0% found this document useful (0 votes)
35 views

Project Definition: Chemical Engineering - Industrial Project Management

1. The project involves producing vitamin C lozenges to help maintain immunity during the COVID-19 pandemic and address climate change health impacts. 2. The lozenges will be marketed across Java with a target of over 80% sales in the first year, and use sustainable packaging. 3. The estimated completion time is 18 months from starting in May 2021.

Uploaded by

desnia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views

Project Definition: Chemical Engineering - Industrial Project Management

1. The project involves producing vitamin C lozenges to help maintain immunity during the COVID-19 pandemic and address climate change health impacts. 2. The lozenges will be marketed across Java with a target of over 80% sales in the first year, and use sustainable packaging. 3. The estimated completion time is 18 months from starting in May 2021.

Uploaded by

desnia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT DEFINITION

1. Desnia Amanda Dewi (102318049)


2. Farhanzha Arsyiatama R. (102318056)
Group: 18 Project Team Member:
3. Firman Teguh Santosa (102318065)
4. Diena Tsabita (102318069)
Project Name : Production of Lozenges Vitamin C
Opportunity: Even though the Covid-19 pandemic has not ended, in this new normal
era, people are required to do outdoor activities, so there is a need for people
to have good body immunity. Based on these circumstances, we realized that
there was an opportunity to running a Vitamin C Tablet Production Project,
to maintain body immunity, while people having to do outdoor activities
during the Covid-19 pandemic.
Moreover, the increasing public awareness of the massive climate change
that occurs, which indirectly affects human health (Tian, 2020). The global
environmental organization Greenpeace states that particulate matter (PM)
contained in greenhouse gas emissions can cause early death as well as some
non-generative diseases. Greenpeace noted that there are groups that are
vulnerable to PM attacks, there are children, pregnant women, and the
elderly. Therefore, efforts to strengthen the body's immune system are very
important to do. One of the efforts to maintain and increase endurance is by
taking supplements with vitamin C content (Takisawa, 2019). With the
conditions described above, it is known that the project for the production of
vitamin C lozenges has a big opportunity.
Project Description: In this project, we produce vitamin C products in the form of lozenges.
Lozenges are considered more practical than liquid preparations or in other
forms. This project aims to have a sales target in the first year of > 80% of
total production, with a high level of public interest in the importance to
maintain body immunity by consuming vitamin C. Marketing is carried out
throughout the island of Java, with a target market for all ages.
There are developing stakeholders and sponsor relationship management
that are carried out during the project, this is done to retain existing investors
and attract other investors to invest in the projects we are doing. Also, the
development of vitamin C lozenges product packaging is carried out, by
using organic materials, the packaging is designed to be properly degraded, to
maintain environmental sustainability.
Project Start Date: May, 1st 2021
Estimated Completion: +/- 18 Months

Chemical Engineering – Industrial Project Management


Goal: • Sales success above 80% of total production.
• High public interest in the importance of maintaining body immunity by
consuming vitamin C.
• The rapid increase in trade due to the large number of investors investing in
this project, as well as the development given to products that lead to
environmental sustainability, so that public interest will be even greater.
Assumptions: • Suppliers of raw materials are well controlled to reach quality standards.
• The public is aware that by consuming vitamin C, the immune system will
be maintained and increased.
Constraints: • Society has a dynamic nature depending on the factors that influence it.
• Firm competition is quite tight because it produces similar products.
Deliverables: • There is product marketing in collaboration with community services, so
that the vitamin C lozenges produced are known and extended to the public
and the sales target can be achieved.
• Build good communication with all team members that involved in this
project, by setting expectations for the project on the first day of the project
start between stakeholders and the team involved. And build a strong team
culture.
• Held regular meetings and regular reports to make it easier for the team to
recap the results of activities to achieve success in the production of lozenges
vitamin C.
• There is a clinical trial before the product is distributed to the public so that
vitamin C lozenges are safe for consumption.

Chemical Engineering – Industrial Project Management

You might also like