ESMP For Crusher Site at KM 87+735.62 RHS PDF
ESMP For Crusher Site at KM 87+735.62 RHS PDF
February, 2020
Crusher site ESMP
Contents
Executive Summary....................................................................................................................................... 3
1. Introduction .............................................................................................................................................. 4
2. Objectives of Preparing the ESMP ............................................................................................................ 4
3. Methodology ............................................................................................................................................. 5
4. Estimated Quantity for Crusher Site ......................................................................................................... 5
5. Utilization Plan for Crusher Site ................................................................................................................ 5
6. Environmental and Social Management Plan for Crusher Site at KM 87+735.62 .................................... 6
Annex: Site Layout ........................................................................................................................................ 8
Muketuri Alem Ketema Road Project Lot 2 Kokeb Mesk- Alem Ketema Road project-48.9km
2
Crusher site ESMP
Executive Summary
The Muketuri – Alem Ketema road upgrading project that covers 105.5km connects Oromia
regional State (muketuri) with Amhara regional state (Alem Ketema).The project road is
divided into two lots, and this document is the Environmental and Social Management Plan
(ESMP) for Crusher Site at KM 87+735.62 RHS for Lot II: Kokeb Mesk–Alem Ketema Road
Upgrading Project section that covers Approximately 48.9 km.
This ESMP document consists of general project background information, objective of the
ESMP for Crusher site, summary of key environmental laws & regulations, objectives of
preparing ESMP document for Crusher site, project description, and potential impacts
associated with Crusher Site activities and proposed mitigation methods for each impact,
detailed Site specific ESMP for Crusher Site.
The major potential environmental & social impacts of the Crusher Site activities in the
corridor include; soil erosion, soil contamination, spoil disposal problems, air pollution from
point and non–point sources, competition for resources such as water & sand, impact on
farm lands, spread of communicable diseases, and loss of business and utilities, etc.
The Project Road is committed to implement dust control methods, such as restricting
traffic speeds, dust suppression by showering on dusty sections & installing water sprinkles
on crusher plants, feeding wet rock into crusher jaws, installing crusher and asphalt plants
taking wind direction into consideration, regular maintenance of emission intensive plants
like stone crusher & bitumen mixer, implementing well-organized traffic management plan,
and strategically collecting chemical pollutants such as used engine oil, fuel & waste water.
The following mitigation measures will be implemented to overcome the potential impacts
on important trees and vegetation adopting reduced ROW, restricting earthwork &
earthmoving activities to the area necessary for the road works only, applying ‘half-width’
construction method for sections having important indigenous or exotic trees or vegetation
that would be affected if detour road were constructed, and avoiding side-casting of
excavation materials on down-slope where it may affect trees/ vegetation, and replanting
appropriate tree species at areas affected due to temporary activities to compensate for
trees/vegetation lost.
Muketuri Alem Ketema Road Project Lot 2 Kokeb Mesk- Alem Ketema Road project-48.9km
3
Crusher site ESMP
1. Introduction
The muketuri - Alem ketema Road Upgrading Project starts at kokeb mesk and terminates at
Alem Ketema town after traversing for approximately 55 km. It is the second lot of the
Muketuri – Alem Ketema road Upgrading Project that connects two regional states. Oromia
National Regional State (ONRS) and Semien Shoa of Amhara National Region State (ANRS).
The currently gravel-surfaced with variable width between 5.5 m to 9 m. and the total length
of the Road Project is 48.9 km.
Muketuri Alem Ketema Road Project Lot 2 Kokeb Mesk- Alem Ketema Road project-48.9km
4
Crusher site ESMP
3. Methodology
The methodologies involved in the collection of the relevant data include consultation (with
Woreda and Kebele Officials, local experts, crusher site activity affected persons, site visual
observation, transect walk, and checklists. Simplified model of impact aggregation and
evaluation method was used for the analysis of impacts.
Muketuri Alem Ketema Road Project Lot 2 Kokeb Mesk- Alem Ketema Road project-48.9km
5
Crusher site ESMP
Muketuri Alem Ketema Road Project Lot 2 Kokeb Mesk- Alem Ketema Road project-48.9km
6
Crusher site ESMP
Muketuri Alem Ketema Road Project Lot 2 Kokeb Mesk- Alem Ketema Road project-48.9km
7
Crusher site ESMP
Muketuri Alem Ketema Road Project Lot 2 Kokeb Mesk- Alem Ketema Road project-48.9km
8