0% found this document useful (0 votes)
96 views

Reduction of Delay at Pre-Production

The document summarizes a graduation project by Arpit Raj and Rishika Mallick at IMARA Universal Sportsbiz Pvt. Ltd. to reduce delays at the pre-production stage. The project involved analyzing IMARA's merchandising, sourcing, and pre-production processes over 14 weeks. Objectives included identifying reasons for delays and proposing effective solutions. The team conducted surveys and data analysis to find issues like improper tracking, follow-ups, and prioritization. They recommended developing a client application using visual basic and MS Access to replace the old Excel system, facilitating easier monitoring and communication to reduce lead times across the supply chain.

Uploaded by

ARYAN RATHORE
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views

Reduction of Delay at Pre-Production

The document summarizes a graduation project by Arpit Raj and Rishika Mallick at IMARA Universal Sportsbiz Pvt. Ltd. to reduce delays at the pre-production stage. The project involved analyzing IMARA's merchandising, sourcing, and pre-production processes over 14 weeks. Objectives included identifying reasons for delays and proposing effective solutions. The team conducted surveys and data analysis to find issues like improper tracking, follow-ups, and prioritization. They recommended developing a client application using visual basic and MS Access to replace the old Excel system, facilitating easier monitoring and communication to reduce lead times across the supply chain.

Uploaded by

ARYAN RATHORE
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Graduation Project

Arpit Raj
Rishika Mallick
Batch : 2016-2020
• Topic : Reduction of delay at Pre-production

Project • Organisation : IMARA, Universal Sportsbiz Pvt. Ltd.

Brief • Duration : 14 weeks


Secondary
i

Find out their reasons and


propose an effective feasible
solution for the same.

ii

Objectives
To analyze merchandising,
sourcing & pre-production
process at IMARA.

iii

Primary Understanding the work culture of


different departments, occurrence
Reduction of delay at of delays and their magnitude.
Pre-production stage.
.
Problem
Identification

Developing
Research Plan

Methodology Information
Collection
Information
Analysis

Conclusion
Data Collection

Literature Review from research Designing Survey


paper related to this field.

Questionnaire based Past records survey (TNA calendars)


employee survey

Research Plan
Decisions on data sources, choice of research design,
research approaches, research instruments, sampling
plan and contact methods.

Data Analysis
Tool used- Graphs (Bar Chart), Hypothesis testing, Chi-
square test.

Results, discussions and strategy


formulation.

Conclusion
Problem Areas
The MS-Excel sheet was not used for any analysis or
decision making.

Improper follow-ups & lack of update

Improper prioritisation of styles

Internal and external information transmission lapse


Limitations
ii iv of IMARA’s
No proper Fit-sample Improper color distribution TNA Sheet
submission date.

i iii v

No actual vendor No Update On-time. Difficulties in reading for


delivery date. another merchandiser/person.

Unorganised excel sheets, not necessarily filled Sourcing


on-time and acted upon, ineffective tracking and Department
communication leading to delays.
Recommendation
&
Suggestion
PROBLEM SOLUTION
,0 ,0

INFORMATION TRANSMISSION
BREACH APPLICAION PORTAL
&
IMPROPER FOLLOW-UPS

• OLD EXCEL SHEET • CLIENT APPLICATION USING VISUAL BASIC


• IMPROPER FOLLOW-UPS • MS ACCESS FOR DATABASE
• UNORGANISED TABLES • ALL GARMENT/VERNDOR DETAILS
• LACK OF UPDATE • INCLUDES TNA CALENDAR
• DIFFICULTY TO TRACKING • EASY TO TRACK STYLES
Facilitate easy Scope of improvement
monitoring in lead time
Features
&
Benefits
(New System)
Providing Visibility
from allocation to delivery Provide clear priorities

Actual v/s Planned


Reflects current performance (Cross –Checking)
including any slippage
Conclusion
The comparison between the two system can be understood best based on the four categories:

TIME - The proposed system will take less time to add/update data. It will also help in
easy tracking of existing data. It will reduce delays and ultimately the lead time.

MONEY - The amount of money spent will be minimal when it comes to making of
the application, training the user, setting up and implementation.

MANPOWER - Manpower will remain constant but the manual work will be easier.

EFFICIENCY - The proposed system will be highly efficient than any normal excel based
tracking and it also acts as an effective communication platform
Internal survey helped in identification of on-time
delivery failure reasons and style preferences.

Tracking would result in improvement of


Communication and feedback with Vendors

Expected
TNA monitoring results in reduction of Benefits
lead-time of the entire supply chain.

Facilitate monitoring of existing relationship


with vendors by easy tracking of PO.
The problems in failure of lead The identification of further problem can be added
time can be further investigated. in the Application for further easier monitoring.

The formats and layout can be updated In-app notifications can be also added
and standardized further. if needed for real time updates.

Mail service via application


Application layout for Vendor
can also be added
can be also added.
Team

Rishika
Arpit Raj
Mallick

You might also like