FOR SEGMENT 4
PROJECT NTP FOR NTP FOR
CONSTRUCTION 22 FEB 2022
COMMENCEMENT CONSTRUCTION CONSTRUCTION
FOR SEGMENT 4 FOR SEGMENT 5 &6 FOR SEGMENT 1 &3
DATE- 22 JAN OVERALL PROJECT
22 MAR 2021 22 JUN 2021 22 SEP 2021
2021 COMPLETION DATE-
22 JUL 2022
NTP FOR
NTP FOR
DETAILED
DETAILED
DESIGN FOR
DESIGN FOR
SEGMENT 4,5 & 6
SEGMENT 1, 2 & 3
- 22 JAN 2021
22 APR 2021

2021 2022
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18

 NAVIGATOR
Page 6 of 84

WEEKLY UPDATE KEY HIGHLIGHTS OF THIS WEEK 

KEY HIGHLIGHTS :

 Employer Office Internal partition and framing works completed .


 SAG Accommodation Internal partition works is in progress.
 CICO Internal Partition Painting and framing works completed.
 Earthworks works started on RHS at PK 57 to 59 .
 Asphalt Cutting works started on RHS at 57 to 59.
 Hot Mix Plant Commissioning works completed.
 Soil sampling works completed at PK. 40 to PK. 50 on LHS.
 Conveyor belt erected at Crusher Plant.
 SAG Environmental team visited Crusher plant.
 Regular Tool Box Talks, Safety Meeting ongoing at site

 NAVIGATOR
Page 7 of 84

WEEKLY UPDATE DESIGN STATUS 


PK 50.00 TO PK 56.10 TO PK 95.00 TO
SUBFOLDERS SUBMISSION TITLE PK 61.30 TO PK75 PK 40 TO PK50 PK 24 TO PK40
PK56.10 PK61.3 PK105

Submitted to
DEVIATION CICO on 22-JUL-21 24-JUL-21 08-AUG-21 10-SEP-21
STATEMENT
1st July 21

GEOMETRY
SUBFOLDER Submitted to 22-JUL-21 24-JUL-21 08-AUG-21 10-SEP-21
PLAN DRAWING
CICO on
1st July 21
Approved by
Submitted to CICO/
PROFILE CICO on 22-JUL-21 24-JUL-21 08-AUG-21 10-SEP-21
DRAWING Commented by
1st July 21 SAG & IE

HYDRAULIC
DETAILED DESIGN 23-AUG-21 25-SEP-21
REPORT Approved by
HYDRAULIC
CICO/
SUBFOLDER 22-JUL-21 08-AUG-21
Commented by
LONGITUDINAL SAG & IE
DRAINAGE TYPICAL 23-AUG-21 25-SEP-21
DRAWINGS

 NAVIGATOR
Page 8 of 84

WEEKLY UPDATE DESIGN STATUS 


SUBFOLDER SUBMISSION PK 50.00 TO PK 56.10 TO PK 61.30 TO PK 95.00 TO
PK 40 TO PK50 PK 24 TO PK40
S TITLE PK56.10 PK61.3 PK75 PK105

Hydraulic Longitudinal
Subfolder drainage Detailed 22- Jul-21 8-Aug-21 23-Aug-21 25-Sep-21
Drawings

Cut and Fill Approved by Approved by


Earthworks
synoptic and CICO/ CICO/ Submitted to
Subfolder 27-Jul-21 11-Aug-21 13-Sep-21
quantities Commented by Commented by CICO
SAG & IE SAG & IE

Pavement
Detailed Design Submitted to
15-Jul-21 19-Jul-21 30-Jul-21
Report CICO
Roadway and
Pavement Aggregate-
Subfolder Submitted Submitted Submitted Submitted Submitted Submitted
Technical

Bitumen-Technical
Characteristics Submitted Submitted Submitted Submitted Submitted Submitted

 NAVIGATOR
Page 9 of 84

WEEKLY UPDATE DESIGN STATUS 


SUBFOLDER SUBMISSION PK 50.00 TO PK 56.10 TO PK 61.30 TO PK 95.00 TO
PK 40 TO PK50 PK 24 TO PK40
S TITLE PK56.10 PK61.3 PK75 PK105

Environment
Subfolder Environmental and
Social
Submitted Submitted Submitted Submitted 17-Aug-21 31-Aug-21
Management Plans

Vertical signage
07-Aug-21 07-Aug-21 07-Aug-21 07-Aug-21 07-Aug-21 16-Aug-21
Safety and arrangements
Operating
Equipment
Subfolder
Horizontal signage
07-Aug-21 07-Aug-21 07-Aug-21 07-Aug-21 07-Aug-21 16-Aug-21
arrangement

Key points of
Synthetic file submitted designs 09-Aug-21 09-Aug-21 09-Aug-21 09-Aug-21 09-Aug-21 18-Aug-21

 NAVIGATOR
Page 10 of 84

WEEKLY UPDATE SAFETY REPORT 


HSE WEEKLY REPORT

S.no Activity Uom This Week


1 HSE Induction No's 10

2 Toolbox talk No's 35

3 Training No's 2

4 Permits No's 36

5 Checklists No's 41

6 Near miss Cases No's 01

7 First Aid cases No's 6

8 Dangerous occurrence No’s 1

 NAVIGATOR
Page 11 of 84

WEEKLY UPDATE MACHINERY MOBILISATION STATUS AND SCHEDULE 


DESCRIPTION OF PLANT &
CAPACITY PLAN MOBILISED BALANCE EXPECTED TO REACH
MACHINERY

Excavator 20/30T 8 7 1 3rd Week Jul’21


Crawler Bull Dozer D6 2 2 - -
Motor Grader 120 K 5 2 3 3rd Week Jul’21
Soil Compactors 10T 6 3 3 3rd Week Jul’21
Tractor Dozer 75 HP 2 1 1 3rd Week Jul’21
Dumpers 25/40T 66 55 11 1st Week Aug’21
Stone Crusher 250TPH 1 1 -
Wheel Loader 2.1 CUM 6 3 3 1st Week Aug’21
Backhoe Loader 0.3 CUM 4 2 2 3rd Week Jul’21
Concrete Batching Plant 30 CUM/HR 1 1 -
Hot Mix Plant 260 / 120 TPH 1 1 - Last Week Oct’21
Transit Mixer 6CUM 10 10 -
Asphalt Paver 9/10M WIDTH 2 1 1 Last Week Oct’21
Tandem Rollers 14T 4 2 2 Last Week Oct’21
PTR 24T 2 1 1 Last Week Oct’21

 NAVIGATOR
Page 12 of 84

WEEKLY UPDATE MANPOWER STATUS AND SCHEDULE 


EXPATS+NATIO
S.NO MANPOWER
NAL
1 Project Manager 1
2 QS, Contracts , and Planning 6
3 QA/QC Team 5
4 Design Team 1
5 Execution Team ( Road & Structure) 10
6 Environment Engineer 2
7 Health & Safety Engineer 2
8 Store & Logistics 4
9 Doctor 1
10 CPE Team 6
11 Survey Team 2
12 Accounts 2
13 Admin 5
14 Document Controller 1
15 Execution Foremen 9
16 Others ( Cook, Store , and Time Keeper Etc.,) 33

17 Skilled /Unskilled Workforce 310


TOTAL 400

 NAVIGATOR
Page 13 of 84

WEEKLY UPDATE MATERIAL PROCUREMENT STATUS AND SCHEDULE 

MATERIAL PROCUREMENT VS CONSUMPTION

To be procured Planned
Till last Cum Till 10th Consumption
S.NO Material UOM This Week for next 2 Consumption
week July 21 for Jul’21
weeks for 2 Weeks

1 Aggregates T 17,778 3,243 21,021 8,890 4,977 539

2 Bitumen T 2,700 - 2,700 - - -

 NAVIGATOR
Page 14 of 84

WEEKLY UPDATE LOOK AHEAD PLAN- 4 WEEKS 


LOOK AHEAD PLAN

COMPLETIO
LOCATION/ TOTAL
ACTIVITY SEGMENT UNIT SCOPE BALANCE N JUL'21 AUG'21
FACILITY COMPLETED
%

WEEK 3 WEEK 4 WEEK 5 WEEK 1

LATERITE BORROW
AREA SAMPLING SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%
AND TESTING

SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%

HYDRAULIC DESIGN RESUBMISSION


PK50.1-PK75.1 KM 25 25 - 100%
REPORT SEGMENT 4

SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10

SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%

PAVEMENT DESIGN RESUBMISSION


PK50.1-PK75.1 KM 25 25 - 100%
REPORT SEGMENT 4

SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10

SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%


PLAN AND PROFILE
DRAWINGS AND RESUBMISSION
DRAINAGE PK50.1-PK75.1 KM 25 5 20 21% 6 14
SEGMENT 4
DRAWINGS
SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10

 NAVIGATOR
Page 15 of 84

WEEKLY UPDATE LOOK AHEAD PLAN- 4 WEEKS 


LOOK AHEAD PLAN

TOTAL COMPLETI
LOCATION/
ACTIVITY SEGMENT UNIT SCOPE COMPLETE BALANCE ON JUL'21 AUG'21
FACILITY
D %

WEEK 3 WEEK 4 WEEK 5 WEEK 1

CLEARING & 1.50 3.10 1.50 1.00


GRUBBING ROAD SEGMENT 4 PK50.1-PK75.1 KM 25 7.30 18 29%
PK 59 TO PK PK.56 TO PK.60 PK 54 TO
WORKS PK 62 TO PK 65
62 RHS PK 56 RHS

2.97 3.00 1.78 2.00


PAVEMENT CUTTING SEGMENT 4 PK50.1-PK75.1 KM 25.00 4.18 20.83 17%
PK 50 TO PK 50 TO PK 52 TO
PK 57 TO PK 61
56 LHS 52 RHS PK 56 RHS

3.07 1.00 2.78


EMBANKMENT SEGMENT 4 PK50.1-PK75.1 KM 25.00 3.80 21.20 15% PK 52 TO 54
PK 54 TO
LHS & PK 56 PK 50 TO PK 56
PK56 LHS
TO PK 61 RHS

3.55 4.48

LATERITE CAPPING SEGMENT 4 PK50.1-PK75.1 KM 25.00 1.73 23.28 7% PK 52 TO PK 56


PK 50/ PK 52
& PK 50 TO
L, PK56/ PK61R
PK 55

0.67 0.87 4.95 2.40


GNT (SUB BASE) SEGMENT 4 PK50.1-PK75.1 KM 25.00 1.63 23.38 7% PK 50 TO PK 56 PK 54 TO PK 55
PK 59 TO PK PK 56 TO PK
/ PK 57 TO / PK 60 TO
61 LHS 57 LHS
PK 61 PK 61

 NAVIGATOR
Page 16 of 84

WEEKLY UPDATE LOOK AHEAD PLAN- 4 WEEKS 


LOOK AHEAD PLAN

TOTAL COMPLETIO
LOCATION/
ACTIVITY SEGMENT UNIT SCOPE COMPLETE BALANCE N JUL'21 AUG'21
FACILITY
D %

WEEK 3 WEEK 4 WEEK 5 WEEK 1

WORKSHOP % 100% 60% 40% 60% 20% 10% 10%

STORE % 100% 100% - 100%

ICO OFFICE % 100% 98% 2% 98% 1.0% 1.0%

SAG OFFICE % 100% 65% 35% 65% 15% 15% 5%

SAG
% 100% 46% 54% 46% 25% 10% 9%
ACCOMODATION
CAMP FACILITY BASE
INTERNAL ROAD PK49.75
CAMP 1
WORKS-LATERITE M 1612 1,550 62 96% 62
BOULDER

INTERNAL ROAD
M 1612 1,200 412 74% 412
WORKS-GNT
AFCONS
ACCOMODATION
NOS 42 32 10 76% 5 5
CONTAINERS
SHIFTING

260TPH HOT MIX


% 100% 100% 0% 100%
PLANT

MAKORA CRUSHER CRUSHER PLANT


MAKORA % 100% 90% 10% 90% 10%
AREA ACTIVITIES

 NAVIGATOR
Page 17 of 84

WEEKLY UPDATE SUPPORT REQUIRED 


SUPPORT REQUIRED:

 Expediting of Euro payments against 2nd and 3rd Payment Milestone.


 Support in arranging Mining Authorization Extension to M/s. CG2I being legal owner of
the quarry till date as per the Article 105, 106 and 32 of Mining Code of Gabon.
 Requesting for partial drawing clearance for starting physical works at site.
 Intervention in expediting VISA process for expats.
 Facilitation for royalty exemption for the earth, laterite and sand being project of national
importance as per taxation rules of Gabon and precedence of earlier projects executed
in Gabon.
 Expediting land handing over for construction operation at site.
 Variation instruction regarding Ministry approved drawings awaited.
KEY HIGHLIGHTS

 NAVIGATOR
Page 18 of 84

WEEKLY UPDATE SITE PHOTOS 

Asphalt Cutting is in GNT Works is in progress at PK Earthworks is in progress at Conveyor Belt erected at
progress at PK 59 RHS 60+950 LHS PK 57 Crusher Plant

Existing Platform Soil Machinery Inspection by Hot Mix Plant Commission GNT Works is in progress at PK.
Sampling at PK 40 LHS HSE Team at PK 50 works completed at PK.50 54+250 LHS

 NAVIGATOR
Page 19 of 84

PROJET DE ROUTE DU GABON SAMEDI


JUILLET
2021

169 OF
547 T OTAL DES HEURES DE SÉCURITÉ EFFECT UÉES
STATIQUE DE LA MÉTÉO
2 MM DE 10
JOURS DURÉE SUR LE PROJET
358,810 PRÉCIPITATIONS

RÉHABILITATION & AMÉLIORATION DE LA ROUTE NATIONALE RN1 DE 2x2 PK24 À


PK 40 ET 2 VOIES PK 40 à PK 105 SUR BASE EPC AU GABON RAPPORT
D'AVANCEMENT HEBDOMADAIRE 23 (04e juillet 2021 au 10 juillet 2021)

 NAVIGATOR
Page 20 of 84

MISE À JOUR
HEBDOMADAIRE L'ÉTAT DU PROJET 
TRAVAUX
DÉMARRAGE
Monday

D'ARPENTAGE
ENQUÊTE MOBILISATION FINS
Monday

GÉOTECHNIQUE POUR
TERMINÉS POUR LE
JAN 2021 PK50-PK75.
PK50-PK75. JUL 2022

22 100 % 100 % 65 % 22

ACHEVEMENT POUR
NTP POUR NTP DE NTP DE LE SEGMENT 4
DATE DE DÉBUT CONSTRUCTION CONSTRUCTION CONSTRUCTION 22 FÉVRIER 2022
DU PROJET - 22 POUR LE POUR LES POUR LES
JANVIER 2021 SEGMENT 4 22 SEGMENTS 5 & 6 SEGMENTS 1 ET 3 DATE GLOBALE D'ACH ACH
MAR 2021 22 JUIN 2021 22 SEP 2021 ACHÈVEMENT DU PROJET-
NTP POUR LA 22 JUILLET 2022
CONCEPTION NTP POUR LA
DÉTAILLÉE DES CONCEPTION
SEGMENTS 4, 5 DÉTAILLÉE POUR
ET 6 LES SEGMENTS 1,
- 22 JAN 2021 2 ET 3 22 AVR
2021

2021 2022
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18

 NAVIGATOR
Page 21 of 84

MISE À JOUR
HEBDOMADAIRE POINTS FORTS DE CETTE SEMAINE 
POINTS CLÉS :

 Bureau de l'employeur Cloisonnement interne et travaux d'encadrement achevés.


 SAG Accommodation Les travaux de cloisonnement interne sont en cours.
 Fin des travaux de peinture et d'encadrement de la cloison intérieure CICO
 Début des travaux de terrassement sur l'ERS au PK 57 à 59.
 Les travaux de coupe d'asphalte ont commencé sur le RHS entre 57 et 59.
 Les travaux de mise en service de la centrale d'enrobage à chaud sont terminés.
 Travaux d'échantillonnage du sol achevés au PK. 40 à PK. 50 sur la LHS.
 Bande transporteuse installée dans l'usine de concassage.
 L'équipe environnementale de SAG a visité l'usine de concassage.
 Discussions régulières sur les boîtes à outils, réunions de sécurité en cours sur le site.

 NAVIGATOR
Page 22 of 84

MISE À JOUR
HEBDOMADAIRE ÉTAT DE LA CONCEPTION 
SOUS- TITRE DE LA PK 50.00 TO PK 56.10 TO PK 95.00 TO
PK 61.30 TO PK75 PK 40 TO PK50 PK 24 TO PK40
DOSSIERS SOUMISSION PK56.10 PK61.3 PK105

DÉCLARATION
SOUMIS AU CICO 22 JUILLET 21 24 JUILLET 21 08-AOÛT-21 10 SEPTEMBRE 21
D'ÉCART

SOUS-DOSSIER
GÉOMÉTRIE DESSIN EN PLAN SOUMIS AU CICO 22 JUILLET 21 24 JUILLET 21 08-AOÛT-21 10 SEPTEMBRE 21

Approuvé par
SOUMIS AU
DESSIN DE PROFIL CICO/ commenté 22 JUILLET 21 24 JUILLET 21 08-AOÛT-21 10 SEPTEMBRE 21
CICO
par SAG & IE

RAPPORT DE
CONCEPTION
23 AOÛT 21 25 SEPTEMBRE 21
DÉTAILLÉE
HYDRAULIQUE Approuvé par CICO/
SOUS-DOSSIER
commenté par SAG 22 JUILLET 21 08-AOÛT-21
HYDRAULIQUE
& IE
DRAINAGE
LONGITUDINAL 23 AOÛT 21 25 SEPTEMBRE 21
DESSINS TYPES

 NAVIGATOR
Page 23 of 84

MISE À JOUR
HEBDOMADAIRE ÉTAT DE LA CONCEPTION 
SOUS- TITRE DE LA PK 50.00 TO PK 56.10 TO PK 61.30 TO PK 95.00 TO
PK 40 TO PK50 PK 24 TO PK40
DOSSIERS SOUMISSION PK56.10 PK61.3 PK75 PK105

DESSINS
SOUS- 25
DÉTAILLÉS DU
DOSSIER 22- JUILLET-21 8 AOÛT 21 23 AOÛT 21 SEPTEMBRE
DRAINAGE
HYDRAULIQU 21
LONGITUDINAL
E

SOUS- COUPE ET Approuvé par


Approuvé par
DOSSIER REMPLISSAGE CICO/ 13 SEPTEMBRE
CICO/ commenté SOUMIS À CICO 27 JUILLET 21 11 AOÛT 21
EARTHWORK SYNOPTIQUE ET commenté par 21
par SAG & IE
S QUANTITÉS SAG & IE

RAPPORT DE
CONCEPTION
SOUMIS À CICO 15 JUILLET 21 19 JUILLET 21 30 JUILLET 21
DÉTAILLÉE DE
SOUS- LA CHAUSSÉE
DOSSIER
CHAUSSÉES AGRÉGAT-
ET SOUMIS SOUMIS SOUMIS SOUMIS SOUMIS SOUMIS
TECHNIQUE
TROTTOIRS
BITUME -
CARACTÉRISTIQU SOUMIS SOUMIS SOUMIS SOUMIS SOUMIS SOUMIS
ES TECHNIQUES

 NAVIGATOR
Page 24 of 84

MISE À JOUR
HEBDOMADAIRE ÉTAT DE LA CONCEPTION 
SOUS- TITRE DE LA PK 50.00 TO PK 56.10 TO PK 61.30 TO PK 95.00 TO
PK 40 TO PK50 PK 24 TO PK40
DOSSIERS SOUMISSION PK56.10 PK61.3 PK75 PK105

SOUS-
DOSSIER PLANS DE
ENVIRONNE GESTION
MENT SOUMIS SOUMIS SOUMIS SOUMIS 17 AOÛT 21 31 AOÛT 21
ENVIRONNEMENT
ALE ET SOCIALE

DISPOSITIFS DE
SOUS- SIGNALISATION 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 16 AOÛT 21
DOSSIER VERTICALE
SÉCURITÉ ET
MATÉRIEL
D'EXPLOITATI DISPOSITION
ON HORIZONTALE DE
07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 07-AOÛT-21 16 AOÛT 21
LA
SIGNALISATION
FICHIER
SYNTHÉTIQU
POINTS CLÉS DES
E 09-AOÛT-21 09-AOÛT-21 09-AOÛT-21 09-AOÛT-21 09-AOÛT-21 18 AOÛT 21
PROJETS SOUMIS

 NAVIGATOR
Page 25 of 84

MISE À JOUR
HEBDOMADAIRE RAPPORT DE SÉCURITÉ 
RAPPORT HEBDOMADAIRE HSE

S.no Activity Uom CETTE SEMAINE

1 INDUCTION HSE No's 10

2 TOOL BOX TALK No's 35

3 FORMATION No's 2

4 PERMIS No's 36

5 LISTES DE CONTRÔLE No's 41

6 CAS DE QUASI-INCIDENTS No's 01


CAS DE PREMIERS
7 SECOURS
No's 6

 NAVIGATOR
Page 26 of 84

MATÉRIEL, MACHINERIE, MAIN-D'ŒUVRE ÉTAT ET


MISE À JOUR
HEBDOMADAIRE CALENDRIER DE LA MOBILISATION 
DESCRIPTION DE L'USINE ET DES
CAPACITÉ PLAN MOBILISÉ ÉQUILIBRE ATTEINTE ATTENDUE
MACHINES

PELLE 20/30T 8 7 1 DEUXIÈME SEMAINE 21 JUILLET


BULLDOZER SUR CHENILLES D6 2 2 - -
NIVELEUSE 120 K 5 2 3 DEUXIÈME SEMAINE 21 JUILLET
COMPACTEURS DE SOL 10T 6 3 3 DEUXIÈME SEMAINE 21 JUILLET
TRACTEUR BULLDOZER 75 HP 2 1 1 DEUXIÈME SEMAINE 21 JUILLET
TOMBEREAUX 25/40T 66 55 11 DEUXIÈME SEMAINE 21 JUILLET
CONCASSEUR 200TPH 1 1 -
CHARGEUSE SUR PNEUS 2.1 CUM 6 3 3 PREMIÈRE SEMAINE 21 AOÛT
CHARGEUSE-PELLETEUSE 0.3 CUM 4 2 2 DEUXIÈME SEMAINE 21 JUILLET
CENTRALE À BÉTON 30 CUM/HR 1 1 -
LA SEMAINE DERNIÈRE 21
USINE DE MÉLANGE À CHAUD 260 / 120 TPH 1 1 -
OCTOBRE
MÉLANGEUR DE TRANSIT 6CUM 10 10 -
LA SEMAINE DERNIÈRE 21
PAVÉ D'ASPHALTE 9/10M WIDTH 2 1 1
OCTOBRE
LA SEMAINE DERNIÈRE 21
ROULEAUX TANDEM 14T 4 2 2
OCTOBRE
LA SEMAINE DERNIÈRE 21
RPT 24T 2 1 1
OCTOBRE

 NAVIGATOR
Page 27 of 84

MATÉRIEL, MACHINERIE, MAIN-D'ŒUVRE ÉTAT ET


MISE À JOUR
HEBDOMADAIRE CALENDRIER DE LA MOBILISATION 
WEEKLY MATERIAL PROCUREMENT

A ACHETER CONSOMMATIO
JUSQU'À LA CONSOMMATIO
S.N CETTE CUM JUSQU'AU POUR LES 2 N PRÉVUE
MATÉRIEL UDM SEMAINE N POUR
O SEMAINE 10 JUILLET 21 PROCHAINES POUR 2
DERNIÈRE JUILLET 21
SEMAINES SEMAINES

1 AGRÉGATS TA 17,778 3,243 21,021 8,890 4,977 539

2 BITUME T 2,700 - 2,700 - - -

 NAVIGATOR
Page 28 of 84

MATÉRIEL, MACHINERIE, MAIN-D'ŒUVRE ÉTAT ET


MISE À JOUR
HEBDOMADAIRE CALENDRIER DE LA MOBILISATION 
EXPATS+NATIO
S.NO MANPOWER
NAUX
1 Chef de projet 1
2 QS, Contrats, et Planification 6
3 Équipe AQ/CQ 5
4 Équipe de conception 1
5 Équipe d'exécution (route et structure) 10
6 Ingénieur en environnement 2
7 Ingénieur en santé et sécurité 2
8 Magasin et logistique 4
9 Docteur 1
10 Équipe CPE 6
11 Équipe d'enquête 2
12 Comptes 2
13 Admin 5
14 Contrôleur de documents 1
15 Contremaîtres d'exécution 9
16 Autres (cuisinier, magasin, garde-temps, etc.) 33
17 Main-d'œuvre qualifiée/non qualifiée 310
TOTAL 400

 NAVIGATOR
Page 29 of 84

MISE À JOUR
HEBDOMADAIRE PLAN D'AMÉNAGEMENT - 4 SEMAINES 
LOOK AHEAD PLAN

COMPLETIO
LOCATION/ TOTAL
ACTIVITY SEGMENT UNIT SCOPE BALANCE N JUL'21 AUG'21
FACILITY COMPLETED
%

WEEK 3 WEEK 4 WEEK 5 WEEK 1

LATERITE BORROW
AREA SAMPLING SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%
AND TESTING

SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%

HYDRAULIC DESIGN RESUBMISSION


PK50.1-PK75.1 KM 25 25 - 100%
REPORT SEGMENT 4

SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10

SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%

PAVEMENT DESIGN RESUBMISSION


PK50.1-PK75.1 KM 25 25 - 100%
REPORT SEGMENT 4

SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10

SEGMENT 4 PK50.1-PK75.1 KM 25 25 - 100%


PLAN AND PROFILE
DRAWINGS AND RESUBMISSION
DRAINAGE PK50.1-PK75.1 KM 25 5 20 21% 6 14
SEGMENT 4
DRAWINGS
SEGMENT 6 PK95.0-PK105.0 KM 10 - 10 0% 10

 NAVIGATOR
Page 30 of 84

MISE À JOUR
HEBDOMADAIRE PLAN D'AMÉNAGEMENT - 4 SEMAINES 
LOOK AHEAD PLAN

TOTAL COMPLETI
LOCATION/
ACTIVITY SEGMENT UNIT SCOPE COMPLETE BALANCE ON JUL'21 AUG'21
FACILITY
D %

WEEK 3 WEEK 4 WEEK 5 WEEK 1

CLEARING & 1.50 3.10 1.50 1.00


GRUBBING ROAD SEGMENT 4 PK50.1-PK75.1 KM 25 7.30 18 29%
PK 59 TO PK PK.56 TO PK.60 PK 54 TO
WORKS PK 62 TO PK 65
62 RHS PK 56 RHS

2.97 3.00 1.78 2.00


PAVEMENT CUTTING SEGMENT 4 PK50.1-PK75.1 KM 25.00 4.18 20.83 17%
PK 50 TO PK 50 TO PK 52 TO
PK 57 TO PK 61
56 LHS 52 RHS PK 56 RHS

3.07 1.00 2.78


EMBANKMENT SEGMENT 4 PK50.1-PK75.1 KM 25.00 3.80 21.20 15% PK 52 TO 54
PK 54 TO
LHS & PK 56 PK 50 TO PK 56
PK56 LHS
TO PK 61 RHS

3.55 4.48

LATERITE CAPPING SEGMENT 4 PK50.1-PK75.1 KM 25.00 1.73 23.28 7% PK 52 TO PK 56


PK 50/ PK 52
& PK 50 TO
L, PK56/ PK61R
PK 55

0.67 0.87 4.95 2.40


GNT (SUB BASE) SEGMENT 4 PK50.1-PK75.1 KM 25.00 1.63 23.38 7% PK 50 TO PK 56 PK 54 TO PK 55
PK 59 TO PK PK 56 TO PK
/ PK 57 TO / PK 60 TO
61 LHS 57 LHS
PK 61 PK 61

 NAVIGATOR
Page 31 of 84

MISE À JOUR
HEBDOMADAIRE PLAN D'AMÉNAGEMENT - 4 SEMAINES 
LOOK AHEAD PLAN

TOTAL COMPLETIO
LOCATION/
ACTIVITY SEGMENT UNIT SCOPE COMPLETE BALANCE N JUL'21 AUG'21
FACILITY
D %

WEEK 3 WEEK 4 WEEK 5 WEEK 1

WORKSHOP % 100% 60% 40% 60% 20% 10% 10%

STORE % 100% 100% - 100%

ICO OFFICE % 100% 98% 2% 98% 1.0% 1.0%

SAG OFFICE % 100% 65% 35% 65% 15% 15% 5%

SAG
% 100% 46% 54% 46% 25% 10% 9%
ACCOMODATION
CAMP FACILITY BASE
INTERNAL ROAD PK49.75
CAMP 1
WORKS-LATERITE M 1612 1,550 62 96% 62
BOULDER

INTERNAL ROAD
M 1612 1,200 412 74% 412
WORKS-GNT
AFCONS
ACCOMODATION
NOS 42 32 10 76% 5 5
CONTAINERS
SHIFTING

260TPH HOT MIX


% 100% 100% 0% 100%
PLANT

MAKORA CRUSHER CRUSHER PLANT


MAKORA % 100% 90% 10% 90% 10%
AREA ACTIVITIES

 NAVIGATOR
Page 32 of 84

MISE À JOUR
HEBDOMADAIRE SOUTIEN NÉCESSAIRE 
SOUTIEN NÉCESSAIRE:

 Accélération des paiements en euros pour les 2e et 3e étapes de


paiementExpédition des paiements en euros pour les 2e et 3e étapes de paiement.
 Appui à l'organisation de l'extension de l'autorisation d'exploitation minière à M/s.
CG2I, propriétaire légal de la carrière à ce jour, conformément aux articles 105, 106
et 32 du Code minier du Gabon.
 Demande d'autorisation de dessin partiel pour commencer les travaux physiques sur
le site.
 Intervention pour accélérer la procédure de VISA pour les expatriés
 Facilitation de l'exemption de redevance pour les projets de terre, de latérite et de
sable d'importance nationale, conformément aux règles fiscales du Gabon et à la
préséance des projets antérieurs exécutés au Gabon. KEY HIGHLIGHTS

 Accélérer la remise des terrains pour les opérations de construction sur le site.
 Une instruction de modification concernant les dessins approuvés par le ministère
est attendue.

 NAVIGATOR
Page 33 of 84

MISE À JOUR
HEBDOMADAIRE LES PHOTOS 

La coupe de l'asphalte est en cours GNT Travaux en cours à PK Les travaux de terrassement sont en Bande transporteuse érigée dans une
au PK 59 RHS 60+950 LHS cours au PK 57 usine de concassage .

Échantillonnage du sol de la plate- Inspection des machines par Centrale d'enrobage à chaud Travaux de GNT Les travaux sont en cours à PK.
forme existante au PK 40 LHS l'équipe HSE à PK 50 commission achevés à PK.50 54+250 LHS

 NAVIGATOR
Page 34 of 84
Page 35 of 84
Page 36 of 84
Page 37 of 84
Page 38 of 84
Page 39 of 84
Page 40 of 84
Page 41 of 84
Page 42 of 84
Page 43 of 84
Page 44 of 84
Page 45 of 84
Page 46 of 84
Page 47 of 84
Page 48 of 84
Page 49 of 84
Page 50 of 84
Page 51 of 84
Page 52 of 84
Page 53 of 84
Page 54 of 84
Page 55 of 84
Page 56 of 84
Page 57 of 84
Page 58 of 84
Page 59 of 84
Page 60 of 84
Page 61 of 84
Page 62 of 84
Page 63 of 84
Page 64 of 84
Page 65 of 84
Page 66 of 84
Page 67 of 84
Page 68 of 84
Page 69 of 84
Page 70 of 84
Page 71 of 84
Page 72 of 84
Page 73 of 84
Page 74 of 84
Page 75 of 84
Page 76 of 84
Page 77 of 84
Page 78 of 84
Page 79 of 84
Page 80 of 84
Page 81 of 84

AFCONS INFRASTRUCTURE LTD

Rehabilitation & Upgradation of 2 Lane National Road RN-1


from PK-24 to PK-105 on EPC Basis in Gabon

Action taken : PEP talk conducted.


Page 82 of 84
Page 83 of 84
Page 84 of 84