0% found this document useful (0 votes)
64 views

Quality Control Report

This quality control report summarizes the surface preparation, coating application, and inspection of a coating project. It documents the tank size and number, abrasive media used, surface profile measurements, coating products and application details, dry film thickness measurements, holiday inspection results, and post-cure schedule. The applicator signed off on completing the project.

Uploaded by

Rahul TR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

Quality Control Report

This quality control report summarizes the surface preparation, coating application, and inspection of a coating project. It documents the tank size and number, abrasive media used, surface profile measurements, coating products and application details, dry film thickness measurements, holiday inspection results, and post-cure schedule. The applicator signed off on completing the project.

Uploaded by

Rahul TR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

QUALITY CONTROL

REPORT
Hall’s Work Order No. _____________________

Date: Client:
Location: Client P.O. No.
Tank Size: Tank No.

SURFACE PREPARATION
Pre-Cleaning: Blast Specification:
Abrasive Media: Surface Profile Req’d:
Nozzle Size: Nozzle Pressure:
Air Dryer etc.: Compressor Size:
Surface Temp: Air Temp: R.H.: Dew Pt.:

TESTEX TAPE
Surface Profile Surface Profile
Test #1: Test #2:

COATING APPLICATION
Supplier: Product:
Specified DFT: # of Coats:
Base Batch #: Colour:
Catalyst Batch #: Thinner:
Thinner Batch #: % Thinner Used:
Applied With: Tip Size:

st Surface Air Dew


1 Coat Application Date: Time:
Temp. Temp.
R.H.:
Pt.
st DFT DFT DFT
1 Coat Inspection Instrument Used: Min.: Max: Average:
nd Surface Air Dew
2 Coat Application Date: Time:
Temp. Temp.
R.H.:
Pt.
nd DFT DFT DFT
2 Coat Inspection Instrument Used: Min.: Max: Average:
rd Surface Air Dew
3 Coat Application Date: Time:
Temp. Temp.
R.H.:
Pt.
rd DFT DFT DFT
3 Coat Inspection Instrument Used: Min.: Max: Average:

FINAL INSPECTION
Holiday Inspected: Date: Time:
Inspection Instrument: Wet Sponge: Dry Spark:
No. of Discontinuities: Location:

Method of Repair: Repairs Inspected: Yes No

POST CURE SCHEDULE


Post Cure Required: Heat Type Used:
Cure Temp.: Cure Duration:

Project Complete: Comments:

Applicators Signature: Date: