Section Thru A-A Section Thru B-B: Ground Floor Plan Typical Second To Fourth Floor Plan
Section Thru A-A Section Thru B-B: Ground Floor Plan Typical Second To Fourth Floor Plan
30
A B C D E A B C D E ROOF APEX
14.00
1.50
3.00 4.00 4.00 3.00
14.00
2.20 1.80 1.80 2.20 4TH FCL
3.00 3.00 1.00 1.00 3.00 3.00
UNIT 6 T&B 6 T&B 7 UNIT 7 UNIT 7
3
3
2.60
1.50
1.50
A
A
3.00
3.00
4TH FFL
STUDIO TYPE UNIT STUDIO TYPE UNIT UNIT 4 T&B 4 T&B 5 UNIT 5 UNIT 5
5.50
5.50
PARKING SPACE STUDIO TYPE UNIT
5.50
5.50
3.00
2
2.70
2
3.50
13.20
2.50
2.50
3RD FFL
1.00
UNIT 2 UNIT 3 UNIT 3
0.50
1
T&B 2 T&B 3
1
3.00
4.00 2.00 2.00 2.00 4.00
6.00 2.00 2.00 4.00
14.00
14.00
B 2ND FFL
B
1 GROUND FLOOR PLAN TYPICAL SECOND TO UNIT 1 T&B 1 PARKING PARKING
2 FOURTH FLOOR PLAN
A 2 SCALE: 1:100 MTS
3.10
A 2 SCALE: 1:100 MTS
0.30
FFL
0.20
ROOF APEX NGL
3 4
4TH FCL A 2 SCALE: 1:100 MTS A 2 SCALE: 1:100 MTS
0.30
ROOF APEX
2.60
1.50
4TH FFL
4TH FCL
2.70
2.60
13.20
2.70
3.00
FIREWALL
13.20
3RD FFL
2ND FFL
3.00
3.10
2ND FFL
FFL
0.20
NGL
3.10
5 6
A 2 SCALE: 1:100 MTS A 2 SCALE: 1:100 MTS
FFL
0.20
14.70 0.70 NGL
14.00
0.70
0.70
7
A 2
REAR ELEVATION
SCALE: 1:100 MTS
8
A 2
LEFT SIDE ELEVATION
SCALE: 1:100 MTS
5.50
6.90
0.55
1.20
2.10
2.10
1.55
0.90
0.70
0.70
14.00
14.70 0.70
10 ROOF PLAN 9
A 2
SCHEDULE OF DOORS AND WINDOWS
SCALE: 1:100 MTS
A 2 SCALE: 1:100 MTS
CIVIL ENGINEER: NOTE: PROJECT TITLE: APPROVED AS TO PLAN: REVISIONS: SHEET CONTENT: SHEET No.:
Drawings and specifications and other contract GROUND FLOOR PLAN
documents dully signed, stamped or sealed, as TYP. SECOND TO FOURTH FLOOR PLAN