• Topic : Reduction of delay at Pre-production
ii
Objectives
To analyze merchandising,
sourcing & pre-production
process at IMARA.
iii
Developing
Research Plan
Methodology Information
Collection
Information
Analysis
Conclusion
Data Collection
Research Plan
Decisions on data sources, choice of research design,
research approaches, research instruments, sampling
plan and contact methods.
Data Analysis
Tool used- Graphs (Bar Chart), Hypothesis testing, Chi-
square test.
Conclusion
Problem Areas
The MS-Excel sheet was not used for any analysis or
decision making.
i iii v
INFORMATION TRANSMISSION
BREACH APPLICAION PORTAL
&
IMPROPER FOLLOW-UPS
TIME - The proposed system will take less time to add/update data. It will also help in
easy tracking of existing data. It will reduce delays and ultimately the lead time.
MONEY - The amount of money spent will be minimal when it comes to making of
the application, training the user, setting up and implementation.
MANPOWER - Manpower will remain constant but the manual work will be easier.
EFFICIENCY - The proposed system will be highly efficient than any normal excel based
tracking and it also acts as an effective communication platform
Internal survey helped in identification of on-time
delivery failure reasons and style preferences.
Expected
TNA monitoring results in reduction of Benefits
lead-time of the entire supply chain.
The formats and layout can be updated In-app notifications can be also added
and standardized further. if needed for real time updates.