Sub: Offer For The Construction of Residence Building
Sub: Offer For The Construction of Residence Building
2015
With reference to the discussion we had we are pleased to submit our offer as below
Specification :
The following specifications are considered for the work based on the preliminary plan
Doors :
Teak wood frame (5"x3") and teak wood shutters with fitted
with brass hinges, aldrop, tower bolt and godrej
main door cost Rs.15,000/- lock Rs 2000/-
( Door Size 3'3"x7'.0")
b. Bedroom Doors :
Country wood frame (4"x21/2") and hard core Skin Molded shutters & Cylinder Lock
( Bedroom Door Size 3'0"x7'0")
bedroom door cost Rs. 3500/-
d. Windows :
Padauk wood frame (4"x21/2") and single shutters (3"x1.5") square bar grills, pin
headed 4mm thick glass and enamel painting, Stainless Steel fixtures will be provided.
As per drawing
(or)
UPVC windows of good brand - half white color
Flooring :
Plumbing :
Pipes for all waterlines (15kg/cm2), PVC pheolex pipes for sewage lines and
Rain water pipes ( 6kg/cm2)
All bath room closets and wash basins in white colour. ( Parryware make )
All bath / toilet CP fittings are metro ( or ) Jaquar Florentine Model
Floor EWC Closet for attached bathroom & IWC for common toilet.
basic rate: closet Rs.3500/-
wash basin : Rs. 2000/-
Loft in Kitchen and bedrooms for 2'0" wide and open shelves will be provided below-
size:10'x1'9".
lofts with polished cuddapah stone slab.size: 3'6"x7'
Kitchen Platform :
Kitchen platform will be provided with black granite slab and SS sink as per drawing.
basic rate: granite Rs. 110/-
ss.sink 2'6"x1'6" Rs.2000/-
Painting :
Electrical :
3 Phase connection, 40 amps distribution board with required rotary switches, Litaski
/ Anchor make modular switches, ISI Cables, Concealed wiring, Telephone
and TV points will be provided at Main hall and Master Bed.
Staircase Handrail : Stainless Handrail
Dining 2 1 1
M.Bed
2 1 2 1
Bed 2 1 3 1 1 1
Common 1
Toilet 1 1
Attached 1
Toilet 1 1
1
Kitchen 3 3 2 1
Stair
Case 2
External
Area 4
Balcony 1
Service 2 1
Area
Building in Plot no: 10
Builing Area : Rs.1700/- per sq.ft
Terms of Payment
% of
S. No. Terms of Payment Total Cost Amount
1. Advance 10%
2. Basement 15%
7. Joinery 10%
8. Plastering 10%
9. Flooring 5%
Note :
Note : Changes in the Rates if more or less by 5% of Cement, Steel & Bricks shall be
Compensated Mutually.
WITNESS: WITNESS: