Weekly Progress Report No 19 Revised
Weekly Progress Report No 19 Revised
JUNE 2021
TOTAL SAFE MANHOURS WEATHER STASTICS
128 OF
547 ACHIEVED ON PROJECT
05
DAYS DURATION
245,190 NO RAINF ALL IN THIS WEEK
NAVIGATOR
WEEKLY UPDATE PROJECT STATUS
START
Monday SURVEY WORKS GEO TECHNICAL MOBILISATION FINISH
Monday
22 100 % 100 % 40 % 22
COMPLETION FOR
NTP FOR SEGMENT 4
PROJECT NTP FOR NTP FOR
CONSTRUCTION 22 FEB 2022
COMMENCEMENT CONSTRUCTION CONSTRUCTION
FOR SEGMENT 4 FOR SEGMENT 5 &6 FOR SEGMENT 1 &3
DATE- 22 JAN OVERALL PROJECT
22 MAR 2021 22 JUN 2021 22 SEP 2021
2021 COMPLETION DATE-
22 JUL 2022
NTP FOR
NTP FOR
DETAILED
DETAILED
DESIGN FOR
DESIGN FOR
SEGMENT 4,5 & 6
SEGMENT 1, 2 & 3
- 22 JAN 2021
22 APR 2021
2021 2022
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18
NAVIGATOR
WEEKLY UPDATE KEY HIGHLIGHTS OF THIS WEEK
KEY HIGHLIGHTS :
NAVIGATOR
MATERIAL, MACHINERY, MANPOWER MOBILISATION
WEEKLY UPDATE
STATUS AND SCHEDULE
Total (Upto Previous
To Be mobilised
Sl. No. Manpower Week)
for 2 Weeks
Expats + National
1 Environment Engineer 2
2 Health & Safety Engineer 5
3 Male Nurse 1
4 Doctor 2
5 QA/QC Engineer 4
6 Survey 4
7 Execution Team 31 20
8 Skilled/Unskilled Workforce 258 150
Total 311 170
NAVIGATOR
WEEKLY UPDATE LOOK AHEAD PLAN- 4 WEEKS
LOOK AHEAD PLAN
NAVIGATOR
WEEKLY UPDATE LOOK AHEAD PLAN- 4 WEEKS
LOOK AHEAD PLAN
NAVIGATOR
WEEKLY UPDATE LOOK AHEAD PLAN- 4 WEEKS
LOOK AHEAD PLAN
NAVIGATOR
WEEKLY UPDATE SUPPORT REQUIRED
SUPPORT REQUIRED:
NAVIGATOR
WEEKLY UPDATE SITE PHOTOS
Field Density Checking Plantation on Environment Day HMP Main Structure RCC
Crusher Foundation
Training Programme for Children Embankment Preparation Plate Load Test on GNT Trial
TBM Inspection with Client Bitumen Tanker Erection HMP Foundation concreting
NAVIGATOR