8D Problem Solving Worksheet - Long Form
8D Problem Solving Worksheet - Long Form
Status
Registered problem and Long Term Corrective Long Term Corrective Long Term Corrective
Short Term Corrective Action developed but not Action implemented. Action confirmed effective.
Action in place in house. implemented. Monitoring/evaluating Problem closed.
effectiveness.
Prepare for Problem Solving - Is an Emergency Response Action Needed?
Does the problem warrant/require an 8D? If (If needed document actions in Action Item Table)
0 so comment why and proceed.
Assemble Team –
Establish a small group of people with the process/product knowledge, allocated time, authority and skill in
1 the required technical disciplines to solve the problem and implement corrective actions.
Name (Team Leader First) List the name of the participant during the analysis & add the position in the
organization
Name Position in the Organization
Antonio Carpinteyro Quality Manager Mexico
Omar Cortés Quality Engineer
Faurecia team
COINDU Mexico
2B IS IS NOT
Incoming inspection in quality wall of Mastrotto Mastrotto facilities
Who
Part with plastic between leather and hacoflex Wrong parameters of lamination, excess of hair
or another process condition
What
the piece of leather is not stick properly Is not another condition in the piece and
process
Why
Where
When
Train all people involve in lamination process (quality alert and in the removal of the plastic) (DONE)
The lamination of
the parts was not
done correctly
Note on Diagram(s) circle the most likely contributors (3 max) from each side.
4B 5 – Why Analysis
Ask – Why did this happen? The lamination of the parts was not done correctly
Ask – Why did this happen? The part was separated at the moment of manipulation
Ask – Why did this happen? People did not remove transparent plastic.
5 Identify Solutions
– Perform a work instruction in order to define correct steps to carry out the tasks in lamination
process, to remove properly the plastic (DONE)
Request to supplier the possibility to change the color of the plastic in the hacoflex, in order to assure
that the operator remove the transparent plastic.
-
Validation –
1. Perform audits of standardized work periodically (weekly)
6 2. Perform product audits to validate this condition
3. Notify COINDU when we do not have hacoflex with transparent plastic
Completion Date
Check if
Document Assignee
Applicable
Planned Actual
Control Plans
PFMEA
QA Inspection Forms
Updated WI in
WI Procedure(s) 19/10/16 Done
lamination process
Job Descriptions(s)
Inform when we could
have all hacoflex with
Job Certifications/ Recertify Open Open
different color of the
plastic
Congratulate Your Team!
- Use all forms of employee recognition and document as necessary.
8 Celebrate successful conclusion of the problem solving effort.
Formally disengage the team and return to normal duties.
Was the Problem Solving Worksheet Effective?