Test Report For Feeder Protection Relay

The document provides a test report for a feeder protection relay at a 50MW solar power project in Haryana, India. Key tests performed include: 1) General inspection and testing of installation, wiring, relay outputs and visual inspection. 2) Measurement of current and voltage values displayed on the relay during injection tests. 3) Overcurrent protection testing, with pickup and trip times measured. 4) Earth fault protection testing, with pickup and trip times measured. 5) Undervoltage protection testing, with pickup and trip times measured. All test results were found to be normal.

Uploaded by

Hari haran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
223 views

Test Report For Feeder Protection Relay

The document provides a test report for a feeder protection relay at a 50MW solar power project in Haryana, India. Key tests performed include: 1) General inspection and testing of installation, wiring, relay outputs and visual inspection. 2) Measurement of current and voltage values displayed on the relay during injection tests. 3) Overcurrent protection testing, with pickup and trip times measured. 4) Earth fault protection testing, with pickup and trip times measured. 5) Undervoltage protection testing, with pickup and trip times measured. All test results were found to be normal.

Uploaded by

Hari haran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Pre-Commissioning Test Report

Client AVAADA GREEN H.N PROJECT PVT.LTD 


Project 50 MW MITHI SURERA(SIRSA) SOLAR POWER PROJECT AT HARYANA 
Contractor TECHNO 
Testing
Team  EUREKA ENTERPRISES

Date: 01-10-2021

TEST REPORT FOR FEEDER PROTECTION RELAY


Location : 50MW AVAADA SIRSA
Switchgear Name : 33 KV SS
Feeder Name : INCOMER-03
Designation : Feeder Protection Relay

1.Relay Details:
Make ABB Type REF615
Model HBFFAEAGNBA1BNA11 Sr 1VYV91362899
G
CTR 300/1 A PTR 33000/110 V

2. GENERAL INSPECTION & TESTING:-


SL.NO General Inspection & Testing REMARKS
1 Installation & Wiring Correct To Relevant Drawings OK
2 Relay Case Connected To Local Earth Bar OK
3 Relay Output Checked OK
4 Visual Inspection Of Unit OK

3. Measured Value Test:-


Inject current in the relay as per the table below. Observe the reading on the relay display,
in primary values.

Ct ratio – 300/1 A, Pt ratio – 33000/110 V


Primary Current Displayed on Relay (A)
Phase Current Injected (A)
IL1 IL2 IL3 IN
R-N 1 300 0A 0A 300
Y-N 1 0A 300 0A 300
B-N 1 0A 0A 300 300
RYB 1 300 300 300 0A

Primary Voltage Displayed on Relay (kV)


Phase Voltage Injected (V)
L1-L2 L2-L3 L3-L1
R-Y 110 32.974 0 0
Y-B 110 0 32.979 0
B-R 110 0 0 32.979

Details Tested By: Witnessed By: Witnessed By:


NAME Hariharan J M.Manik  Pankaj Mandal 
SIGNATURE      
DATE 01-10-2021    
(Testing) AVAADA (Testing) AVAADA (Quality)
Pre-Commissioning Test Report
Client AVAADA GREEN H.N PROJECT PVT.LTD 
Project 50 MW MITHI SURERA(SIRSA) SOLAR POWER PROJECT AT HARYANA 
Contractor TECHNO 
Testing
Team  EUREKA ENTERPRISES

Date: 01-10-2021

4. Overcurrent Protection 51/50 :-

DPHLPDOC1:1
Ip> 0.78 A, IEC Normal Inverse, TMS – 0.07

Operating Time in (sec)


Pick up in (Amps)
2 times 5 times 10 times
Phase
Expected Actual Expected Actual Expected Actual Expected Actual
(A) (A) (sec) (sec) (sec) (sec) (sec) (sec)

R 0.78 0.79 0.710 0.306 0.221


Y 0.78 0.79 0.713 0.304 0.216
0.702 0.300 0.208
B 0.78 0.79 0.716 0.306 0.227
RYB 0.78 0.79 0.712 0.302 0.228

PHIPTOC1:1
I> 2.5 A, Time Delay – 0.150 Sec.
Phase I Pickup (A) Expected Trip Time (sec) Actual Trip Time (sec)
R 2.51 0.150 0.157
Y 2.51 0.150 0.153
B 2.51 0.150 0.163
RYB 2.51 0.150 0.154

5. Earthfault Protection 51N/50N :-

DEFLPDEF1:1
Ie>- 0.2 In, IEC Normal Inverse, TMS – 0.10
Operating Time in (sec)
Pick up in (Amps)
2 times 5 times 10 times
Reference
Expected Actual Expected Actual Expected Actual Expected Actual
(A) (A) (sec) (sec) (sec) (sec) (sec) (sec)

N 0.2 0.22 1.003 1.018 0.428 0.433 0.297 0.312

EFHPTOC1:1
Details Tested By: Witnessed By: Witnessed By:
NAME Hariharan J M.Manik  Pankaj Mandal 
SIGNATURE      
DATE 01-10-2021    
(Testing) AVAADA (Testing) AVAADA (Quality)
Pre-Commissioning Test Report
Client AVAADA GREEN H.N PROJECT PVT.LTD 
Project 50 MW MITHI SURERA(SIRSA) SOLAR POWER PROJECT AT HARYANA 
Contractor TECHNO 
Testing
Team  EUREKA ENTERPRISES

Date: 01-10-2021

Ie>> 0.4 A, Time Delay – 0.160 Sec.


Reference I Pickup (A) Expected Trip Time (sec) Actual Trip Time (sec)
Neutral 0.41 0.160 0.179

6. Undervoltage Protection (27) :-

U<27.5 V, Time Delay – 5.00 Sec.


Phase U Pickup (V) Expected Trip Time (sec) Actual Trip Time (sec)
RY 27.4 5.000 5.021
YB 27.4 5.000 5.025
BR 27.4 5.000 5.024
RYB 27.4 5.000 5.023

7. Remarks : Above test results were found normal.

Note: Reference standard for field testing of Electrical Relays & Current transformer : IS9124 -1979.

Details Tested By: Witnessed By: Witnessed By:


NAME Hariharan J M.Manik  Pankaj Mandal 
SIGNATURE      
DATE 01-10-2021    
(Testing) AVAADA (Testing) AVAADA (Quality)