Two-Way Slab Calculation
Two-Way Slab Calculation
5.683m
3.5m
I. Factored Loads
1
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
Table provided by the standard
αfm Minimum h, mm
Tabulated Results:
Slab Effective Moment of Inertia
Slab Width Slab Thickness Moment of Inertia
Edge Type
Side (mm) (mm) (mm4)
1 Continuous 3500 150 984375000
2 Continuous 5683 150 1598343750
3 Continuous 3500 150 984375000
4 Continuous 5683 150 1598343750
Calculation of α f
Slab For Beam For Slab
αf
Side Ecb Ib Ecs Is
1 21373 1812130376 21373 984375000 1.84
2 21373 1812130376 21373 1598343750 1.13
3 21373 1812130376 21373 984375000 1.84
4 21373 1812130376 21373 1598343750 1.13
αfm : 1.49
For panel with beams between supports on all sides, the equation given below shall be satisfied for
beams in the two perpendicular directions.
2
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
𝛼 𝑙
0.2 ≤ ≤ 5.0
𝛼 𝑙
Tabulated Results:
L
Direction αf αfL2 Ratio Status
(m)
Lx 5.683 2.27 73.23
1.62 OK!
Ly 3.5 3.68 45.10
Calculation of β
β is ratio of clear spans in long to short directions of slabs
Tabulated Results:
Slab Ln L2 qu Mo
Edge Type
Side (m) (m) (kPa) (KNm)
1 Continuous 5.383 3.5 9.16 116
2 Continuous 3.1 5.683 9.16 63
3 Continuous 5.383 3.5 9.16 116
4 Continuous 3.1 5.683 9.16 63
Tabulated Results:
3
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
Distribution Coefficients
Slab Mo Distribution Coefficients
Span Type
Side (KNm) End-i Mid End-j
1 Interior 116 0.65 0.35 0.65
2 Interior 63 0.65 0.35 0.65
3 Interior 116 0.65 0.35 0.65
4 Interior 63 0.65 0.35 0.65
Moment Diagrams:
41 kNm
22 kNm 22 kNm
41 kNm
Tabulated Results:
4
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
Portion of Interior Negative Mu in Column Strip
Slab
αf1 L2 L1 L2/L1 αf(L2 /L1) Coefficient
Side
1 1.13 3.5 5.68 0.62 1.13 0.87
2 1.84 5.683 3.50 1.62 1.84 0.56
3 1.13 3.5 5.68 0.62 1.13 0.87
4 1.84 5.683 3.50 1.62 1.84 0.56
5
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
Beams between supports shall resist the portion of column strip Mu in accordance with the following
table;
Table provided by the standard
Distribution
𝛼 𝑙 /𝑙
Coefficients
0 0
≥ 1.0 0.85
Tabulated Results:
Distribution of Column Strip Moments
Slab Coefficients
αf(L2 /L1)
Side Beam Slab
1 1.13 0.85 0.15
2 1.84 0.85 0.15
3 1.13 0.85 0.15
4 1.84 0.85 0.15
6
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
30 kNm
10 kNm 10 kNm
30 kNm
-3 kNm -3 kNm
-10 kNm -10 kNm
5 kNm
10 kNm
2 kNm 2 kNm
5
5 kNm
kNm
-18 kNm
-3 kNm -3 kNm
7
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
5.683m
Tributary Boundary
3.5m
Critical Section
Tabulated Results:
Shear force per meter width
qu Tributary b Vu
(KPa) Width (m) (m) (kN)
9.16 1.53 1 14.03
f'c b d φVc
φ
(MPa) (mm) (mm) (KN)
0.75 20.68 1000 112 64
8
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
-Table Continuation
As required AsTemp Use As SRequired Spacing Use S
Schedule
(mm 2) (mm 2) (mm 2 ) (mm) Limit (mm) (mm)
323 419 419 410 300 300 Ø12 @ 300
174 419 419 410 300 300 Ø12 @ 300
323 419 419 410 300 300 Ø12 @ 300
124 419 419 410 300 300 Ø12 @ 300
66 419 419 410 300 300 Ø12 @ 300
124 419 419 410 300 300 Ø12 @ 300
323 419 419 410 300 300 Ø12 @ 300
174 419 419 410 300 300 Ø12 @ 300
323 419 419 410 300 300 Ø12 @ 300
124 419 419 410 300 300 Ø12 @ 300
66 419 419 410 300 300 Ø12 @ 300
124 419 419 410 300 300 Ø12 @ 300
Schedule
Reinforcement Schedule
Strips LOC
End-i Mid End-j
TB Ø12 @ 300 - Ø12 @ 300
ColStrip (Side1)
BB - Ø12 @ 300 -
TB Ø12 @ 300 - Ø12 @ 300
ColStrip (Side2)
BB - Ø12 @ 300 -
TB Ø12 @ 300 - Ø12 @ 300
ColStrip (Side3)
BB - Ø12 @ 300 -
TB Ø12 @ 300 - Ø12 @ 300
ColStrip (Side4)
BB - Ø12 @ 300 -
TB Ø12 @ 300 - Ø12 @ 300
MidStrip (AlongX)
BB - Ø12 @ 300 -
TB Ø12 @ 300 - Ø12 @ 300
MidStrip (AlongY)
BB - Ø12 @ 300 -
9
Project Name: TWO STOREY RESIDENTIAL BLDG
Location: Las Pinas, Manila
Prepared by: Engr. Jake F. Cortez
Ø12@300
Ø12@300
Ø12@300
Ø12@300
Ø12@300
Ø12@300
Ø12@300 Ø12@300 Ø12@300
Ø12@300
Ø12@300
Ø12@300
Ø12@300 Ø12@300
10