0% found this document useful (0 votes)
301 views

Checklist For Datasheet Pig Launcher

This document is a checklist for mechanical checks of a pig launcher equipment. It contains items to be checked grouped under general information, design data, testing, nozzles, materials, and drawings. The checklist includes items like location, tag number, design pressure and temperature, insulation, non-destructive testing requirements, nozzle details, material specifications, and sketches. It has been filled out and signed off by three engineers to verify the items have been checked.

Uploaded by

Risyda Putri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
301 views

Checklist For Datasheet Pig Launcher

This document is a checklist for mechanical checks of a pig launcher equipment. It contains items to be checked grouped under general information, design data, testing, nozzles, materials, and drawings. The checklist includes items like location, tag number, design pressure and temperature, insulation, non-destructive testing requirements, nozzle details, material specifications, and sketches. It has been filled out and signed off by three engineers to verify the items have been checked.

Uploaded by

Risyda Putri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

MECH CHECKLIST PT.

AMEC BERCA INDONESIA


EQUIPMENT : PIG LAUNCHER MECHANICAL DISCIPLINE
DOCUMENT CHECKING : DATASHEET

CHECK SHEET NO JUDGEMENT ORIGINATOR VERIFIED APPROVED


FRONT END ENGINEERING DESIGN 2 (FEED 2) ONSHORE PIPELINE SENIPAH - RU V
PROJ. NAME NAME DH AND AND
BALIKPAPAN
PROJ. NO. 8857 DATE 20/04/2020 24/04/2020 29/04/2020
TAG NUMBER SNP-MPT-101 SIGNED
REV. NO A
1st 2nd 3rd
ITEM TO BE CHECKED CONTENTS TO BE CHECKED
ENGINEER S. ENGINEER L. ENGINEER

1 LOCATION ✘ ✘ ✘
GENERAL
2 TAG NO.
INFORMATION ✘ ✘ ✘

2 CODE & REGULATION


✘ ✘ ✘
3 PRESSURE (OPERATING/DESIGN)
✘ ✘ ✘
4 TEMPERATURE (OPERATING/DESIGN)
✘ ✘ ✘
5 HYDROSTATIC PRESSURE
✘ ✘ ✘
6 CORROSION ALLOWANCE
✘ ✘ ✘
7 DIMENSION & LENGTH
✘ ✘ ✘
- MAJOR BARREL
✘ ✘ ✘
- MINOR BARREL
✘ ✘ ✘
8 THICKNESS
✘ ✘ ✘
- MAJOR BARREL
✘ ✘ ✘
- MINOR BARREL
✘ ✘ ✘
DESIGN DATA - REDUCER
✘ ✘ ✘
9 MDMT
✘ ✘ ✘
10 MAWP
✘ ✘ ✘
11 JOINT EFFICIENCY
✘ ✘ ✘
12 INSULATION
✘ ✘ ✘
13 PAINTING (EXTERNAL / INTERNAL)
✘ ✘ ✘
14 WEIGHT VESSEL (EMPTY, OPERATING, FULL OF WATER)
✘ ✘ ✘
15 CODE STAMP
✘ ✘ ✘
16 SEISMIC CODE & DETAIL DATA
✘ ✘ ✘
GENERAL CHECK 17 WIND CODE & DETAIL DATA
✘ ✘ ✘
18 DESIGN FACTOR
✘ ✘ ✘

1 PWHT
✘ ✘ ✘
2 IMPACT TEST
✘ ✘ ✘
3 RADIOGRAPHY
✘ ✘ ✘
TESTING 4 PARTICLE MAGNETIC INSPECTION (MPI) ✘ ✘ ✘
5 DYE PENETRANT
✘ ✘ ✘
6 ULTRASONIC
✘ ✘ ✘

1 NOZZLE MARK, NOZZLE QUANTITY


✘ ✘ ✘
2 NOZZLE SIZE, RATING, FACE, NOZZLE THICKNESS / SCH
✘ ✘ ✘
NOZZLE 3 NOZZLE DESCRIPTION/SERVICE ✘ ✘ ✘
4 NOZZLE PROJECTION & REMARKS ✘ ✘ ✘

1 APPLICABLE MATERIAL SPECIFICATION


MATERIAL ✘ ✘ ✘

1 SKETCH
✘ ✘ ✘
2 SLIDING & FIX SADDLE POSITION
✘ ✘ ✘
DRAWING 3 EARTHING LUG POSITIOIN ✘ ✘ ✘
4 LIFTING LUG ARRANGEMENT & QUANTITY ✘ ✘ ✘

1 ALL NECESSARIES NOTE


NOTES ✘ ✘ ✘

1 PROJECT DESCRIPTION
✘ ✘ ✘
PAPER FORM 2 REVISION STATUS
OTHERS CHECK ✘ ✘ ✘
DETAIL 3 PAGE NUMBER
CHECK PRINT
✘ ✘ ✘

DICIPLINE : MECHANICAL
DESCRIPTION DATE INITIAL PARAF
Originated 20/04/2020 DH
Checked 24/04/2020 DH
Eng. Check 24/04/2020 AND
PREPARED BY Back Draft 29/04/2020 DH CHECKED BY APPROVED BY

Back Check 29/04/2020 DH


Approved 29/04/2020 AND
( Deny Hardiyanto ) ( Andrianto ) ( Andrianto )

Page 1
MECH CHECKLIST PT. AMEC BERCA INDONESIA
EQUIPMENT : PIG LAUNCHER MECHANICAL DISCIPLINE
DOCUMENT CHECKING : DATASHEET

CHECK SHEET NO JUDGEMENT ORIGINATOR VERIFIED APPROVED


FRONT END ENGINEERING DESIGN 2 (FEED 2) ONSHORE PIPELINE SENIPAH - RU V
PROJ. NAME NAME DH AND AND
BALIKPAPAN
PROJ. NO. 8857 DATE 20/04/2020 24/04/2020 29/04/2020
TAG NUMBER SNP-MPT-101 SIGNED
REV. NO A

Page 2
CHECKLIST FOR DATASHEET PIG RECEIVER

CHECK PRINT
DICIPLINE : MECHANICAL

DESCRIPTION DATE INITIAL PARAF


Originated

Checked
Eng. Check

Back Draft
Back Check

Approved
CHECKLIST FOR DATASHEET SHELL AND TUBE HEAT EXCHANGER
CHECKLIST FOR DATASHEET AIR COOLER HEAT EXCHANGER
CHECKLIST FOR DATASHEET POSITIVE DISPLACEMENT PUMP
CHECKLIST FOR DATASHEET POSITIVE CENTRIFUGAL PUMP
CHECKLIST FOR DATASHEET AIR COMPRESSOR PACKAGE
CHECKLIST FOR DATASHEET METHANOL INJECTION PACKAGE

You might also like