Model Element List Required UOM Classification AUT
Model Element List Required UOM Classification AUT
Concept, Fea
Model Element List Required UOM Classification Plannin
AUT
Topography (Existing
Site and surrounding Y/N m2 14-34 11 01 ABC
land use)
Topography (Site
Y/N m2 14-34 11 02 ABC
Formation)
Natural Slope Y/N m2 14-34 11 99 03 ABC
Artificial Slope Y/N m2 14-34 11 99 03 ABC
Flexible Barrier Y/N m2 23-11 25 00 01 ABC
Rigid Barrier Y/N m2 23-11 25 00 02 ABC
Massing model of
adjacent areas or Y/N - 14-31 11 11 01 ABC
surrounding buildings
Geological model (soil,
Y/N m3 14-37 00 00 ABC
fill, rock)
Pavement
(Carriageway, Footpath, Y/N m2 23-11 21 00 ABC
Cycle Track)
G I V
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
300 500 A
Architectural Model
Building Massing
Y/N m2 14-31 11 11 02
Model
Room space, corridor,
plant & equipment Y/N m2 23-19 31 00
room
AUT G I V
DEF 300 500
Foundations (piles,
pile caps, tie/ground Y/N m3 23-13 29 00
beams & footings)
Diaphragm wall,
Y/N m3 23-11 17 13
retaining wall
Excavation & lateral
Y/N m3 23-11 11 00
stability system
Beam Y/N m3 23-13 35 11 13 13
Column, post, hangar Y/N m3 23-13 35 11 13 11 02
Wall Y/N m2 23-13 35 21
Slab, floor, ramp, roof Y/N m2 23-13 35 11 13
Transfer Structure
Y/N m2 23-13 35 19 01
(transfer plate, truss)
Temporary works,
temporary structures, Y/N Ton 23-23 25 00
platforms
Tunnel Structure
(Tunnel Box, Subway, Y/N m3 23-39 13 00
Utilities Tunnel)
Concept, Feasibility, Submission t
Preliminary, Scheme Detailed Design
Planning approval autho
AUT G I AUT G I AUT G I AUT
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
ABC 100 100 ABC 200 200 ABC 200 200 ABC
Submission to
Tender Construction As-Built
approval authority
G I AUT G I AUT G I AUT G
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
300 300 ABC 300 300 DEF 400 400 DEF 300
As-Built
I V
500
500 B
500
500
500
500
500
500
500
500
500
500
Bridges
I V
500
500 B
500
500
500
Marine Works
Concept, Feasibility,
Model Element List Required UOM Classification Planning
AUT
Seawall Y/N m3 23-39 21 15 13 ABC
Breakwater Y/N m3 23-39 21 15 15 ABC
Pier, Jetty Y/N m3 23-39 21 11 19 ABC
Concept, Feasibility, Submission to approval
Preliminary, Scheme Detailed Design
Planning authority
G I AUT G I AUT G I AUT G
100 100 ABC 200 200 ABC 200 200 ABC 300
100 100 ABC 200 200 ABC 200 200 ABC 300
100 100 ABC 200 200 ABC 200 200 ABC 300
ission to approval
Tender Construction As-Built
authority
I AUT G I AUT G I AUT G I
300 ABC 300 300 DEF 400 400 DEF 300 500
300 ABC 300 300 DEF 400 400 DEF 300 500
300 ABC 300 300 DEF 400 400 DEF 300 500
Built
B
LOD Responsibility Matrix
Concept, Feasibility,
Require Planning
Model Element List UOM Classification
d
AUT G I
Element 1 Y/N
Element 2 Y/N
Element 3 Y/N
Submission to approval
Preliminary, Scheme Detailed Design Tender
authority
AUT G I AUT G I AUT G I AUT
Tender Construction As-Built
G I AUT G I AUT G I V