Motors Overhauling Checklist
Motors Overhauling Checklist
DI-CS
Frame:447TS
Tag:- S.NO Rating(HP)
Plant:-
Manufacturer:-
Sr.No Electrical Tests Method/Tool used
Pahse to Phase
1 Insulation Tests X-Y
a Main Stator@ 1000VDC Megger
MIT-5
Results
Pahse to Phase Phase to Earth Remarks
X-Z Y-Z U V W
X-Z Y-Z
Visual
Remarks
D.E Side Non-D.E
70.02
150.02 Both Bearing Bore Rectified
6314C3 New Changed.
Special Grease
NO Pully missing. Only key received
Signature
Name
Date:
RECEIVING INSPECTION REPORT
Tag:- Frame size Rating(HP) Volts
Plant:-
Manufacturer:-
Sr.No Electrical Tests Method/Tool used
Pahse to Phase
1 Insulation Tests U-V V-W
a Main Stator@ 1000VDC Megger
MIT-5
Results
hse to Phase Phase to Earth Remarks
U-W U V W
Y-Z
Methods/Tools Results
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Visual
Remarks
D.E Side Non-D.E