Test Guide Distance Nari Pcs-902
Test Guide Distance Nari Pcs-902
Document status : TO :
F.C ( Comments )
F.E ( Execution )
F.A X ( Application )
Contract :
BORGOS SUBSTATION AND INTERCONNECTION WORK PROJECT
BURGOS
Contract specific number Name
by
on
by
on
by
on
A by Satria Pasti Malau BORIS
on 17-Jul-14 7/17/2014 17-Jul-14 14
Ind Rev Prepared Checked Approved Modification Sheets
J K T A T I 0 8 H D A F 0 0 0 0
Place of issue File number
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID Ref.
FA - Section CURRENT LINE DIFFERENTIAL RELAY Chapt.
NARI PCS-902 Sheet : 2
A T : P/87L Rev. A
1 PURPOSE OF TESTS 3 A
2 TEST EQUIPMENT REQUIRED 3 A
3 PRELIMINARY CHECK 3 A
4 SETTING CHECK 6 A
5 TESTING PROCEDURE 6 A
5.1. CURRENT MEASUREMENT TESTING 6 A
5.2. DIFFERENTIAL ELEMENT TESTING 6 A
5.3. TIMING TESTING 6 A
6 FINAL CHECK 7 A
7 ATTACHMENT
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID Ref.
FA - Section CURRENT LINE DIFFERENTIAL RELAY Chapt.
NARI PCS-902 Sheet : 3
A T : P/87L Rev. A
1 - PURPOSE OF TESTS
The test is intended to check correct relay operation in accordance to manufacturer publication or
technical guide publication PCS-902D_Instruction Manual_EN_General_X_R1.01
- Time meter
- Digital multimeter
- Phase angle meter
- Secondary injection capable for simulation fault (ex, OMICRON CMC 256/356)
- A multi finger test plug type MML B01 for use with test block type MMLG (optional)
- A portable computer with apporiate software
3 - PRELIMINARY CHECKS
3.2 Wiring
- Check if the external wiring corresponds to the apporiate relay diagram or assembly diagram
- When the relay is withdraw from its case,use continiuty tester to check if
the current short circuit (phase and earth CT's) between the terminal indicated on
the wiring diagram are closed.
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID Ref.
FA - Section CURRENT LINE DIFFERENTIAL RELAY Chapt.
NARI PCS-902 Sheet : 4
A T : P/87L Rev. A
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID Ref.
FA - Section CURRENT LINE DIFFERENTIAL RELAY Chapt.
NARI PCS-902 Sheet : 5
A T : P/87L Rev. A
Ensure that the communications baud rate and parity settings in the application software are
set the same as those on the protocol converter (usually a KITZ but could be a SCADA
RTU). The relays courier address in cell [0E02: COMMUNICATIONS, Remote Access] must
be set to a value between 1 and 254.
Check that communications can be established with this relay using the portable PC.
Ethernet Port
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID Ref.
FA - Section CURRENT LINE DIFFERENTIAL RELAY Chapt.
NARI PCS-902 Sheet : 6
A T : P/87L Rev. A
4. SETTING CHECKS
The setting checks ensure that all of the application-specific relay settings (i.e. both the
relay’s function and programmable scheme logic settings), for the particular installation, have
been correctly applied to the relay.
Note: The trip circuit should remain isolated during these checks to prevent
accidental operation of the associated circuit breaker.
Apply the protection setting based on Approved Calculation Note and the PSL logic scheme
applied based on Approved Schematic Diagram.
5. TESTING PROCEDURE
5.1. Current Measurement Check
- Input the protection setting (CT ratio, VT ratio, Idiff>, etc.) based on approved calculation note.
- Setting PSL (Programmable Scheme Logic) based on approved schematic drawing
- Inject secondary current per phase to secondary current terminal at protection panel (Please see
Schematic drawing to locate the current terminal position)
- Adjust the injected current so the measurement display meets the expected value; Record Data
- Calculate the percent error; Record Data
`
(Iinject x Iprimer) - Iexpected value
%Error = X100%
Iexpected value
%Error = x 100%
Iexpected value
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID Ref.
FA - Section CURRENT LINE DIFFERENTIAL RELAY Chapt.
NARI PCS-902 Sheet : 6
A T : P/87L Rev. A
This document is the property of Alstom Grid - SBU ITS and cannot be used, reproduced or transmitted to thirds without prior written permission.
PT. ALSTOM GRID Ref.
FA - Section CURRENT LINE DIFFERENTIAL RELAY Chapt.
NARI PCS-902 Sheet : 7
A T : P/87L Rev. A
6. FINAL CHECKS
The tests are now complete.
Remove all test or temporary shorting leads, etc. If it has been necessary to
disconnect any of the external wiring from the relay in order to perform the wiring
verification tests, it should be ensured that all connections (wiring, fuses and links)
are replaced in accordance with the relevant external connection or scheme diagram.
Ensure that the relay has been restored to service by checking that cell
[0F0D: COMMISSION TESTS, Test Mode] is set to ‘Disabled’.
If the relay is in a new installation or the circuit breaker has just been maintained, the circuit
breaker maintenance and current counters should be zero. These counters can be reset
using cell [0609: CB CONDITION, Reset All Values]. If the required access level is not
active, the relay will prompt for a password to be entered so that the setting change can be
made.
If the menu language has been changed to allow accurate testing it should be restored to the
customer’s preferred language.
If a P991/MMLG test block is installed, remove the P992/MMLB test plug and replace the
cover so that the protection is put into service.
Ensure that all event records, fault records, disturbance records, alarms and LEDs have
been reset before leaving the relay.
If applicable, replace the secondary front cover on the relay.