0% found this document useful (0 votes)
46 views1 page

Dish

Uploaded by

kamal wani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

Dish

Uploaded by

kamal wani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

so the ACP does not have to take that decision.

However, the ACP does prioritize the various site


activations, between the already selected sites and the new activation suggestions from the ACP.
Site Activation mode also allows you to select the option to specify a minimum intersite distance.
You can enter a minimum inter-site distance value. When selecting a site for activation, all sites
that are within the specified minimum inter-site distance from the selected site will be not be
considered for activation. Adding site candidates The site selection process involves the selection
of sites, from a list of candidate sites, to activate or to deactivate, with the objective of optimizing
the quality of the network while limiting the number of sites to deploy. To achieve this goal, it is
sometimes necessary to add additional site candidates. The list of potential site candidates is
drawn from point files added to the optimization settings. These point files contain points, each of
which is assigned a priority represented by a value from 1 to 10, where 10takes precedence over
all other priorities -the higher the number, the higher the priority. This priority determines
whether a site candidate is placed ahead of another site candidate. Where a site candidate is
placed is determined by registered trademarks of their respective owners. The publisher is not
associated with any product or vendor mentioned in this book Limit of Liability/Disclaimer of
Warranty: While the publisher and author have used their best efforts in preparing this book, they
make no representations or warranties with respect to the accuracy or completeness of the
contents of this book and specifically disclaim any implied warranties of merchantability or
fitness for a particular purpose. It is sold on the understanding that the publisher is not engaged in
rendering professional services and neither the publisher nor the author shall be liable for
damages arising herefrom. If professional advice or other expert assistance is required, the
services of a competent professional should be sought.
egistered office John Wiley & Sons Ltd, The Atrium, Southern Gate, Chichester, West Sussex,
PO19 8SQ, United Kingdom For details of our global editorial offices, for customer services a