Item Pengujian Commisioning Pltu Baruta 2X7 MW No System Test Item Comm. Status Remark
Item Pengujian Commisioning Pltu Baruta 2X7 MW No System Test Item Comm. Status Remark
·Stability Test
·Individual Test
·Function
33 MCC Panel
·Function ProtectionTest
·The breaker interlock
PREPARED FOR COMMISIONING
IPP PLTU 2 X 7 MW BARUTA, SANGIA WAMBULU, BUTON SELATAN
SULAWESI TENGGARA
·Boiler Management System
·Sequence Control System
34 Boiler Instrument Control System
·Sequence of Event Recorder
·Modulation Control System
·Turbine Supervisory Instrument
·Emergency Trip System
35 Turbine Instrument Control System ·Sequence Control System
·Sequence of Event Recorder
·Modulation Control System
·Function
36 Turbine Generator Interlock Turbine Trip
Generator Trip
37 Condeser Vacuum Up Test ·Function
38 Emergency Trip Turbine Test ·Emergency Trip Local, CCR
·Friction & rub check at low speed
39 Steam admission & first rolling turbine ·Critical Speed Measurement
·Coast down time check
·Throttle Stop Valve
40 Steam valve Tighness Test
·Turbine control Valve
41 Over Speed Test ·Over Speed Electrical, Mekanikal