Deck Slab Level Sheet Before Casting

This document is a level sheet for casting the deck slab of a bridge replacement project on NH 202 in Manipur, India. It provides details of the longitudinal length, theoretical and actual slab top levels, and level differences at upstream edge, center, and downstream edge measurement points for 44 sections along the 40.65 meter bridge deck. The project involves replacing two old dilapidated Bailey bridges with a new box type steel grider bridge with a concrete decking and no footpath.

Uploaded by

Prasun
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
166 views

Deck Slab Level Sheet Before Casting

This document is a level sheet for casting the deck slab of a bridge replacement project on NH 202 in Manipur, India. It provides details of the longitudinal length, theoretical and actual slab top levels, and level differences at upstream edge, center, and downstream edge measurement points for 44 sections along the 40.65 meter bridge deck. The project involves replacing two old dilapidated Bailey bridges with a new box type steel grider bridge with a concrete decking and no footpath.

Uploaded by

Prasun
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DECK SLAB LEVEL SHEET BEFORE CASTING

Replacement of two Old dilapidated Bailey Bridge at Km26.28 with Unibridge Box Type Steel Grider with concrete decking ( Permanent Bridge positive camber)
Project -
without footpath on NH 202 (old NH 150), Churachandpur- Tipaimukh Road in the State of manipur
Client- National Highways and Infrastructure Development Corporation Limited (NHDCL)
Contractor- Titagarh Bridges And International Pvt. Ltd
Up Stream Edge Center Down Stream Edge
Sl Longitudinal Length Existing Existing Existing Theoretic
Theoretical slab Actual Slab Level Theoretical slab Actual Slab Level Actual Slab Level
No. (M) Girder Top Girder Girder al slab
Top Level Top Level Difference Top Level Top Level Difference Top Level Difference
Level Top Level Top Level Top Level

1 0.35
2 1.00
3 2.00
4 3.00
5 4.00
6 5.00
7 6.00
8 7.00
9 8.00
10 9.00
11 10.00
12 11.00
13 12.00
14 13.00
15 14.00
16 15.00
17 16.00
18 17.00
19 18.00
20 19.00
21 20.00
22 21.00
23 22.00
24 23.00
25 24.00
26 25.00
27 26.00
28 27.00
29 28.00
30 29.00
31 30.00
32 31.00
33 32.00
34 33.00
35 34.00
36 35.00
37 36.00
38 37.00
39 38.00
40 39.00
41 40.00
42 41.00
43 42.00
44 42.65
Remarks :-

Name :

Signature :
TBIPL Representative NHIDCL Representative