0% found this document useful (0 votes)
84 views3 pages

Test Plan Template Planio

This document provides a template for creating a test plan with sections for an introduction, test risks and mitigation strategies, testing scope, test approaches, pass/fail criteria, entry/exit criteria, test deliverables, environment/staffing/training needs, and sign-off. The template can be used to ensure all necessary information is included in a test plan to thoroughly test a new software feature or product.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views3 pages

Test Plan Template Planio

This document provides a template for creating a test plan with sections for an introduction, test risks and mitigation strategies, testing scope, test approaches, pass/fail criteria, entry/exit criteria, test deliverables, environment/staffing/training needs, and sign-off. The template can be used to ensure all necessary information is included in a test plan to thoroughly test a new software feature or product.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Get your projects on track ,

visit planio.com

Test Plan Template


A test plan is a detailed document that outlines the test strategy,
objectives, resources needed, schedule, and success criteria
for testing a specific new feature or piece of software.
Using this template, you’ll be able to ensure you have a rock-solid test plan and that
nothing is getting missed during the testing phase of your development process.

Need help filling it out? Learn how to write and execute a test plan on our blog.

INTRODUCTION
Provide the purpose of the Test Plan for this specific project.

TEST RISKS / ISSUES


Describe the risks associated with your test plan as well as mitigation strategies.

Test Plan Risk Mitigation Strategy

TESTING SCOPE
Outline the items/features/functions that will be tested, how they’ll be tested, when,
and by whom. Include a separate list of items not in the scope of this test plan.

Test item Description Date Responsibility

1/3
Get your projects on track ,
visit planio.com

Items outside of scope:


1.

2.

3.

4.

5.

TEST APPROACHES
Describe the overall testing approach as well as an outline of any planned tests.

Test approach Scope Proposed date

PASS/FAIL CRITERIA
Describe the criteria used to determine if a test item as passed or failed a test.

ENTRY / EXIT CRITERIA


Outline the criteria used to start, suspend, or stop testing.

2/3
Get your projects on track ,
visit planio.com

TEST DELIVERABLES
Describe the deliverables that will result from the testing
process (for example, documents, reports, etc…)

Deliverable Responsibility

ENVIRONMENT / STAFFING / TRAINING NEEDS


Describe the specific requirements needed to execute on the test plan
such as hardware, software, team expertise, and skill training.

SIGN-OFF
Include space for signoff from key stakeholders to ensure everyone understands the scope
of testing, why you’ve chosen specific approaches, and when it will be completed.

3/3

You might also like