S.no. Description/ Items No. of Items Length Width Height

The document provides a list of items for a construction project with their quantities and dimensions. It includes items for excavation, sand filling, PCC, footing concrete, shuttering, columns, backfilling, ground beams, brickwork and waterproofing. The quantities are provided for 20 pedestals in footing 1 and 39 pedestals in footing 2 along with individual measurements for 21 ground beams.

Uploaded by

IMTIAZ UDDIN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views

S.no. Description/ Items No. of Items Length Width Height

The document provides a list of items for a construction project with their quantities and dimensions. It includes items for excavation, sand filling, PCC, footing concrete, shuttering, columns, backfilling, ground beams, brickwork and waterproofing. The quantities are provided for 20 pedestals in footing 1 and 39 pedestals in footing 2 along with individual measurements for 21 ground beams.

Uploaded by

IMTIAZ UDDIN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 11

S.no. Description/ items No.

of items Length Width Height


1 Site Cleaning 1 40.66 15.925

2 Excavation
F1 20 2.2 2.2 2.2
F2 39 2 2 2.2
Total qty. of excavation
3 Sand Filling
F1 20 2.2 2.2 0.1
F2 39 2 2 0.1
Total qty. of Sand Filling

4 P.C.C
F1 20 2.2 2.2 0.1
F2 39 2 2 0.1
Total qty. of P.C.C

5 Footing Concrete
F1
Rec 20 1.6 1.6 0.25
Trapezoidal 20 0.45 0.6 0.1
F2
Rec 39 1.4 1.4 0.2
Trapezoidal 39 0.45 0.6 0.1
Total qty. of Footing Concrete
6 Footing Shuttering
F1 20 6.4 0.25
F2 39 5.6 0.2
Total qty. of Footing Shuttering
7 Pedestal Column
F1C1 20 0.25 0.4 1.65
F2C1 28 0.25 0.4 1.7
F2C2 11 0.25 0.4 1.7
Total qty. of Pesdestal column

8 Pedestal column shuttering


F1C1 20 1.3 1.65
F2C1 28 1.3 1.7
F2C2 11 1.3 1.7
Total qty. of Pesdestal column shuttering
9 Backfilling Total qty. of Backfilling
10 One line for Ground Beam
GB1 4 2.875 0.25 0.1
GB2 12 2.625 0.25 0.1
GB3 8 3.175 0.25 0.1
GB4 4 3.025 0.25 0.1
GB5 4 1.025 0.25 0.1
GB6 4 2.575 0.25 0.1
GB7 14 1.975 0.25 0.1
GB8 8 3.025 0.25 0.1
GB9 8 3.925 0.25 0.1
GB10 5 4.075 0.25 0.1
GB11 2 2.625 0.25 0.1
GB12 4 3.005 0.25 0.1
GB13 6 2.2 0.25 0.1
GB14 4 2.8 0.25 0.1
GB15 4 2.145 0.25 0.1
GB16 2 2.5 0.25 0.1
GB17 2 2.4 0.25 0.1
GB18 4 2.05 0.25 0.1
GB19 2 2.11 0.25 0.1
GB20 4 3.3 0.25 0.1
GB21 2 3.38 0.25 0.1
Total Qty. Of One line B.W
11 Ground Beam Concrete
GB1 4 2.875 0.25 0.3
GB2 12 2.625 0.25 0.3
GB3 8 3.175 0.25 0.3
GB4 4 3.025 0.25 0.3
GB5 4 1.025 0.25 0.3
GB6 4 2.575 0.25 0.3
GB7 14 1.975 0.25 0.3
GB8 8 3.025 0.25 0.3
GB9 8 3.925 0.25 0.3
GB10 5 4.075 0.25 0.3
GB11 2 2.625 0.25 0.3
GB12 4 3.005 0.25 0.3
GB13 6 2.2 0.25 0.3
GB14 4 2.8 0.25 0.3
GB15 4 2.145 0.25 0.3
GB16 2 2.5 0.25 0.3
GB17 2 2.4 0.25 0.3
GB18 4 2.05 0.25 0.3
GB19 2 2.11 0.25 0.3
GB20 4 3.3 0.25 0.3
GB21 2 3.38 0.25 0.3
Total Qty. Of Ground Beam Concrete
12 Ground Beam Shuttering
GB1 4 5.75 0.3
GB2 12 5.25 0.3
GB3 8 6.35 0.3
GB4 4 6.05 0.3
GB5 4 2.05 0.3
GB6 4 5.15 0.3
GB7 14 3.95 0.3
GB8 8 6.05 0.3
GB9 8 7.85 0.3
GB10 5 8.15 0.3
GB11 2 5.25 0.3
GB12 4 6.01 0.3
GB13 6 4.4 0.3
GB14 4 5.6 0.3
GB15 4 4.29 0.3
GB16 2 5 0.3
GB17 2 4.8 0.3
GB18 4 4.1 0.3
GB19 2 4.22 0.3
GB20 4 6.6 0.3
GB21 2 6.76 0.3
Total Qty. of Ground Beam Shuttering
Brick work up to D.P.C
13 Bottom
GB1 4 2.875 0.25 0.45
GB2 12 2.625 0.25 0.45
GB3 8 3.175 0.25 0.45
GB4 4 3.025 0.25 0.45
GB5 4 1.025 0.25 0.45
GB6 4 2.575 0.25 0.45
GB7 14 1.975 0.25 0.45
GB8 8 3.025 0.25 0.45
GB9 8 3.925 0.25 0.45
GB10 5 4.075 0.25 0.45
GB11 2 2.625 0.25 0.45
GB12 4 3.005 0.25 0.45
GB13 6 2.2 0.25 0.45
GB14 4 2.8 0.25 0.45
GB15 4 2.145 0.25 0.45
GB16 2 2.5 0.25 0.45
GB17 2 2.4 0.25 0.45
GB18 4 2.05 0.25 0.45
GB19 2 2.11 0.25 0.45
GB20 4 3.3 0.25 0.45
GB21 2 3.38 0.25 0.45
Total Qty. of Brick work up to D.P.C. Bottom
14 Damp Proof course
GB1 4 2.875 0.25
GB2 12 2.625 0.25
GB3 8 3.175 0.25
GB4 4 3.025 0.25
GB5 4 1.025 0.25
GB6 4 2.575 0.25
GB7 14 1.975 0.25
GB8 8 3.025 0.25
GB9 8 3.925 0.25
GB10 5 4.075 0.25
GB11 2 2.625 0.25
GB12 4 3.005 0.25
GB13 6 2.2 0.25
GB14 4 2.8 0.25
GB15 4 2.145 0.25
GB16 2 2.5 0.25
GB17 2 2.4 0.25
GB18 4 2.05 0.25
GB19 2 2.11 0.25
GB20 4 3.3 0.25
GB21 2 3.38 0.25
Total Qty. of Damp Proof Course
15 Bitumin Coat
GB1 4 2.875 0.25
GB2 12 2.625 0.25
GB3 8 3.175 0.25
GB4 4 3.025 0.25
GB5 4 1.025 0.25
GB6 4 2.575 0.25
GB7 14 1.975 0.25
GB8 8 3.025 0.25
GB9 8 3.925 0.25
GB10 5 4.075 0.25
GB11 2 2.625 0.25
GB12 4 3.005 0.25
GB13 6 2.2 0.25
GB14 4 2.8 0.25
GB15 4 2.145 0.25
GB16 2 2.5 0.25
GB17 2 2.4 0.25
GB18 4 2.05 0.25
GB19 2 2.11 0.25
GB20 4 3.3 0.25
GB21 2 3.38 0.25
Total Qty. of Damp Proof Course
Total Units
647.5105 sqm

212.96 CUM
343.2 CUM
556.16 CUM

9.68 CUM
15.6 CUM
25.28 CUM

9.68 cum
15.6 cum
25.28 cum

12.8 cum
2.4409229251 cum

15.288 cum
3.8446997409 cum
34.373622666 cum

32 sqm
43.68 sqm
75.68 sqm

3.3 CUM P.c ht= total excavated qt


4.76 CUM F1 1.65
1.87 CUM F2 1.7
9.93 CUM

42.9 sqm
61.88 sqm
24.31 sqm
129.09 sqm
461.29637733 Cum

0.288 beam no Clear span


0.788 GB1 4 2.875
0.635 GB2 12 2.625
0.303 GB3 8 3.175
0.103 GB4 4 3.025
0.258 GB5 4 1.025
0.691 GB6 4 2.575
0.605 GB7 14 1.975
0.785 GB8 8 3.025
0.509 GB9 8 3.925
0.131 GB10 5 4.075
0.301 GB11 2 2.625
0.330 GB12 4 3.005
0.280 GB13 6 2.2
0.215 GB14 4 2.8
0.125 GB15 4 2.145
0.120 GB16 2 2.5
0.205 GB17 2 2.4
0.106 GB18 4 2.05
0.330 GB19 2 2.11
0.169 GB20 4 3.3
7.274 Cum GB21 2 3.38

0.863
2.363
1.905
0.908
0.308
0.773
2.074
1.815
2.355
1.528
0.394
0.902
0.990
0.840
0.644
0.375
0.360
0.615
0.317
0.990
0.507
21.822 Cum

6.90
18.90
15.24
7.26
2.46
6.18
16.59
14.52
18.84
12.23
3.15
7.21
7.92
6.72
5.15
3.00
2.88
4.92
2.53
7.92
4.06
174.57 Sqm

5.18
14.18
11.43
5.45
1.85
4.64
12.44
10.89
14.13
9.17
2.36
5.41
5.94
5.04
3.86
2.25
2.16
3.69
1.90
5.94
3.04
130.93 Cum

2.88
7.88
6.35
3.03
1.03
2.58
6.91
6.05
7.85
5.09
1.31
3.01
3.30
2.80
2.15
1.25
1.20
2.05
1.06
3.30
1.69
72.74 Sqm

2.88
7.88
6.35
3.03
1.03
2.58
6.91
6.05
7.85
5.09
1.31
3.01
3.30
2.80
2.15
1.25
1.20
2.05
1.06
3.30
1.69
72.74 Sqm
t= total excavated qty.- s.f. ht.- p.c.c ht- footing concrete ht.