Parts and Chapters: 28 February 2002 17 April 2014 17 April 2014
This document provides a list of effective pages for the Civil Aviation Authority of Bangladesh's Air Navigation Orders regarding airworthiness requirements. It outlines 21 chapters across two parts that cover topics like airworthiness certification, maintenance directions, and reporting of defects. The list details the chapter titles, page counts, issue numbers, and dates of issue for the airworthiness regulations.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
42 views
Parts and Chapters: 28 February 2002 17 April 2014 17 April 2014
This document provides a list of effective pages for the Civil Aviation Authority of Bangladesh's Air Navigation Orders regarding airworthiness requirements. It outlines 21 chapters across two parts that cover topics like airworthiness certification, maintenance directions, and reporting of defects. The list details the chapter titles, page counts, issue numbers, and dates of issue for the airworthiness regulations.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7
CIVIL AVIATION AUTHORITY OF BANGLADESH
AIR NAVIGATION ORDERS AIRWORTHINESS
REQUIREMENTS LIST OF EFFECTIVE PAGES Description Pages Issue Date of Issue No. Cover page 1 Introduction 1-2 4 28 February 2002 List of Effective Pages (LEP) 1-6 24 17 April 2014 Records of Revision 1 24 17 April 2014 PARTS AND CHAPTERS PART A – AIRWORTHINESS CERTIFICATION Chapters Title Pages Issue Date of Issue (ANO No.) No. A.1 Design Standards and issue of certificates 1-5 4 17 Sept. 2009 of type approval Appendix-1 Technical and Airworthiness data 1 4 17 Sept. 2009 Appendix-2 Application for issue of certificate of type 1-2 4 17 Sept. 2009 approval A.2 Import Procedures of Aircraft and Issue 1-10 5 05 April 2011 and Renewal of Certificate of Airworthiness Appendix-1 Technical Data For Aircraft Technical 1-9 5 CA-182C Clearance in Respect of Aircraft To Be Issue-5 Registered In Bangladesh 05 April 2011 Appendix-2 Application for issue of Certificate of 1-4 3 CA-25 Airworthiness (C of A) Issue-3 Appendix-3 Application for Aircraft Technical Clearance 1-8 4 CA-182C-1 in Respect of Wet Leased Aircraft to be Issue-4 Operated by Bangladeshi AOC Holders 05 April 2011 Appendix-4 Application for Renewal of Certificate of 1-2 3 CA-26 Airworthiness Issue-3 Appendix-5 Certificate of Inspection for Renewal of 1-2 2 AWS-16 Certificate of Airworthiness Issue-2 Appendix-6 Compliance Check List – Aircraft 1-5 4 17 Sept 2009 Documentation A.3 Export Certificate of Airworthiness 1-3 3 17 Sept. 2009
Appendix-1 Application for issue of Export Certificate of 1 1 AWS-15
Airworthiness Issue-1 A.4 Classification of Aircraft and Aircraft 1-2 2 01 August 1990 Operation A.5 Registration of Aircraft 1-3 2 01 August 1990
A.6 Flight Manuals 1-4 2 01 August 1990
A.7 Modification and Repair Design Data 1-7 2 28 February 2002
Approval
Issue - 24 Page 1 of 7 17 April 2014
Chapters Title Pages Issue Date of Issue (ANO No.) No. Appendix-1 Typical major modifications and major 1-4 2 28 February 2002 repairs Appendix-2 Criteria for the classification of major and 1-3 2 28 February 2002 minor modifications and repairs A.8 Assignment of mode S address and 1-7 1 28 February 2002 ground testing of ACAS transponder A.9 Aircraft Noise Certificate 1-5 3 05 May 2009
Appendix-1 Noise certificate 1 3 05 May 2009
A.10 Fees/Charges for Airworthiness Services 1-4 1 10 January 2005
A.11 Procedures for amendments of Air 1-3 1 17 May 2009
Navigation Order-AME license & airworthiness related PART B – MAINTENANCE DIRECTIONS B.1 Maintenance of Small aeroplanes and single 1-6 2 10 Nov. 2009 engined helicopters below MCTM of 3175 kg engaged in General Aviation operation not involving payment or promise of payment B.2 Maintenance of aeroplanes and helicopters 1-9 3 10 Nov. 2009 engaged in operations involving payment or promise of payment Appendix-1 Guidelines-scope of QC & QA functions 1-4 3 10 Nov 2009 B.3A Maintenance Certification System 1-10 1 09 February 2010
Appendix-1 Certificate of Compliance 1 1 09 February 2010
Maintenance Release – Aircraft after 1 1 09 February 2010 Appendix-2 specified scheduled maintenance Example of Maintenance Release- Aircraft 1 1 09 February 2010 Appendix-3 after lower scheduled maintenance and defect rectification Maintenance Release – Components 1-2 1 09 February 2010 Appendix-4 (Authorised Release Certificate) Appendix-5 Certificate of Fitness for Flight 1 1 09 February 2010
Appendix-6 Example of Routine Task Card 1 1 09 February 2010
1-2 1 09 February 2010
Appendix-7 Example of Non Routine Card (NRC)
B.4 Maintenance Log Books and Related 1-6 2 17 Nov. 2009
Records
B.5 Reporting, Investigation and Rectification 1-7 4 17 Sept. 2009
of Defects Chapters Title Pages Issue Date of Issue (ANO No.) No. Issue - 24 Page 2 of 7 17 April 2014 Appendix-1 Mandatory defect/occurrence report 1-2 4 17 Sep 2009 B.6 Aircraft Weight and Balance Control 1-4 1 01 August 1990 B.7 Approval of Engineering Executives 1-5 5 09 February 2010
Appendix-1 Bio-data of Engineering Executives 1 2 AWS-19
B.10 Duplicate Inspection-Aircraft Control 1-3 1 01 August 1990 B.11 Direct Reading Magnetic Compasses and 1-6 2 15 June 2012 Aircraft Instruments Overhaul & Periodic Inspections B.12 Altimeters and Pitot and Static Pressure 1-5 1 01 August 1990 Systems-Testing and Inspection B.13 Aircraft Leasing Arrangement 1-4 5 31 March 2011 B.14 Maintenance, Procurement, Distribution 1-11 3 13 July 2010 of Aeronautical Products and use of Aircraft Spares under Parts Pooling Agreement on Bangladesh Registered Aircraft Appendix-1 Acceptable Airworthiness Documents 1-4 3 13 July 2010 B.15 Approval of Aircraft Maintenance 1-12 2 17 Sept. 2009 Programme and Aircraft Maintenance Schedules Appendix-1 Sample copy of maintenance schedule approval 1-2 2 17 Sept. 2009 document
B.16 Aircraft Maintenance Log (AML) 1-4 1 28 February 2002
Appendix-1 Aircraft defect and servicing sector record 1 1 28 February 2002
page Appendix-2 Deferred defect record page 1 1 28 February 2002
B.17 Re-fuelling and de-fuelling with 1-3 1 28 February 2002
passengers embarking on board or disembarking B.18 Disposition of Scrap Aircraft Parts and 1-6 1 29 April 2009 Materials B.19 Reporting of Unapproved Parts to Type 1-9 1 04 May 2009 Certificate Holders and CAAB
Issue - 24 Page 3 of 7 17 April 2014
Appendix-1 Suspected Unapproved Parts(SUP) report 1 1 04 May 2009
B.20 Use of parts removed from an aircraft no 1-2 1 17 Sept. 2009
longer in service B.21 Age limit for import of aging aircraft and 1-10 3 16 April 2012 its maintenance Appendix-1 DSO/ DSG and LOV of some selected 1 3 16 April 2012 aircraft models
Issue - 24 Page 4 of 7 17 April 2014
Chapters Title Pages Issue Date of Issue (ANO No.) No. B.22 Requirements for registration and 1-11 1 15 January 2012 airworthiness control of free balloons PART C – CERTIFICATE OF APPROVAL-ORGANISATIONS AND INDIVIDUALS
C.1 Certificate of Approval-General 1-5 2 15 Nov. 2009
Appendix-1 Compliance Check List- Organisation 1 2 15 Nov. 2009 Exposition Contents C.2 Certificate of Approval – Aircraft 1-14 4 18 August 2011 Maintenance Organizations Appendix-1 Contents of Maintenance Procedures 1-6 2 22 Nov. 2009 Manual (MPM) Appendix - 1 Contents of Maintenance Procedures 7 3 10 April 2012 Manual (MPM) Appendix-2 Content of Quality Control and 1-3 3 15 June 2011 Assurance System (QCAS) Manual Appendix-3 Compliance check list - MPM 1-9 2 22 Nov. 2009 Appendix-4 Compliance check list - QCAS 1-4 3 15 June 2009 Manual Appendix-5 Brief description of the elements of 1-2 2 22 Nov. 2009 Safety Management System (SMS) PART- 145 Approved Maintenance FWD 1- 2 1 28 April 2011 Organization LOA-1 LEP 1- 3 TOC 1- 4 1- 35 2- 61 3- 9 4- 3 C.3 Certificate of Approval – Training 1-12 4 28 February 2002 Organizations and Engineering Instructors Appendix-1 Application for issue/renewal of 1 4 28 February 2002 Certificate of Approval of training institute Appendix-2 Training Procedures Manual - 1-4 4 28 February 2002 guidelines Appendix-3 List of recommended equipment and 1-15 4 28 February 2002 tools Appendix-4 List of the recommended books and 1-5 4 28 February 2002 reference publications Appendix-5 Application for initial issue/extension 1-3 4 28 February 2002 of basic/type course engineering instructor approval certificate C.4 Certificate of Approval - Stores and 1-5 3 28 February 2002 Distribution Organizations C.5 Certificate of Approval - Processing 1-3 1 01 August 1990 Organizations C.6 Certificate of Approval - Non- 1-3 1 01 August 1990 Destructive Testing Organization
C.7 Approval of Welders 1-4 1 01 August 1990
Issue - 24 Page 5 of 7 17 April 2014
Chapters Title Pages Issue Date of Issue (ANO No.) No. C.8 Issue of Company Authorization 1-3 3 28 December 2016
PART D – LICENSING-AIRCRAFT MAINTENANCE ENGINEERS
D.1 Issue of Aircraft Maintenance 1-5 4 21 December 1996
Engineer License 6-9 5 28 February 2002
D.2 Aircraft Maintenance Engineer 1-2 4 21 December 1996
License Type Ratings 21 December 1996 3-4 3 D.3 Privileges and responsibilities of 1 4 28 February 2002 licensed Aircraft Maintenance 2-8 3 21 Dec. 1996 Engineer 9 4 28 February 2002 D.4 Renewal of Aircraft Maintenance 1-2 3 12 May 2009 Engineer License D.5 AME Examination Syllabus 1-2 3 28 February 2002 3- 46 2 01 August 1990
47- 48 3 28 February 2002
49-50 1 28 February 2002
D.6 Validations of Foreign AME License 1-7 4 09 February 2010
Appendix-1 Application form for validation of 1 4 09 February 2010
foreign AME license or inspection authorisation D.7 List of Approved/ Accepted 1-3 2 01 March 2014 Training Organizations and Courses for appearing in AME License Examination PART E – AIRCRAFT EQUIPMENT E.1 Aircraft First Aid Kits and Emergency 1-3 1 01 August 1990 Medical Kits E.2 Flight Data Recorders 1-6 3 28 February 2002
E.3 Cockpit Voice Recorders 1-5 3 28 February 2002
E.4 Use of Automotive Gasoline 1-6 2 15 July 1999
E.5 Airworthiness and Operations 1-16 2 13 July 2010
Requirements for Extended Range Operations with Twin Engine Aeroplanes
Issue - 24 Page 6 of 7 17 April 2014
Chapters Title Pages Issue Date of Issue (ANO No.) No. Appendix-1 Application for grant of approval for 1 2 13 July 2010 ETOPS
(Flight Operations and Maintenance) Appendix-3 Example Of ETOPS operational approval 1-2 2 13 July 2010 programme (6 Month Timeline – Typical) E.6 Aircraft equipment, system and 1- 11 1 28 February 2002 instruments 12 2 10 November 2009 13 - 64 1 28 February 2002 Appendix-1 Supplemental oxygen for un-pressurized 1 1 28 February 2002 aeroplanes Appendix-2 Supplemental oxygen for pressurized 1 1 28 February 2002 aeroplanes E.7 Reserved - - -
E.8 Preparation, approval and use of flight 1-5 1 28 February 2002
crew check lists E.9 Approval for Special Flight 1- 4 2 17 Sept 2009
Appendix-1 Form AWS-20 1-2 2 17 Sept 2009
(Application for Special Flight) Appendix-2 Form AWS-14 1 2 17 Sept 2009 (Approval for Special Flight) E.10 Airworthiness Requirements for 1-5 1 03 May 2009 Operation of Aircraft in MNPS Airspace E.11 Requirements for Implementation of 1-14 1 04 May 2009 Reduced Vertical Separation Minimum (RVSM) 15-16 2 17 April 2014 Appendix-1 RVSM performance 1-2 1 04 May 2009
E.12 Airworthiness Approval for RNAV/RNP 1-10 1 30 April 2009
Operation PART F- AIRWORTHINESS AND OPERATIONS DIRECTIONS
F.1 SAFETY ASSESSMENT OF FOREIGN 1-7 1 3rd July 2012