Zakum Development Company (Zadco) : Description of Inspection SL. No. Fit-Up Inspection Date Weld Visual Inspection Date

This inspection report summarizes fit-up, dimensional, and weld visual inspections of pipe supports for the 7th Crude Oil Storage Tanks project in Zirku, Abu Dhabi. The inspections found the pipe supports of various types and numbers acceptable. The supports were released for painting and dispatch.

Uploaded by

Yousab Creator
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
85 views4 pages

Zakum Development Company (Zadco) : Description of Inspection SL. No. Fit-Up Inspection Date Weld Visual Inspection Date

This inspection report summarizes fit-up, dimensional, and weld visual inspections of pipe supports for the 7th Crude Oil Storage Tanks project in Zirku, Abu Dhabi. The inspections found the pipe supports of various types and numbers acceptable. The supports were released for painting and dispatch.

Uploaded by

Yousab Creator
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

ZAKUM DEVELOPMENT COMPANY

(ZADCO)

INSPECTION REPORT (Pipe Supports)


Site/Project Name: EPC WORKS FOR 7TH CRUDE OIL STORAGE TANKS AT ZIRKU,
Report No.: IRPS-4936-002
ABUDHABI
Customer Name: ZAKUM DEVELOPMENT COMPANY Belleli Project No.: 4936
Zadco Project No.: 8382 Tag No.: 443-S-007

Procedure no.: P8382-PB-443-Q-0033 Rev.B1


References: Drawings : A1-443-S-0036 Sht.no. 001~006 Rev.B1
lnspection & test Plan : P8382-PB-443-Q-0027 Rev.B1 / Stage : 4.1, 4.2 & 4.4

DESCRIPTION OF INSPECTION

SL. Fit-up Inspection Weld Visual


Pipe Support No. Structure Type WPS No. Welder No.
No. Date Inspection Date

1 PS-2260, PS-2300 Type-1C 4936-S2 055, 077, 089 31 Mar.2015 07 Apr.2015

PS-2460A, PS-2470A,
2 PS-2480A, PS-2490A, Type-2 4936-S2 019, 020, 077 19 Mar.2015 07 Apr.2015
PS-2500A

RESULT :
1) Above mentioned pipe supports fit-up, Dimensional & weld visual inspections carried out and found acceptable

REMARKS:
Above mentioned pipe supports released for painting / dispatch

ATTACHMENTS:
N/A

Parties Involved BELLELI ENERGY - QC TPI (BV) ZADCO

Signature

Name K.B.Patel / Sumith.V


Level of Qualification CWI
Date 08 Apr.2015
ZAKUM DEVELOPMENT
COMPANY
(ZADCO)

INSPECTION REPORT (Pipe Supports)


Site/Project Name: EPC WORKS FOR 7TH CRUDE OIL STORAGE TANKS AT ZIRKU,
Report No.: IRPS-4936-001
ABUDHABI

Customer Name: ZAKUM DEVELOPMENT COMPANY Belleli Project No.: 4936

Zadco Project No.: 8382 Tag No.: 443-S-007

Procedure no.: P8382-PB-443-Q-0033 Rev.B1


References: Drawings : A1-443-S-0036 Sht.no. 003 Rev.B2

lnspection & test Plan : P8382-PB-443-Q-0027 Rev.B1 / Stage : 4.1, 4.2 & 4.4

DESCRIPTION OF INSPECTION

SL. Weld Visual Inspection


Pipe Support No. Structure Type WPS No. Welder No. Fit-up Inspection Date
No. Date

RESULT :
1) Above mentioned pipe supports fit-up, Dimensional & weld visual inspections carried out and found acceptable

REMARKS:
Above mentioned pipe supports released for painting / dispatch

ATTACHMENTS:
N/A

Parties Involved BELLELI ENERGY - QC TPI (BV) ZADCO

Signature

Name
Level of Qualification CWI
ZAKUM DEVELOPMENT
COMPANY
(ZADCO)

INSPECTION REPORT (Pipe Supports)


Site/Project Name: EPC WORKS FOR 7TH CRUDE OIL STORAGE TANKS AT ZIRKU,
Report No.: IRPS-4936-001
ABUDHABI

Customer Name: ZAKUM DEVELOPMENT COMPANY Belleli Project No.: 4936

Zadco Project No.: 8382 Tag No.: 443-S-007

Procedure no.: P8382-PB-443-Q-0033 Rev.B1


References: Drawings : A1-443-S-0036 Sht.no. 003 Rev.B2

lnspection & test Plan : P8382-PB-443-Q-0027 Rev.B1 / Stage : 4.1, 4.2 & 4.4

DESCRIPTION OF INSPECTION
Date
ZAKUM DEVELOPMENT COMPANY
(ZADCO)

INSPECTION REPORT (Pipe Supports)


Site/Project Name: EPC WORKS FOR 7TH CRUDE OIL STORAGE TANKS AT ZIRKU, ABUDHABI Report No.: IRPS-4936-001
Customer Name: ZAKUM DEVELOPMENT COMPANY Site/Project No.: 4936
ZADCO PROJECT No. 8382 Tag No.: 443-S-007

Procedure no.: P8382-PB-443-Q-0033 Rev.B1


References: Drawings : A1-443-S-0036 Sht.no. 001~006 Rev.B1
lnspection & test Plan : P8382-PB-443-Q-0027 Rev.B1 / Stage : 4.1, 4.2 & 4.4

DESCRIPTION OF INSPECTION

SL.No Dwg No. Structure Type Pipe Support No. WPS No. Welder No.

A1-443-S-0036 Sht.001 / 005


1 Type-1B PS-2530 4936-S2 072, 078
Rev.B1
A1-443-S-0036 Sht.002 / 005
2 Type-1C PS-2260, PS-2300 4936-S2 055, 077, 089
Rev.B1
PS-2460A, PS-2470A, PS-
A1-443-S-0036 Sht.002 / 005
3 Type-2 2480A, PS-2490A, PS- 4936-S2 019, 020, 077
Rev.B1
2500A

PS-2300A, PS-2420, PS-


A1-443-S-0036 Sht.002 / 005
4 Type-2A 2430A, PS-2440A, PS- 4936-S2 059, 073
Rev.B1
2450A

A1-443-S-0036 Sht.002 / 005 PS-1 to PS-46,


5 Type-3 4936-S2 055, 059, 072, 073, 082
Rev.B1 PS-46A~C
A1-443-S-0036 Sht.002 / 005
6 Type-4 PS-2530B~D 4936-S2 055, 073
Rev.B1

RESULT :

1) Above mentioned pipe supports fit-up, Dimensional & weld visual inspection carried out and found acceptable

REMARKS:
Above mentioned pipe supports released for painting / dispatch

ATTACHMENTS:

N/A

Parties Involved BELLELI ENERGY - QC TPI (BV) ZADCO

Signature

Name K.B.Patel / Sumith.V


Level of Qualification CWI
Date 08 Apr.2015