Brief Note On Jaipur Metro Rail Project: Phase Length (KMS) Cost (Rs. in Crore)
Brief Note On Jaipur Metro Rail Project: Phase Length (KMS) Cost (Rs. in Crore)
Jaipur Metro Rail Project has been planned keeping in view the
urban transport demands of the city for the next many decades.
Planned to provide an affordable and reliable system of public
transport, the project intends to spur economic development of
the city while preserving its rich heritage and culture. Thus,
Jaipur Metro Rail Project is a significant step in making Jaipur a
world class city.
The salient features of Phase I, with details of IA and IB, are shown
in the following table:
For effective execution of the project in its initial stages, the services
for construction as well as project consultancy were taken from
DMRC. The total work of Phase-I was divided into two parts; Phase-
IA and Phase-IB. Phase-IA from Mansarovar to Chandpole covering
a length of 9.718 km. (out of total 12.067 km.) was awarded to
DMRC on deposit terms including the technical and management
consultancy. Major part of Phase-IA has been completed and trial
runs are in progress. Phase-IB covering a length of 2.349 kms.
comprising underground stretch from Chandpole to Badi Chaupar
had also been taken up on EPC mode but will be implemented
directly by Jaipur Metro Rail Corporation (JMRC), with DMRC
playing the role of General Consultants (GC). The work on Phase-IA
is proposed to be completed by the end of August, 2014 and Phase-
IB is expected to be completed by March, 2018. The complete O&M
of Phase-IA is proposed to be taken up by JMRC on its own. Hand-
holding support is being taken fromDMRC in O&M of Phase- IA for
the initial period of one year.
Page 2 of 7
MoUD, GoI has conveyed the approval of the Government of India
for the implementation of Jaipur Metro Rail Project Phase-I, at a
completion cost of Rs. 3149 crore (including escalation cost of 5%
every year after 2011) by Jaipur Metro Rail Corporation Ltd. with
contribution of Government of India in the form of equity and
subordinate debt as per the details given as under:-
Page 4 of 7
also accrue to and is to be transferred to DMF with effect from
1st April, 2011.
Phase 1A
Phase 1B
Page 5 of 7
Though there is no ASI protected monuments in the vicinity of
the project, an Environmental Impact Assessment study has
been completed with the assistance of ADB, so as to ensure
that no damage is caused to any other physical cultural
resources, including the state-protected monument of Hawa
Mahal, that fall within 100metres of this underground phase.
1
1. With its Phase-IA getting completed in about 3 years
2
(February 2011 to August 2014), Jaipur Metro Rail Project
stands out as the fastest project implementation among all
Metro projects in the country and the rest of the democratic
world.
Page 6 of 7
care of any operational deficit or shortfall in repayment
obligations. 10% of the entire proceeds from all land auctions
of Jaipur Development Authority and Rajasthan Housing
Board will also be coming into the Dedicated Metro Fund in
recognition of the value addition to its land bank caused by
Jaipur Metro.
Page 7 of 7