1.1 The initial gap analysis checklist in Table 5-A7-1 can be used as a template to conduct the first step of an SMS gap
analysis. This format with its overall “Yes/No/Partial” responses will provide an initial indication of the broad scope of gaps and
hence overall workload to be expected. The questionnaire may be adjusted to suit the needs of the organization and the nature of the
product or service provided. This initial information should be useful to senior management in anticipating the scale of the SMS
implementation effort and hence the resources to be provided. This initial checklist would need to be followed up by an appropriate
implementation plan as per Tables 5-A7-2 and 5-A7-3.
1.2. A “Yes” answer indicates that the organization meets or exceeds the expectation of the question concerned. A “No”
answer indicates a substantial gap in the existing system with respect to the question’s expectation. A “Partial” answer indicates that
further enhancement or development work is required to an existing process in order to meet the question’s expectations.
Note.— The SSP references in square [ ] brackets refer to guidance material in this manual relevant to the
gap analysis question.
1.1-2 Does the safety policy reflect senior management’s commitment Yes
regarding safety management? No
[5.3.7 to 5.3.15] Partial
1.1-3 Is the safety policy appropriate to the size, nature and complexity of the Yes
organization? No
[5.3.7 to 5.3.15] Partial
5-App 7-1
5-App 7-2 Safety Management Manual (SMM)
1.1-5 Is the safety policy signed by the accountable executive? [5.3.7 Yes
to 5.3.15; 5.5.3] No
Partial
1.2-2 Does the accountable executive have full control of the financial and Yes
human resources required for the operations authorized to be No
conducted under the operations certificate? Partial
[5.3.16 to 5.3.26]
1.2-3 Does the Accountable Executive have final authority over all Yes
aviation activities of his organization? No
[5.3.16 to 5.3.26] Partial
1.2-5 Is there a safety committee or review board for the purpose of Yes
reviewing SMS and safety performance? No
[5.3.27 to 5.3.33; Appendix 4] Partial
1.2-8 Are there safety action groups that work in conjunction with the Yes
safety committee (especially for large/complex organizations)? No
[5.3.27 to 5.3.33; Appendix 4] Partial
No. Aspect to be analysed or question to be answered Answer Status of implementation
1.3-1 Has [Organization] appointed a qualified person to manage and oversee Yes
the day-to-day operation of the SMS? No
[5.3.27 to 5.3.33; 5.5.2; Appendix 2] Partial
1.3-2 Does the qualified person have direct access or reporting to the Yes
accountable executive concerning the implementation and operation No
of the SMS? Partial
[5.3.27 to 5.3.33; 5.5.2; Appendix 2, 6.1]
1.3-3 Does the manager responsible for administering the SMS hold other Yes
responsibilities that may conflict or impair his role as SMS manager? No
[Appendix 2, 6.4] Partial
1.3-4 Is the SMS manager’s position a senior management position not lower Yes
than or subservient to other operational or production positions? No
[Appendix 2, 6.4] Partial
1.4-2 Does the emergency/contingency plan address all possible or likely Yes
emergency/crisis scenarios relating to the organization’s aviation No
product or service deliveries? Partial
[Appendix 3, 4 f)]
1.4-3 Does the ERP include procedures for the continuing safe production, Yes
delivery or support of its aviation products or services during such No
emergencies or contingencies? Partial
[Appendix 3, 4 e)]
1.4-4 Is there a plan and record for drills or exercises with respect to the Yes
ERP? No
[Appendix 3, 5 c)] Partial
1.4-5 Does the ERP address the necessary coordination of its Yes
emergency response/contingency procedures with the No
emergency/response contingency procedures of other Partial
organizations where applicable?
[Appendix 3, 4 d)]
1.4-7 Is there a procedure for periodic review of the ERP to ensure its Yes
continuing relevance and effectiveness? No
[Appendix 3, 5 f)] Partial
1.5-2 Does the SMS documentation address the organization’s SMS and its Yes
associated components and elements? No
[5.3.36 to 5.3.38; 5.4.1; Appendix 4] Partial
1.5-6 Does the SMS implementation plan address the coordination Yes
between the service provider’s SMS and the SMS of external No
organizations where applicable? Partial
[5.4.4]
2.2-3 Is there a procedure for periodic review of existing risk mitigation Yes
records? No
[5.5.4] Partial
2.2-6 Is there a programme for systematic and progressive review of all Yes
aviation safety-related operations, processes, facilities and equipment No
subject to the HIRM process as identified by the organization? Partial
[5.5.4]
No. Aspect to be analysed or question to be answered Answer Status of implementation
3.1-1 Are there identified safety performance indicators for measuring and Yes
monitoring the safety performance of the organization’s aviation No
activities? Partial
[5.3.66 to 5.3.73; 5.4.5; 5.5.4; 5.5.5; Appendix 6]
3.1-2 Are the safety performance indicators relevant to the organization’s Yes
safety policy as well as management’s high-level safety No
objectives/goals? Partial
[5.3.66 to 5.3.73; 5.4.5; Appendix 6]
3.1-4 Is the setting of alert levels or out-of-control criteria based on objective Yes
safety metrics principles? No
[5.3.66 to 5.3.73; 5.4.5; Appendix 6] Partial
3.1-6 Are safety performance indicators and their associated performance Yes
settings developed in consultation with, and subject to, the civil No
aviation authority’s agreement? Partial
[5.3.66 to 5.3.73; 5.4.5.2; 5.5.4; 5.5.5]
3.1-7 Is there a procedure for corrective or follow-up action to be taken when Yes
targets are not achieved and alert levels are exceeded/ breached? No
[5.4.5; Appendix 6, Table 5-A6-5 b)] Partial
3.2-1 Is there a procedure for review of relevant existing aviation safety- Yes
related facilities and equipment (including HIRM records) whenever No
there are pertinent changes to those facilities or equipment? Partial
[5.3.74 to 5.3.77; 5.5.4]
No. Aspect to be analysed or question to be answered Answer Status of implementation
3.2-2 Is there a procedure for review of relevant existing aviation safety- Yes
related operations and processes (including any HIRM records) No
whenever there are pertinent changes to those operations or Partial
processes?
[5.3.74 to 5.3.77; 5.5.4]
3.2-4 Is there a procedure for review of relevant existing facilities, equipment, Yes
operations or processes (including HIRM records) whenever there are No
pertinent changes external to the organization such as regulatory/industry Partial
standards, best practices or technology?
[5.5.4]
3.3-1 Is there a procedure for periodic internal audit/assessment of the SMS? Yes
[5.3.78 to 5.3.82; 5.5.4; 5.5.5] No
Partial
3.3-3 Does the SMS audit plan include the sampling of Yes
completed/existing safety risk assessments? [5.5.5] No
Partial
3.3-4 Does the SMS audit plan include the sampling of safety Yes
performance indicators for data currency and their target/alert No
settings performance? Partial
[5.4.5; 5.5.5]
3.3-5 Does the SMS audit plan cover the SMS interface with Yes
subcontractors or customers where applicable? No
[5.4.1; 5.5.5] Partial
4.1-3 Are personnel involved in conducting risk mitigation provided with Yes
appropriate risk management training or familiarization? No
[5.3.86 to 5.3.91; 5.5.5] Partial
4.2-2 Is there evidence of a safety (SMS) publication, circular or channel for Yes
communicating safety (SMS) matters to employees? [5.3.92; 5.3.93; No
5.5.5] Partial
4.2-3 Are [Organization] SMS manual and related guidance material Yes
accessible or disseminated to all relevant personnel? No
[5.3.92; 5.3.93; 5.5.5] Partial