Transmission A40F Inspection Form
Transmission A40F Inspection Form
SERVICE BULLETIN
Language Code Group Product No. Version Date Page
GB 420 ART 81 K 1 2012-01-27 1/5
Applies to models
A25F, A30F, A35F, A35F FS, A40F, A40F FS
WARNING
Please pay attention to the safety instructions in the Operator's
and Service Manuals concerned.
This Service Bulletin is to be considered as technical information
only and is not subject to any reimbursement programs outside
normal warranty.
If there has been a claim regarding a transmission and it is
replaced by a new transmission or an exchange transmission, this
Service Bulletin must be enclosed in a plastic cover together with
the transmission. A completed copy for each occasion must
accompany the replaced unit, otherwise the claim will not be
approved.
NOTE!
This report must be added in Techline not later than five days after
the inspection date.
The replaced transmission must be cleaned and packed to give
maximum protection during the return transportation.
Fig.1 Transmission, left side
NOTE!
In case of insufficient packing, charges will be debited regardless
of whether the claim is correct or not.
This routine applies to a transmission ordered on an exchange
number or a production number.
The purpose is to safeguard the quality of the returned units with
regard to quality follow-up and to facilitate reconditioning and
provide our Service Department with up-to date information.
Claims regarding a transmission can only be made, if there is a
material defect. In case of a leaking transmission the point of the
leak must be clearly marked in Figs 1 and 2.
Machine
Dealer: ________________________________ Customer: ________________________________
Replaced transmission
Part No.: _________________________ Serial No.: __________________ Operating hours: _____________
New transmission
Part No.: _________________________ Serial No.: __________________
B1 D 16 (9.9) F5
Pressure to brake B1
B2 D 22 (13.7) F6
Pressure to brake B2
B3 D 12 (7.5) F4
Pressure to brake B3 R 14 (8.7) R3
B4 N 0 N
Pressure to brake B4 D 0 F2/F1
R 0 R1
B5 N 0 N
Pressure to brake B5 (a)
N 0 N
(b)
D(a) 0 F2
D(b) 0 F1
R 0 R1
K1 D 0 F2/F1
Pressure to clutch K1
K2 R 0 R1/F7
Pressure to clutch K2
Language Code Group Product No. Version Date Page
GB 420 ART 81 K 1 2012-01-27 4/5
K3 N(a) 0 N
Pressure to clutch K3
N(b) 0 N
D(a) 0 F2/R2
D(b) 0 F1
LU Disengaged 0 –
Pressure to lock-up clutch in Engaged >14 (>8.7) –
torque converter
a)Applies if the machine is set to start in gear F2 (Set with VCADS Pro and parameter CMY. When delivered, this machine
parameter is set to On, which means that the machine normally starts in gear F2)
b)Applies if the machine is set to start in gear F1
NOTE!
This report must be added in Techline not later than five days after
the inspection date.
Language Code Group Product No. Version Date Page
GB 420 ART 81 K 1 2012-01-27 5/5
Software
NOTE!
Check whether the new transmission requires new software/ECU/PROM.
If new software is downloaded, check that all parameters are correct.
Machine/transmission
Check that cable harnesses and connectors are functional.
Make sure that the current supply on the machine is correct.
Miscellaneous
Fill in and send in the inspection form according to the latest Service Bulletin.
Return the replaced transmission heat exchangers together with the transmission.