Schedule of Rates Amravati-Nagpur Region YEAR 2018-2019: Material

1. The document provides a schedule of rates for materials, labor, machinery hire charges, and rate analysis for various construction activities for the Amravati-Nagpur region for the year 2018-2019. 2. It lists 55 different construction materials along with their unit of measurement, SOR (schedule of rates), and current market rates. 3. It also lists 39 types of labor along with their unit rates as per SOR and current market rates. 4. Hire charges for 16 types of machinery per day along with their SOR and market rates are provided. 5. Detailed rate analysis for excavation, reinforcement, shuttering, casting, masonry, plaster

Uploaded by

Sathish Kumar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
131 views

Schedule of Rates Amravati-Nagpur Region YEAR 2018-2019: Material

1. The document provides a schedule of rates for materials, labor, machinery hire charges, and rate analysis for various construction activities for the Amravati-Nagpur region for the year 2018-2019. 2. It lists 55 different construction materials along with their unit of measurement, SOR (schedule of rates), and current market rates. 3. It also lists 39 types of labor along with their unit rates as per SOR and current market rates. 4. Hire charges for 16 types of machinery per day along with their SOR and market rates are provided. 5. Detailed rate analysis for excavation, reinforcement, shuttering, casting, masonry, plaster

Uploaded by

Sathish Kumar
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

SCHEDULE OF RATES

AMRAVATI-NAGPUR REGION
YEAR 2018-2019
MATERIAL

SR. MATERIAL UNIT RATE RATE


NO. (SOR) (MARKET)
1 ALUM GRADE Kg 6.5 6.5
2 BINDING WIRE Kg 56 50
3 BLACK ENAMEL PAINT ANTI-CORROSIVE Ltr 157 100
4 BRICKS No 4.4 3.8
5 BULLIES, STRUTS mt 162 150
6 C.C. TEAK WOOD PLANK Cum 60377 56000
7 CEMENT Bag 210 270
8 CEMENT SULPHIUR RESISTANT M.T. 5205 5175
9 CHARCOAL Kg 21.5 18
10 COARSE SAND Cum 691 600
11 CORROSION RESISTANT STEEL Mt 32000 28560
12 DIESEL Ltr 62.24 62.24
13 EPOXY PAINT Kg 336 250
14 FUSE No 14 25
15 LIQUID CHLORINE (900 KG CONTAINER) No 12757 11560
16 LUBRICANT OIL Ltr 173 160
17 M.S. ANGLE(50*50*6 mm) Kg 33 30
18 M.S. BARS Mt 30 27
19 M.S. FLATS(40*3mm) Kg 35.5 32
20 M.S. PLATE Kg 35.5 32
21 M.S. GRILL READY Kg 42 39
22 M.S. GRILL RAILING Kg 42 39
23 MOBILE OIL Ltr 203 200
24 MURUM Cum 222 200
25 NAILS Kg 55 52
26 NUT BOLTS Kg 71 65
27 POLLING BOARD Cum 14488.5 14488.5
28 R.S. JOIST CHANNEL MT 37156 37060
29 RAPID SAND GRAVITY FILTER GRAVEL Cum 1481 1460
30 READY MIX LEAD/ZINC PAINT Ltr 164 147
31 READY MIX OIL PAINT Ltr 183 162
32 READY MIX PRIMER FOR STEEL Ltr 127 135
33 READY MIX SYBTHETIC ENAMEL PAINT Ltr 189 177
34 RUBBER GUSKET Kg 67.5 67.5
35 SAND Cum 691 610
36 SPUN YAM Kg 84 79
37 STONE AGGREGATE 10 mm Cum 750 720
38 STONE AGGREGATE 20 mm Cum 750 720
39 STONE AGGREGATE 40 mm Cum 750 720
40 STRUCTURAL STEEL M.T. 34834 34834
41 BLEACHING POWDER Kg 22 17
42 TEAK WOOD Cum 57171 57060
43 TOR STEEL Mt 33425 33340
44 WALLING (100*100 mm) Cum 13836 13820
45 WHITE CEMENT Kg 22 18
46 WHITE LEAD Kg 142 130
47 WIRE Kg 65 57
48 COMMERCIAL PLYWOOD FOR CENTERING Sqm 424 405
49 WELDING ROD Box 1175 1170
50 KASARDE SAND Cum 1585 1505
51 RUBBLE Cum 388 380
52 ACETYLENE GAS No 600 600
53 LIQUID CHLORINE No 2233 2200
54 PAC POWDER MT 24877 24840
55 PAC LIQUID MT 9090 8990
LABOUR

SR. TYPE OF LABOUR UNIT RATE RATE


NO. (SOR) (MARKET)
1 ASST. FITTER No. 329 400
2 BHANDHANI No. 362 400
3 BHISTI No. 312 350
4 BLACKSMITH CLASS 2 No. 362 400
5 BREAKER No. 362 400
6 CARPENTER CLASS 1 No. 434 700
7 CARPENTER CLASS 2 No. 362 500
8 CHISELLER No. 362 400
9 EXCAVATOR No. 290 400
10 FITTER CLASS1 No. 392 700
11 GLAZIER No. 362 500
12 HELPER No. 312 400
13 HOLE DRILLER No. 362 650
14 MASON CLASS 1 No. 312 700
15 MASON CLASS 2 No. 312 500
16 MAZDOOR (FEMALE) No. 362 350
17 MAZDOOR (HEAVY) No. 362 450
18 MAZDOOR (LIGHT) No. 362 400
19 MAZDOOR (MALE) No. 362 400
20 MISTRY No. 362 700
21 MUKADAM No. 362 900
22 PAINTER FOR COLORING No. 362 800
23 PAINTER No. 362 600
24 POLISHER No. 362 600
25 PUMP DRIVER No. 362 500
26 STONE CUTTER No. 362 500
27 TILE LAYER No. 362 700
28 WELDER No. 434 400
29 WELDER FOR PIPE LINE No. 434 600
30 WHITEWASHER No. 362 400
31 TILE TURNER No. 362 500
32 L.M.V. DRIVER No. 362 600
33 ELECTRICIAN No. 434 700
34 PLUMBER No. 434 700
35 MALI No. 312 450
36 WIREMAN No. 362 500
37 COMPUTER OPERATOR No. 507 500
38 METER READER No. 390 650
39 FILTER OPERATOR No. 441 500
HIRE CHARGES OF MACHINERIES

SR. MACHINERY UNIT RATE RATE


NO. (SOR) (MARKET)
1 RENT FOR CHAIN PULLEY BLOCK WITH DAY 450 700
TRIPOD
2 RENT FOR MECHANICAL MIXER WITH FUEL DAY 2415 2800
AND CREW
3 RENT FOR VIBRATOR WITH FUEL AND CREW DAY 945 1200
4 PLATE BENDER DAY 900 1250
5 RENT FOR WELDING SET WITH ELECTRIC SET DAY 1100 1600
6 RENT FOR WELDING SET WITH GENERATOR DAY 2400 3200
7 RENT FOR COMPRESSOR WITH FUEL DAY 2625 3250
8 RENT FOR POCLAIN DAY 2100 2600
9 RENT FOR CRANE DAY 1365 5000
10 RENT FOR JCB DAY 1050 4500
11 TRUCK HIRE CHARGES UPTO 20 Km DAY 2440 2500
12 TRUCK HIRE CHARGES FOR 20 Km TO 50 Km DAY 2228 2300
13 TRUCK HIRE CHARGES FOR 50 Km AND DAY 1697 1700
ABOVE
14 PIPE CUTTER WITH OPERATOR DAY 1313 1500
15 DESLUDGING/DESILTING PUMP DAY 2520 2650
16 RENT FOR CONCRETE BREAKER AND DAY 2500 2600
COMPRESSOR
RATE ANALYSIS
EXCAVATION
MANUAL EXCAVATION MACHINE EXCAVATION MACHINE EXCAVATION
(180 °) (360 °)

VOLUME: 10 VOLUME: 10 VOLUME:10


NO. OF LABOUR : 5 NO. OF MACHINERY: 01 NO. OF MACHINERY: 01
TIME TAKEN : 1.2 HRS TIME TAKEN : 0.4 HRS TIME TAKE : 0.2 HRS
RATE OF LABOUR: ₹ 362 RENT : ₹ 1050 RENT: ₹ 2100
AMOUNT PAID : ₹ 1810 AMOUNT PAID: ₹ 420 AMOUNT PAID: ₹ 600

REINFORCEMENT

AREA: 10
NO. OF LABOUR: 4 KARIGAR + 3 HELPER + 1 FOREMAN
RATE OF LABOUR: KARIGAR- ₹ 800
HELPER - ₹ 362
FOREMAN- ₹ 1000
AMOUNT PAID: 4*800+3*362+1*1000= ₹ 5286

AREA: 10 sq. m.
APPROXIMATE RATE: ₹ 280/sq. m.
AMOUNT TO BE PAID: ₹ 2800
SHUTTERING

AREA: 10 sq.m.
NO. OF LABOUR: 7 KARIGAR + 3 HELPER + 1 FOREMAN
RATE OF LABOUR : KARIGAR- ₹800
HELPER - ₹362
FOREMAN - ₹1000
AMOUNT PAID: 7*800+3*362+1*1000= ₹7686

AREA: 10 sq. m.
APPROXIMATE RATE: ₹ 200 sq.m.
AMOUNT PAID: ₹ 2000

CASTING

AREA: 10
NO. OF LABOUR: 3 LABOUR
RATE OF LABOUR: ₹ 362
AMOUNT PAID: 3*362= ₹ 1086

AREA: 10 sq.m.
APPROXIMATE RATE: ₹100 sq.m. (JUST LABOUR)
AMOUNT PAID: ₹1000

AREA: 10 sq.m.
APPROXIMATE RATE: ₹150 sq.m. (INCL. LABOUR, RAIL, MIXER MACHINE)
AMOUNT PAID: ₹1500
MASONRY

AREA: 10
NO. OF LABOUR: 2 MASONS + 3 HELPER
RATE OF LABOUR: MASON-₹312
HELPER-₹312
AMOUNT PAID: 2*312+3*312=₹1560

AREA: 10 sq.m.
APPROXIMATE RATE: ₹150 sq.m. (INCL. LABOUR, RAIL, MIXER MACHINE)
AMOUNT PAID: ₹1500

PLASTER

AREA: 10
NO. OF LABOUR: 2 MASONS + 3 HELPER
RATE OF LABOUR: MASON-₹312
HELPER-₹312
AMOUNT PAID: 2*312+3*312=₹1560

AREA: 10 sq.m.
APPROXIMATE RATE: ₹150 sq.m. (INCL. LABOUR, RAIL, MIXER MACHINE)
AMOUNT PAID: ₹1500

FLOORING

AREA: 10
NO. OF LABOUR: 2 MASONS + 2 HELPER
RATE OF LABOUR: MASON-₹312
HELPER-₹312
AMOUNT PAID: 2*312+2*312=₹1560

AREA: 10 sq.m.
PAINT

AREA: 10
NO. OF LABOUR: 1 MASONS + 1 HELPER
RATE OF LABOUR: MASON-₹312
HELPER-₹312
AMOUNT PAID: 1*312+1*312=₹1560

AREA: 10 sq.m.
APPROXIMATE RATE: ₹150 sq.m. (INCL. LABOUR, RAIL, MIXER MACHINE)
AMOUNT PAID: ₹1500
APPROXIMATE RATE: ₹150 sq.m. (INCL. LABOUR, RAIL, MIXER MACHINE)
AMOUNT PAID: ₹1500

CARPENTARY

AREA: 10
NO. OF LABOUR: 1 MASONS + 1 HELPER
RATE OF LABOUR: MASON-₹312
HELPER-₹312
AMOUNT PAID: 1*312+1*312=₹1560

AREA: 10 sq.m.
APPROXIMATE RATE: ₹150 sq.m. (INCL. LABOUR, RAIL, MIXER MACHINE)
AMOUNT PAID: ₹1500
CONSTRUCTION COST

TOTAL AREA 2115 sq. ft.


PROJECT COST IN Rs.
PROJECT LABOR COST IN Rs.
PROJECT COST RS. PER sq. ft.
PROJECT LABOR RS. COST PER sq.ft.

BILL OF QUANTITY
ITEM QUANTITY UNIT RATE TOTAL AMT.
BAZRI 46.53 Cu.m. 1400
BINDING WIRE 42.3 Kg 70
BITUMEN 71.91
BRICK BLAST 19.035
BRICK TILES 8460
BRICKS 41031
CEMENT 797.355
CEMENT FOR BASE COARSE 35.955
CEMENT GREY 48.645
CI PIPE 31.725
COARSE SAND 25.38
EARTH 19.035
EMULSION PAINT WITH LABOUR 888.3
EXTERIOR FINISHING WITH LABOUR 317.25
FINE SAND 29.3879
GLAZE TILES 105.75
IRON GRILLS 528.75
LABOUR FOR BRICK SUPER STRUCTURE
LABOUR FOR BRICK WORK FOUNDATION
LABOUR FOR CEILING PLASTER
LABOUR FOR CEMENT CONCRETE
LABOUR FOR DPC
LABOUR FOR EARTH EXCAVATION & EARTH FILLING
LABOUR FOR PIPE INCLUDING COST OF JOINTS
LABOUR FOR POINTING
LABOUR FOR RCC
LABOUR FOR STEEL RCC
LABOUR FOR WALL PLASTER
LABOUR FOR WHITE MARBLE FLOOR
MARBLE 226.305
MS STEEL 4230
SAND 65.565
SHUTTERING 3172.5
SPECIAL PAINT WITH LABOUR 423
STONE BLAST 40.185
TEAK WOD SHUTTER 31.725
TEAK WOOD 951.75
TEAKWOOD AND DECORATIVE 8.46
PLYWOOD
TEAKWOOD WINDOW SHUTTER 63.45
WHITE CEMENT 4.23
SUB TOTAL

EXCAVATION (3m*10m*10m=30 Cu. m.)


ITEM QUANTITY UNIT RATE TOTAL AMT.
JCB 1.2 Cu.m. 1050

FOUNDATION
ITEM QUANTITY UNIT RATE TOTAL AMT.
CEMENT CONCRETE 1:4:8
CEMENT 143.82
STONE BLAST 40.185
SAND 21.15
LABOUR FOR CEMENT CONRETE
TOTAL FOR CEMENT CONCRETE 1:4:8
BRICK WORK IN FOUNDATION WITH CEMENT MORTAR 1:4
LABOUR FOR BRICK WORK
FOUNDATION
SAND
CEMENT
BRICKS
TOTAL FOR BRICK WORK IN FOUNDATION WITH CEMENT
MORTAR 1:4
HORIZONTAL DPC WITH CEMENT CONCRETE 1:2:4( 40MM)
LABOUR FOR DPC
BITUMEN
CEMENT
COARSE SAND
BAZRI
TOTAL FOR HORIZONTAL DPC WITH CEMENT CONCRETE 1:2:4
( 40MM)
EARTH WORK IN EXCAVATION IN FOUNDATION AND FILLING UNDER FLOORS
LABOUR FOR EARTH EXCAVATION & EARTH FILLING
TOTAL FOR EARTH WORK IN EXCAVATION IN FOUNDATION AND
FILLING UNDER FLOORS

SUPER STRUCTURE
ITEM QUANTITY UNIT RATE TOTAL AMT.
RCC without Steel Cement Concrete 1:1.5:3
LABOUR FOR RCC
SHUTTERING
BAZRI
COARSE SAND
CEMENT
TOTAL FOR RCC WITHOUT STEEL CEMENT CONCRETE 1:1.5:3
MS Steel For RCC
MS STEEL
BINDING WIRE
LABOUR FOR STEEL RCC
TOTAL FOR MS STEEL FOR RCC
BRICK WORK IN SUPER STRUCTURE CEMENT MORTAR 1:4
LABOUR FOR BRICK SUP. STR
CEMENT
SAND
BRICKS
TOTAL FOR BRICK WORK IN SUPER STRUCTURE
CEMENT MORTAR 1:4
BRICK TILE TRACING ON ROOF
EARTH
SAND
CEMENT
LABOUR FOR BRICK TILES
BRICK TILES
BITUMEN
TOTAL FOR BRICK TILE TRACING ON ROOF
RAIN WATER PIPE
CI PIPE
LABOUR FOR PIPE INCLUDING COST
OF JOINTS
TOTAL FOR RAIN WATER PIPE
FLOORING
ITEM QUANTITY UNIT RATE TOTAL AMT.
White Marble Flooring
Marble
Cement Grey
White Cement
Cement for Base Coarse
Fine Sand
Brick Blast
Coarse Sand
Labour for White Marble Floor
Total for White Marble Flooring
PLASTERING/WALL TILES
ITEM QUANTITY UNIT RATE TOTAL AMT.
PLASTER ON CEILING (ROOF) CEMENT MORTAR 1:4
SAND
CEMENT
LABOUR FOR CEILING PLASTER
TOTAL FOR PLASTER ON CEILING (ROOF) CEMENT MORTAR 1:4
PLASTER ON WALLS CEMENT MORTAR 1:4
LABOUR FOR WALL PLASTER
CEMENT
SAND
TOTAL FOR PLASTER ON WALLS CEMENT MORTAR 1:4
CEMENT POINTING CEMENT MORTAR 1:2
Sand
Labour for Pointing
Cement
Total for Cement Pointing Cement Mortar 1:2
GLAZED TILES IN DADO OR SKIRTING IN BATHROOM SND KITCHEN WALLS

GLAZE TILE

TOTAL FOR GLAZED TILES IN DADO OR SKIRTING IN BATHROOM


SND KITCHEN WALLS
DOOR,WINDOW,CUPBOARD SHUTTER,IRON GRILLS
ITEM QUANTITY UNIT RATE TOTAL AMT.
TEAKWOOD DOOR
TEAK WOOD SHUTTER
TOTAL FOR TEAKWOOD DOOR
TEAKWOOD FRAME INCLUDING LABOUR
TEAKWOOD
TOTAL FOR TEAKWOOD FRAME INCLUDING LABOUR
TEAKWOOD WINDOW
TEAKWOOD WINDOW SHUTTER
TOTAL FOR TEAKWOOD WINDOW
TEAK WOOD FRAME SND DECORATIVE PLYBOARD SHUTTER
TEAKWOOD AND DECORATIVE
PLYBOARD
TOTAL FOR TEAK WOOD FRAME SND DECORATIVE PLYBOARD
SHUTTER
IRON GRILLING WITH LABOUR
IRON GRILLS
TOTAL FOR IRON GRILLING WITH LABOUR
PAINT
ITEM QUANTITY UNIT RATE TOTAL AMT.
EMULSION PAINT ON WALLS
EMULSION PAINT WITH LABOUR
TOTAL FOR EMULSION PAINT ON WALLS
EXTERIOR FINISH WITH EXTERIOR PAINT
EXTERIOR FINISHING WITH LABOUR
TOTAL FOR EXTERIOR FINISH WITH EXTERIOR PAINT
SPECIAL PAINT OR SPIRIT POLISH ON DOORS AND WINDOWS
SPECIAL PAINT WITH LABOUR
TOTAL FOR SPECIAL PAINT OR SPIRIT POLISH ON DOORS AND
WINDOWS
SUB TOTAL:
ADD 10% FOR ELECTRIC FITTING WIRING & LABOR:
ADD 10% FOR WATER SUPPLY FITTING & SANITARY:
ADD 5% FOR SEWERAGE:
GRAND TOTAL:

You might also like