0% found this document useful (0 votes)
63 views

Masterlist of Works: Main Canal

This document provides a masterlist of works for the rehabilitation and improvement of the Lambayong River Irrigation System in the Philippines. It includes details of the project such as the contract information, completion date, and project amount. The masterlist then provides information on various items of work completed to date, including quantities, units, costs, and percentages of work accomplished for items like temporary works, clearing and grubbing, concrete canal works, and embankment works.

Uploaded by

Chard Honey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views

Masterlist of Works: Main Canal

This document provides a masterlist of works for the rehabilitation and improvement of the Lambayong River Irrigation System in the Philippines. It includes details of the project such as the contract information, completion date, and project amount. The masterlist then provides information on various items of work completed to date, including quantities, units, costs, and percentages of work accomplished for items like temporary works, clearing and grubbing, concrete canal works, and embankment works.

Uploaded by

Chard Honey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 50

MASTERLIST OF WORKS

MAIN CANAL
Reinforce Steel Bars,
Concrete Canal
Clearing & All Sizes (Furnished,
STATIONING LENGTH Lining, Class 'B", Embankment REMARKS
Grubbing Stockpile, Cut &
170 kscm (cu.m)
Bend)

FROM TO
m cu.m cu.m
4+833.29 5+474.17 640.88 769.06 EMBANKMENT ON SIDE B/S
5+483.29 6+191.34 708.05 849.66 EMBANKMENT ON SIDE B/S
6+200.87 6+301.57 100.70 120.84 EMBANKMENT ON SIDE B/S
6+301.51 6+400.76 99.25 119.10 41.69 1931.3448 PROPOSED L-SHAPE RETAINING WALL 50 CM W/ EMBANKMENT ON SIDE
6+900.42 8+038.80 1138.38 1366.06 EMBANKMENT ON SIDE B/S
7+267.60 7+447.30 179.70 215.64 25.34 778.96896 PROPOSED WALL RAISING 40 CM W/ EMBANKMENT ON SIDE
7+447.30 7+724.40 277.10 332.52 EMBANKMENT ON SIDE B/S
7+724.40 8+038.80 314.40 377.28 44.33 1304.54016 PROPOSED WALL RAISING 40 CM W/ EMBANKMENT ON SIDE
8+024.39 8+033.89 9.50 11.40 1.14 CANAL RESTORATION (not yet started)
8+038.80 8+288.80 250.00 300.00 35.25 1086.32512 RESTORATION OF CHIPPED CANAL WALL BOTH SIDE
8+400.00 8+812.47 412.47 494.96 58.16 1436.10544 EXISTING
8+718.00 9+239.69 520.00 624.00 73.32 TO BE STARTED
9+239.69 9+269.69 30.00 36.00
9+2798.66 9+437.56 157.90 189.48
9+437.56 9+519.00 81.44 97.73 34.20 8.1312 PROPOSED L-SHAPE RETAINING WALL 50 CM W/ EMBANKMENT ON SIDE
9+519.00 9+881.18 362.18 434.62 51.07
9+539.23 9+550.23 11.00 13.20 8.25 407.5456 WHOLE CANAL RESTORATION
9+550.23 9+559.23 9.00 10.80 6.75 186.7096 WHOLE CANAL RESTORATION
9+900.99 10+355.59 454.60 545.52
10+355.59 10+653.99 298.39 358.07
10+653.99 10+919.12 265.14 318.17
10+919.12 11+114.91 195.79 234.95
10+929.46 11+167.81 238.36 286.03
11+114.91 11+127.41 12.50 15.00
11+127.41 11+167.81 40.40 48.48
11+206.01 11+611.11 405.10 486.12
11+611.11 11+626.11 15.00 18.00
11+626.11 11+641.11 15.00 18.00
TOTAL 8,690.68 379.49 7,139.67
LATERAL D

Reinforce Steel Bars,


Concrete Canal
All Sizes (Furnished,
STATIONING LENGTH Lining, Class 'B", Embankment REMARKS
Stockpile, Cut &
170 kscm (cu.m)
Bend)

0+102 0+205 103 123.60 6.95 PLEASE VERIFY ON ACTUAL


0+361.32 0+366.52 5.2 6.24 0.35
0+406.30 4+433.30 27 32.40 25.52
0+433.3 1+050.64 617.34 740.81 50.93 PLEASE VERIFY ON ACTUAL
4+306.98 4+325 23.00 27.60 15.35 PLEASE VERIFY ON ACTUAL
2+796.96 2+806 10 12.00 11.10 DEMOLISHED AND REPLACED
2+813.96 2+823.96 10 12.00 11.10 DEMOLISHED AND REPLACED

TOTAL 954.65 121.30

LATERAL E

Reinforce Steel Bars,


Concrete Canal
All Sizes (Furnished,
STATIONING LENGTH Lining, Class 'B", Embankment REMARKS
Stockpile, Cut &
170 kscm (cu.m)
Bend)

0+226 0+266 40.00 48.00 22.80 PLEASE VERIFY ON ACTUAL


0+441 0+448.5 7.50 9.00 4.28 PLEASE VERIFY ON ACTUAL
1+918.56 2+074.56 156.00 187.20 72.54 PLEASE VERIFY ON ACTUAL
1+460 1+582.70 122.70 147.24 57.06 PLEASE VERIFY ON ACTUAL
2+184.54 2+284.54 200.00 73.50
2+434.5 2+544.5 110.00 40.43
TOTAL 391.44 270.60 -
GRAND TOTAL 10,036.76 771.39 7,139.67
Republika ng Pilipinas
National Irrigation Administration
(Pambansang Pangasiwaan ng Patubig)
SULTAN KUDARAT IRRIGATION MANAGEMENT OFFICE
Isulan, Sultan Kudarat

Contract I.D Number : NISRIPD-13A-2R


Name of Project : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
Name of Contractor : LEGACY CONSTRUCTION CORPORATION
Date NTP : MAY 25, 2020
Completion Date : DECEMBER 25, 2020
Project Amount : Php 39,701,253.86
ACCOMPLISHMENT AS OF DECEMBER 25, 2020.
VALUE OF WORK PERCENTAGE PER WT. %
ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST PREVIOUS THIS PERIOD TO DATE ACCOMPLISHMENT
ITEM ACCOMP.
TO DATE

101 Temporary Works, Construction Plant, Mobilization of 1.00 l.s 1,095,398.37 1,095,398.37 0.5 0.00 0.5 547,699.19 50% 1.38%
construction Equipment & Demobilization work 0.00 -
- 0.00 -
102 Clearing and Grubbing 15,928.23 sq.m. 13.19 210,093.35 3,773.39 - 3,773.39 49,771.07 24% 0.13%
- 0.00 -
- 0.00 -
- 0.00 -
103 Canal Excavation (Common) 346.98 cu.m. 89.02 30,888.16 294.933 0.00 294.93 26,254.94 85% 0.07%
- 0.00 -
104 Structure Excavation (Common) 1,468.01 cu.m. 185.86 272,844.34 586.1107 38.85 624.96 116,155.20 43% 0.29%
- 0.00 -
105 Overhaul (Disposal of Waste Materials, AHD = 2.00 km) 1,016.86 cu.m. 232.13 236,043.71 434.163 0.00 434.16 100,782.26 43% 0.25%
- 0.00 -
106 Structure Backfill 2,632.41 cu.m. 128.41 338,027.77 0.00 -
- 0.00 -
107 1) Embankment Construction & Compaction 8,320.65 cu.m. 394.65 3,283,744.52 0.00 -
a) From Haul Borrow (AHD=13.00km) 5,824.46 cu.m. - 0.00 -
b) From Canal Excavation (AHD=1.00km) 2,496.20 cu.m. - 0.00 -
- 0.00 -
2) Diversion and Care of River (Cofferdam) 261.45 cu.m. 543.80 142,176.51 0.00 -
- 0.00 -
108 Concrete Demolition 722.44 cu.m. 323.33 233,586.53 376.008 0.00 376.01 121,574.67 52% 0.31%
-
109 Concrete Structures -
-
a) Class "A", 210 kscm 304.82 cu.m. 9,572.71 2,917,953.46 33.7885 15.97 47.10 450,893.79 15% 1.14%
1. Main Canal 57.79 cu.m. - 0 -
2. Lateral D 22.82 cu.m. - 0 -
3. Lateral D2 11.78 cu.m. - 0 -
4. Lateral E 65.74 cu.m. - 0 -
5. Baldonado Check and Weir 80.18 cu.m. 0 -
6. Garma Check and Weir 0.19 cu.m. - 0 -
7. Lemana Check and Weir 44.99 cu.m. - 0 -
8. Ramboyon Check and Weir 5.36 cu.m. - 0 -
9. Tugade Check and Weir 15.97 cu.m. - 0 -
- 0 -
b) Concrete Blocks, Class"B", 170 kscm 67.99 cu.m. 7,603.31 516,949.05 0 -
1. Baldonado Check and Weir 20.60 cu.m. - 0 -
2. Ramboyon Check and Weir 20.60 cu.m. - 0 -
3. Tugade Check and Weir 26.79 cu.m. - 0 -
- 0 -
c) Lean Concrete, 70 kscm 1.63 cu.m. 5,504.89 8,972.97 0 -
1. Tugade Check and Weir 1.63 cu.m. - 0 -
- 0 -
d) Staff Gages, (Reinforced Concrete Vertical Post Type) 16.00 pcs. 2,278.79 36,460.64 0 -
1. Main Canal 7.00 pcs. - 0 -
2. Lateral D 6.00 pcs. - 0 -
3. Lateral D2 1.00 pcs. - 0 -
4. Lateral E 1.00 pcs. - 0 -
5. Lateral F 1.00 pcs. - 0 -
0 -
110 Concrete Canal Lining, Class "B", 170 kscm 1,300.41 cu.m. 7,805.07 10,149,791.08 305.46464 0.00 305.46 2,384,172.90 23% 6.01%
1. Main Canal 619.73 cu.m. - 0 -
2. Lateral D 218.40 cu.m. - 0 -
3. Lateral D2 10.15 cu.m. - 0 -
4. Lateral E 452.13 cu.m. - 0 -
- 0 -
111 Reinforcing Steel Bars, All sizes - 0 -
a) Furnish, Stockpile, Cut & Bend 99,277.77 kgs 81.67 8,108,015.48 23,383.68 1,557.90 24,941.58 2,036,978.47 25% 5.13%
1. Main Canal 49,618.20 kgs - 0 -
2. Lateral D 18,012.10 kgs - 0 -
3. Lateral D2 1,097.71 kgs - 0 -
4. Lateral E 22,088.55 kgs - 0 -
5. Baldonado Check and Weir 4,810.10 kgs - 0 -
6. Garma Check and Weir 15.45 kgs - 0 -
7. Lemana Check and Weir 2,249.28 kgs - 0 -
8. Ramboyon Check and Weir 428.48 kgs - 0 -
9. Tugade Check and Weir 957.90 kgs - 0 -
- 0 -
112 Road Surfacing Materials 1,260.00 cu.m. 1,365.45 1,720,467.00 0 -
1. Main Canal 1,260.00 cu.m. - 0 -
- 0 -
113 Gravel Blanket (Bedding) 491.61 cu.m. 2,174.19 1,068,853.55 58.51 6.45 64.96 141,230.90 13% 0.36%
1. Main Canal 242.09 cu.m. - 0 - 0.00%
2. Lateral D 25.09 cu.m. - 0 - 0.00%
3. Lateral D2 6.23 cu.m. - 0 - 0.00%
4. Lateral E 170.95 cu.m. - 0 - 0.00%
5. Baldonado Check and Weir 27.30 cu.m. - 0 - 0.00%
6. Ramboyon Check and Weir 6.30 cu.m. - 0 - 0.00%
7. Tugade Check and Weir 13.65 cu.m. - 0 - 0.00%
- 0 - 0.00%
114 Filter Cloth (Geotextile) 67.01 sq.m. 411.44 27,570.59 0 - 0% 0.00%
1. Baldonado Check and Weir 20.62 sq.m. - 0 - 0.00%
2. Ramboyon Check and Weir 20.62 sq.m. - 0 - 0.00%
3. Tugade Check and Weir 25.77 sq.m. - 0 - 0.00%
- 0 - 0.00%
115 Filter Drain w/ 50mm dia. PVC Pipe 18.54 cu.m. 2,158.88 40,025.64 0 - 0% 0.00%
1. Baldonado Check and Weir 7.21 cu.m. - 0 - 0.00%
2. Ramboyon Check and Weir 6.18 cu.m. - 0 - 0.00%
3. Tugade Check and Weir 5.15 cu.m. - 0 - 0.00%
- 0 - 0.00%
116 Rubble Masonry 12.96 cu.m. 5,126.15 66,434.90 0 - 0% 0.00%
1. Tugade Check and Weir 12.96 cu.m. - 0 - 0.00%
- 0 - 0.00%
- 0 - 0.00%
117 Boulder Riprap - cu.m. - 0 - 0.00%
- 0 - 0.00%
118 Grouted Riprap 192.56 cu.m. 4,247.45 817,888.97 0 - 0% 0.00%
1. Lateral E 2.01 cu.m. - 0 - 0.00%
2. Baldonado Check and Weir 62.83 cu.m. - 0 - 0.00%
3. Ramboyon Check and Weir 67.98 cu.m. - 0 - 0.00%
4. Tugade Check and Weir 59.74 cu.m. - 0 - 0.00%
- 0 - 0.00%
119 Reinforced Concrete Pipes - 0 - 0.00%
a) Furnish & Install R.C. Pipes - 0 - 0.00%
1. 30 cm dia x 1.00m - lin.m - 0 - 0.00%
- 0 - 0.00%
2. 46 cm dia x 1.00m 31.00 lin.m. 2,868.76 88,931.56 0 - 0% 0.00%
- 0 - 0.00%
3. 61 cm dia x 1.00m 10.00 lin.m 3,748.77 37,487.70 0 - 0% 0.00%
- 0 - 0.00%
4. 76 cm dia x 1.00m 4.00 lin.m. 5,955.59 23,822.36 0 - 0% 0.00%
- 0 - 0.00%
5. 91 cm dia x 1.00m - lin.m. - 0 - 0.00%
- 0 - 0.00%
119 b) Removal & Disposal of existing R.C. Pipes - 0 - 0.00%
1. 46 cm dia x 1.00m - lin.m. - 0 - 0.00%
- 0 - 0.00%
2. 61 cm dia x 1.00m - lin.m. - 0 - 0.00%
- 0 - 0.00%
118 Miscellaneous Works & Materials - 0 - 0.00%
a) G.I. Pipe Railing, 50mm dia. 250.00 lin.m. 648.91 162,227.50 0 - 0% 0.00%
- 0 - 0.00%
b) G.I. Pipe For Elevated Flume, 300mm dia. - lin.m. - 0 - 0.00%
- 0 - 0.00%
c) Joint Sealant (Bituminus Type-Asphalt Sealant) 114.00 liters 247.83 28,252.62 0 - 0% 0.00%
d) PVC Pipe, 150mm dia. 12.00 lin.m. 613.59 7,363.08 0 - 0% 0.00%
0.00%
- 0 - 0.00%
119 Steel Gate and Lifting Mechanism - 0 - 0.00%
(Refer to Approved Drawing) - 0 - 0.00%
Supply, Delivery, Installation and Commissioning of New Steel - 0 - 0.00%
Gate, hoisting/lifting mechanism, and/or repair/improvement - 0 - 0.00%
w/ accessories including dismantle & disposal to NIA stockyard - 0 - 0.00%
- 0 - 0.00%
I. CHECK GATES - 0 - 0.00%
1. Garma Checkgate - 0 - 0.00%
a. Provide steel gate, Ws 1400mm x Hs 1400mm HB-762 1.00 assy 205,524.00 205,524.00 0.7 0 0.70 143,866.80 70% 0.36%
- 0 0 - - 0.00%
b. Provide steel gate, Ws 600mm x Hs 600mm HB-762 1.00 assy 78,185.25 78,185.25 0.7 0 0.70 54,729.68 70% 0.14%
- 0 - 0.00%
- 0 - 0.00%
2. Baldonado Checkgate - 0 - 0.00%
a. Provide steel gate, Ws 1000mm x Hs 1500mm HB-762 1.00 assy 162,409.50 162,409.50 0 - 0% 0.00%
- 0 - 0.00%
b. Provide steel gate, Ws 500mm x Hs 500mm HB-762 2.00 assy 44,550.00 89,100.00 0 - 0% 0.00%
- 0 - 0.00%
- 0 - 0.00%
3. Tugade Checkgate - 0 - 0.00%
a. Provide steel gate, Ws 750mm x Hs 1700mm HB-762 1.00 assy 180,675.00 180,675.00 0.7 0 0.70 126,472.50 70% 0.32%
- 0 0 - - 0.00%
b. Provide steel gate, Ws 600mm x Hs 600mm HB-762 1.00 assy 75,561.75 75,561.75 0.7 0 0.70 52,893.23 70% 0.13%
- 0 - 0.00%
119 4. Lemana Checkgate - 0 - 0.00%
a. Provide steel gate, Ws 1200mm x Hs 1700mm HB-762 1.00 assy 257,313.38 257,313.38 0.7 0 0.70 180,119.37 70% 0.45%
- 0 0 - - 0.00%
b. Provide steel gate, Ws 1500mm x Hs 2000mm HB-762 1.00 assy 310,711.50 310,711.50 0.7 0 0.70 217,498.05 70% 0.55%
- 0 0 - - 0.00%
c. Provide steel gate, Ws 600mm x Hs 600mm HB-762 1.00 assy 79,348.50 79,348.50 0.7 0 0.70 55,543.95 70% 0.14%
- 0 0 - - 0.00%
- 0 0 - - 0.00%
5. Lateral F Drainage Checkgate - 0 0 - - 0.00%
a. Provide steel gate, Ws 850mm x Hs 900mm HB-762 1.00 assy 119,319.75 119,319.75 0.7 0 0.70 83,523.83 70% 0.21%
- 0 0 - - 0.00%
b. Provide steel gate, Ws 500mm x Hs 500mm HB-762 1.00 assy 48,411.00 48,411.00 0.7 0 0.70 33,887.70 70% 0.09%
- 0 0 - - 0.00%
- 0 0 - - 0.00%
6. Ramboyon Checkgate - 0 0 - - 0.00%
a. Provide steel gate, Ws 1200mm x Hs 2450mm CP-12 2.00 assy 328,952.25 657,904.50 1.4 0 1.40 460,533.15 70% 1.16%
- 0 0 - - 0.00%
b. Provide steel gate, Ws 1250mm x Hs 900mm HB-762 1.00 assy 137,338.48 137,338.48 0.7 0 0.70 96,136.94 70% 0.24%
- 0 -
- 0
II. CANAL GATES - 0 -
1. Canal Structures - 0 -
1. Provide steel gate, Ws 700 mm x Hs 700 mm HB-762 1.00 assy 84,362.75 84,362.75 0 - 0%
- 0 -
- 0 -
2. Provide steel gate, Ws 950 mm x Hs 950 mm HB-762 1.00 assy 126,512.00 126,512.00 0 - 0%
- 0 -
- 0 -
3. Provide steel gate, Ws 1050 mm x Hs 1000 mm HB-762 2.00 assy 125,200.25 250,400.50 0 - 0%
- 0 -
- 0 -
4. Provide steel gate, Ws 1100 mm x Hs 1000 mm HB-762 1.00 assy 163,488.50 163,488.50 0 - 0%
- 0 -
119 5. Provide steel gate, Ws 1450 mm x Hs 1200 mm HB-762 2.00 assy 149,170.63 298,341.26 1.4 0 1.40 208,838.88 70% 0.53%
- 0 -
- 0 -
6. Provide steel gate, Ws 1150 mm x Hs 1150 mm HB-762 1.00 assy 122,651.00 122,651.00 0 - 0%
- 0 -
- 0 -
7. Provide steel gate, Ws 1300 mm x Hs 1200 mm HB-762 1.00 assy 199,450.25 199,450.25 0 - 0%
- 0 -
- 0 -
8. Provide steel gate,Ws 1400 mm x Hs 1200 mm HB-762 5.00 assy 173,017.25 865,086.25 3.5 0 3.50 605,560.38 70% 1.53%
- 0 -
- 0 -
9. Provide steel gate,Ws 1500 mm x Hs 1300 mm HB-762 1.00 assy 232,070.75 232,070.75 0 - 0%
- 0 -
- 0 -
10. Provide steel gate,Ws 2150 mm x Hs 1100 mm HB-762 3.00 assy 269,806.25 809,418.75 3 0 3.00 809,418.75 100% 2.04%
- 0 -
- 0 -
11. Provide steel gate,Ws 1800 mm x Hs 800 mm HB-762 1.00 assy 180,962.00 180,962.00 0.7 0 0.70 126,673.40 70% 0.32%
- 0 -
- 0 -
12. Provide steel gate,Ws 1500 mm x Hs 600 mm HB-762 1.00 assy 89,238.50 89,238.50 0.7 0 0.70 62,466.95 70% 0.16%
- 0 -
- 0 -
13. Provide steel gate,Ws 2800 mm x Hs 2100 mm HB-762 1.00 assy 587,159.00 587,159.00 0.7 0 0.70 411,011.30 70% 1.04%
- 0 -
- 0 -
14. Provide steel gate,Ws 1400 mm x Hs 400 mm HB-762 1.00 assy 54,662.75 54,662.75 0.7 0 0.70 38,263.93 70% 0.10%
- 0 -
- 0 -
15. Provide steel gate,Ws 1500 mm x Hs 1600 mm HB-762 2.00 assy 240,287.75 480,575.50 1.4 0 1.40 336,402.85 70% 0.85%
- 0
119 III. TURNOUTS - 0 -
1. Provide gate,Ws 560 mm x Hs 560 mm HB-762 17.00 assy 34,881.68 592,988.56 3.06 0 3.06 106,737.94 18% 0.27%
- 0 - 0.00%
- 0 - 0.00%
2. Provide gate,Ws 600 mm x Hs 600 mm H-406 4.00 assy 40,691.38 162,765.52 2.4 0 2.40 97,659.31 60% 0.25%
- 0 - 0.00%
- 0 - 0.00%
3. Provide gate,Ws 800 mm x Hs 560 mm H-406 1.00 assy 50,257.25 50,257.25 0.7 0 0.70 35,180.08 70% 0.09%
- 0 - 0.00%
- 0 - 0.00%
4. Provide gate,Ws 560 mm x Hs 1600 mm H-406 1.00 assy 115,300.25 115,300.25 0.7 0 0.70 80,710.18 70% 0.20%
- 0 -
- 0 -
5. Provide gate,Ws 900 mm x Hs 1600 mm H-406 1.00 assy 163,488.50 163,488.50 0

-
TOTAL CONTRACT COST 39,701,253.86 10,399,642.48 26.19%

Prepared by: Conformed by: Checked by: Reviewed by: Submitted by:

RAHIB M. KAMAMA DAVID ASUNCION JASON T. GALUMO REYNALDO C. RODOLFO FLORA MAY D. RESPICIO
Engineer A Project Engineer Sr. Engineer A. NISRIP CMU Head, Engineering section Division Manager A
Legacy Construction Corporation
Republika ng Pilipinas
National Irrigation Administration
(Pambansang Pangasiwaan ng Patubig)
SULTAN KUDARAT IRRIGATION MANAGEMENT OFFICE
Isulan, Sultan Kudarat
31250
Contract I.D Number : NISRIPD-13A-2R
Name of Project : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
Name of Contractor : LEGACY CONSTRUCTION CORPORATION
Date NTP : MAY 25, 2020
Completion Date : DECEMBER 25, 2020
Project Amount : Php 39,701,253.86
ACCOMPLISHMENT AS OF DECEMBER 25, 2020.
VALUE OF WORK PERCENTAGE PER WT. %
ITEM NO. DESCRIPTION QTY. UNIT UNIT COST TOTAL COST PREVIOUS THIS PERIOD TO DATE ACCOMPLISHMENT ITEM ACCOMP.
TO DATE

101 Temporary Works, Construction Plant, Mobilization of 1.00 l.s 1,095,398.37 1,095,398.37 1.00 1.00 1,095,398.37 100% 2.76%
construction Equipment & Demobilization work

102 Clearing and Grubbing 15,928.23 sq.m. 13.19 210,093.35 10,036.76 10,036.76 132,384.92 63% 0.33%

103 Canal Excavation (Common) 346.98 cu.m. 89.02 30,888.16 0%

104 Structure Excavation (Common) 1,468.01 cu.m. 185.86 272,844.34 0%

105 Overhaul (Disposal of Waste Materials, AHD = 2.00 km) 1,016.86 cu.m. 232.13 236,043.71 - - 0%
- - -
106 Structure Backfill 2,632.41 cu.m. 128.41 338,027.77 - - 0%
- - -
107 1) Embankment Construction & Compaction 8,320.65 cu.m. 394.65 3,283,744.52 - - 0%
a) From Haul Borrow (AHD=13.00km) 5,824.46 cu.m. - - -
b) From Canal Excavation (AHD=1.00km) 2,496.20 cu.m. - - -
- - -
2) Diversion and Care of River (Cofferdam) 261.45 cu.m. 543.80 142,176.51 - - 0%
- - -
108 Concrete Demolition 722.44 cu.m. 323.33 233,586.53 - - 0%
- -
109 Concrete Structures - -
a) Class "A", 210 kscm 304.82 cu.m. 9,572.71 2,917,953.46 60.96 583,552.40 20.00% 1.47%
1. Main Canal 57.79 cu.m. - - -
2. Lateral D 22.82 cu.m. - - -
3. Lateral D2 11.78 cu.m. - - -
4. Lateral E 65.74 cu.m. - - -
5. Baldonado Check and Weir 80.18 cu.m. - -
6. Garma Check and Weir 0.19 cu.m. - - -
7. Lemana Check and Weir 44.99 cu.m. - 44.99 44.99 -
8. Ramboyon Check and Weir 5.36 cu.m. - - -
9. Tugade Check and Weir 15.97 cu.m. - 15.97 15.97 -
- - -
b) Concrete Blocks, Class"B", 170 kscm 67.99 cu.m. 7,603.31 516,949.05 - - 0%
1. Baldonado Check and Weir 20.60 cu.m. - - -
2. Ramboyon Check and Weir 20.60 cu.m. - - -
3. Tugade Check and Weir 26.79 cu.m. - - -
- - -
c) Lean Concrete, 70 kscm 1.63 cu.m. 5,504.89 8,972.97 1.63 1.63 8,972.97 100.00% 0.02%
1. Tugade Check and Weir 1.63 cu.m. - - -
- - -
d) Staff Gages, (Reinforced Concrete Vertical Post Type) 16.00 pcs. 2,278.79 36,460.64 - - 0%
1. Main Canal 7.00 pcs. - - -
2. Lateral D 6.00 pcs. - - -
3. Lateral D2 1.00 pcs. - - -
4. Lateral E 1.00 pcs. - - -
5. Lateral F 1.00 pcs. - - -
- -
110 Concrete Canal Lining, Class "B", 170 kscm 1,300.41 cu.m. 7,805.07 10,149,791.08 1,111.97 8,679,020.86 85.51% 21.86%
1. Main Canal 619.73 cu.m. - 381.82 381.82 -
2. Lateral D 218.40 cu.m. - 300.52 300.52 -
3. Lateral D2 10.15 cu.m. - - -
4. Lateral E 452.13 cu.m. - 429.63 429.63 -
- - -
111 Reinforcing Steel Bars, All sizes - - -
a) Furnish, Stockpile, Cut & Bend 99,277.77 kgs 81.67 8,108,015.48 15,912.63 1,299,584.46 16.03% 3.27%
1. Main Canal 49,618.20 kgs - 12,705.45 12,705.45 -
2. Lateral D 18,012.10 kgs - - -
3. Lateral D2 1,097.71 kgs - - -
4. Lateral E 22,088.55 kgs - - -
5. Baldonado Check and Weir 4,810.10 kgs - - -
6. Garma Check and Weir 15.45 kgs - - -
7. Lemana Check and Weir 2,249.28 kgs - 2,249.28 2,249.28 -
8. Ramboyon Check and Weir 428.48 kgs - - -
9. Tugade Check and Weir 957.90 kgs - 957.90 957.90 -
- - -
112 Road Surfacing Materials 1,260.00 cu.m. 1,365.45 1,720,467.00 1,260.00 1,260.00 1,720,467.00 100.00% 4.33%
1. Main Canal 1,260.00 cu.m. - - -
- - -
113 Gravel Blanket (Bedding) 491.61 cu.m. 2,174.19 1,068,853.55 13.65 13.65 29,677.69 2.78% 0.07%
1. Main Canal 242.09 cu.m. - -
2. Lateral D 25.09 cu.m. - -
3. Lateral D2 6.23 cu.m. - -
4. Lateral E 170.95 cu.m. - -
5. Baldonado Check and Weir 27.30 cu.m. - -
6. Ramboyon Check and Weir 6.30 cu.m. - -
7. Tugade Check and Weir 13.65 cu.m. - 13.65 13.65
- -
114 Filter Cloth (Geotextile) 67.01 sq.m. 411.44 27,570.59 25.77 25.77 10,602.81 38.46% 0.03%
1. Baldonado Check and Weir 20.62 sq.m. - - -
2. Ramboyon Check and Weir 20.62 sq.m. - - -
3. Tugade Check and Weir 25.77 sq.m. - 25.77 25.77 -
- - -
115 Filter Drain w/ 50mm dia. PVC Pipe 18.54 cu.m. 2,158.88 40,025.64 5.15 5.15 11,118.23 27.78% 0.03%
1. Baldonado Check and Weir 7.21 cu.m. - - -
2. Ramboyon Check and Weir 6.18 cu.m. - - -
3. Tugade Check and Weir 5.15 cu.m. - 5.15 5.15 -
- - -
116 Rubble Masonry 12.96 cu.m. 5,126.15 66,434.90 12.96 12.96 66,434.90 100.00% 0.17%
1. Tugade Check and Weir 12.96 cu.m. - 12.96 12.96 -
- - -
- - -
117 Boulder Riprap - cu.m. - - -
- - -
118 Grouted Riprap 192.56 cu.m. 4,247.45 817,888.97 59.74 59.74 253,742.66 31.02% 0.64%
1. Lateral E 2.01 cu.m. - - -
2. Baldonado Check and Weir 62.83 cu.m. - - -
3. Ramboyon Check and Weir 67.98 cu.m. - - -
4. Tugade Check and Weir 59.74 cu.m. - 59.74 59.74 -
- - -
119 Reinforced Concrete Pipes - - -
a) Furnish & Install R.C. Pipes - - -
1. 30 cm dia x 1.00m - lin.m - - -
- - -
2. 46 cm dia x 1.00m 31.00 lin.m. 2,868.76 88,931.56 - - 0.00%
- - -
3. 61 cm dia x 1.00m 10.00 lin.m 3,748.77 37,487.70 - - 0.00%
- - -
4. 76 cm dia x 1.00m 4.00 lin.m. 5,955.59 23,822.36 - - 0.00%
- -
5. 91 cm dia x 1.00m - lin.m. - -
- -
119 b) Removal & Disposal of existing R.C. Pipes - -
1. 46 cm dia x 1.00m - lin.m. - -
- -
2. 61 cm dia x 1.00m - lin.m. - -
- -
118 Miscellaneous Works & Materials - -
a) G.I. Pipe Railing, 50mm dia. 250.00 lin.m. 648.91 162,227.50 - -
- - -
b) G.I. Pipe For Elevated Flume, 300mm dia. - lin.m. - - -
- - -
c) Joint Sealant (Bituminus Type-Asphalt Sealant) 114.00 liters 247.83 28,252.62 - -
d) PVC Pipe, 150mm dia. 12.00 lin.m. 613.59 7,363.08 - -
- -
- - -
119 Steel Gate and Lifting Mechanism - - -
(Refer to Approved Drawing) - - -
Supply, Delivery, Installation and Commissioning of New Steel - - -
Gate, hoisting/lifting mechanism, and/or repair/improvement - - -
w/ accessories including dismantle & disposal to NIA stockyard - - -
- - -
I. CHECK GATES - - -
1. Garma Checkgate - - -
a. Provide steel gate, Ws 1400mm x Hs 1400mm HB-762 1.00 assy 205,524.00 205,524.00 0.5 0.50 102,762.00 50.00% 0.26%
- - -
b. Provide steel gate, Ws 600mm x Hs 600mm HB-762 1.00 assy 78,185.25 78,185.25 0.5 0.50 39,092.63 50.00% 0.10%
- - -
- - -
2. Baldonado Checkgate - - -
a. Provide steel gate, Ws 1000mm x Hs 1500mm HB-762 1.00 assy 162,409.50 162,409.50 0.5 0.50 81,204.75 50.00% 0.20%
- - -
b. Provide steel gate, Ws 500mm x Hs 500mm HB-762 2.00 assy 44,550.00 89,100.00 0.5 0.50 22,275.00 25.00% 0.06%
- - -
- - -
3. Tugade Checkgate - - -
a. Provide steel gate, Ws 750mm x Hs 1700mm HB-762 1.00 assy 180,675.00 180,675.00 0.5 0.50 90,337.50 50.00% 0.23%
- - -
b. Provide steel gate, Ws 600mm x Hs 600mm HB-762 1.00 assy 75,561.75 75,561.75 0.5 0.50 37,780.88 50.00% 0.10%
- - -
119 4. Lemana Checkgate - - -
a. Provide steel gate, Ws 1200mm x Hs 1700mm HB-762 1.00 assy 257,313.38 257,313.38 0.5 0.50 128,656.69 50.00% 0.32%
- - -
b. Provide steel gate, Ws 1500mm x Hs 2000mm HB-762 1.00 assy 310,711.50 310,711.50 0.5 0.50 155,355.75 50.00% 0.39%
- - -
c. Provide steel gate, Ws 600mm x Hs 600mm HB-762 1.00 assy 79,348.50 79,348.50 0.5 0.50 39,674.25 50.00% 0.10%
- - -
- - -
5. Lateral F Drainage Checkgate - - -
a. Provide steel gate, Ws 850mm x Hs 900mm HB-762 1.00 assy 119,319.75 119,319.75 0.5 0.50 59,659.88 50.00% 0.15%
- - -
b. Provide steel gate, Ws 500mm x Hs 500mm HB-762 1.00 assy 48,411.00 48,411.00 0.5 0.50 24,205.50 50.00% 0.06%
- - -
- - -
6. Ramboyon Checkgate - - -
a. Provide steel gate, Ws 1200mm x Hs 2450mm CP-12 2.00 assy 328,952.25 657,904.50 1 1.00 328,952.25 50.00% 0.83%
- - -
b. Provide steel gate, Ws 1250mm x Hs 900mm HB-762 1.00 assy 137,338.48 137,338.48 0.5 0.50 68,669.24 50.00% 0.17%
- - -
- - -
II. CANAL GATES - - -
1. Canal Structures - - -
1. Provide steel gate, Ws 700 mm x Hs 700 mm HB-762 1.00 assy 84,362.75 84,362.75 0.5 0.50 42,181.38 50.00% 0.11%
- - -
- - -
2. Provide steel gate, Ws 950 mm x Hs 950 mm HB-762 1.00 assy 126,512.00 126,512.00 0.5 0.50 63,256.00 50.00% 0.16%
- - -
- - -
3. Provide steel gate, Ws 1050 mm x Hs 1000 mm HB-762 2.00 assy 125,200.25 250,400.50 1 1.00 125,200.25 50.00% 0.32%
- - -
- - -
4. Provide steel gate, Ws 1100 mm x Hs 1000 mm HB-762 1.00 assy 163,488.50 163,488.50 1 1.00 163,488.50 100.00% 0.41%
- - -
119 5. Provide steel gate, Ws 1450 mm x Hs 1200 mm HB-762 2.00 assy 149,170.63 298,341.26 1 1.00 149,170.63 50.00% 0.38%
- - -
- - -
6. Provide steel gate, Ws 1150 mm x Hs 1150 mm HB-762 1.00 assy 122,651.00 122,651.00 0.5 0.50 61,325.50 50.00% 0.15%
- - -
- - -
7. Provide steel gate, Ws 1300 mm x Hs 1200 mm HB-762 1.00 assy 199,450.25 199,450.25 0.5 0.50 99,725.13 50.00% 0.25%
- - -
- - -
8. Provide steel gate,Ws 1400 mm x Hs 1200 mm HB-762 5.00 assy 173,017.25 865,086.25 1 1.00 173,017.25 20.00% 0.44%
- - -
- - -
9. Provide steel gate,Ws 1500 mm x Hs 1300 mm HB-762 1.00 assy 232,070.75 232,070.75 0.5 0.50 116,035.38 50.00% 0.29%
- - -
- - -
10. Provide steel gate,Ws 2150 mm x Hs 1100 mm HB-762 3.00 assy 269,806.25 809,418.75 1 1.00 269,806.25 33.33% 0.68%
- - -
- - -
11. Provide steel gate,Ws 1800 mm x Hs 800 mm HB-762 1.00 assy 180,962.00 180,962.00 0.5 0.50 90,481.00 50.00% 0.23%
- - -
- - -
12. Provide steel gate,Ws 1500 mm x Hs 600 mm HB-762 1.00 assy 89,238.50 89,238.50 0.5 0.50 44,619.25 50.00% 0.11%
- - -
- - -
13. Provide steel gate,Ws 2800 mm x Hs 2100 mm HB-762 1.00 assy 587,159.00 587,159.00 0.5 0.50 293,579.50 50.00% 0.74%
- - -
- - -
14. Provide steel gate,Ws 1400 mm x Hs 400 mm HB-762 1.00 assy 54,662.75 54,662.75 0.5 0.50 27,331.38 50.00% 0.07%
- - -
- - -
15. Provide steel gate,Ws 1500 mm x Hs 1600 mm HB-762 2.00 assy 240,287.75 480,575.50 1 1.00 240,287.75 50.00% 0.61%
- - -
119 III. TURNOUTS - - -
1. Provide gate,Ws 560 mm x Hs 560 mm HB-762 17.00 assy 34,881.68 592,988.56 10 10.00 348,816.80 58.82% 0.88%
- - -
- - -
2. Provide gate,Ws 600 mm x Hs 600 mm H-406 4.00 assy 40,691.38 162,765.52 2 2.00 81,382.76 50.00% 0.20%
- - -
- - -
3. Provide gate,Ws 800 mm x Hs 560 mm H-406 1.00 assy 50,257.25 50,257.25 0.5 0.50 25,128.63 50.00% 0.06%
- - -
- - -
4. Provide gate,Ws 560 mm x Hs 1600 mm H-406 1.00 assy 115,300.25 115,300.25 0.5 0.50 57,650.13 50.00% 0.15%
- - -
- - -
5. Provide gate,Ws 900 mm x Hs 1600 mm H-406 1.00 assy 163,488.50 163,488.50 0.5 0.50 81,744.25 50.00% 0.21%

-
TOTAL CONTRACT COST 39,701,253.86 17,623,811.27 44.39%

Prepared by: Conformed by: Checked by: Reviewed by: Submitted by:

RAHIB M. KAMAMA DAVID ASUNCION JASON T. GALUMO REYNALDO C. RODOLFO FLORA MAY D. RESPICIO
Engineer A Project Engineer Sr. Engineer A. NISRIP CMU Head, Engineering section Division Manager A
Legacy Construction Corporation
147

2.76% 5.52%

#REF!
#REF!

10,140,667.93
25.54%

38.85 7220.661
0.02%

298,017.61
323,447.51
25,429.90
8.27%

1.47%
1.47%
-
0.00%
1500
0.443910697006414

44.39%
17,623,811.27
MASTERLIST OF WORKS
Contract I.D Number : NISRIPD-13A-2R
ver Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
of Contractor : LEGACY CONSTRUCTION CORPORATION
Date NTP : MAY 25, 2020
Completion Date : DECEMBER 25, 2020
Project Amount : Php 39,701,253.86

MAIN CANAL Reinforce Steel Bars,


Concrete Canal
Clearing & All Sizes (Furnished, Canal Excavation
STATIONING LENGTH Lining, Class 'B", Embankment Conc. Demolition
Grubbing Stockpile, Cut & (Common)
170 kscm (cu.m)
FROM TO Bend)
m cu.m cu.m
4+833.29 5+474.17 640.88 769.06
5+483.29 6+191.34 708.05 849.66
6+200.87 6+301.57 100.70 120.84
6+301.51 6+400.76 99.25 119.10 41.69 1931.34
6+900.42 8+038.80 1138.38 1366.06
7+267.60 7+447.30 179.70 215.64 26.39 778.97
7+447.30 7+724.40 277.10 332.52
7+724.40 8+038.8 314.40 377.28 46.16 1304.54
8+024.39 8+033.89 9.50 11.40 1.34
8+038.80 8+288.80 250.00 300.00 35.25 1086.33
8+302.06 8+400.00 97.94 13.81
8+400.00 8+709.30 309.30 371.16 43.61 1436.11
8+718.00 9+239.69 427.22 512.66 60.24 1760.66
9+239.69 9+269.69 30.00 36.00
9+279.66 9+437.56 157.90 189.48
9+437.56 9+519.00 81.44 97.73 34.20 1610.46
9+519.00 9+539.23 20.23 24.28 2.90 98.56
9+539.23 9+550.23 11.00 13.20 9.57 407.55
9+550.23 9+559.23 9.00 10.80 7.83 351.12
9+559.23 9+881.18 321.95 386.34 47.28 1401.10
9+900.99 10+355.59 454.60 545.52
10+355.59 10+653.99 298.39 358.07
10+653.99 10+919.12 265.14 318.17
10+919.12 11+114.91 195.79 234.95
10+929.46 11+167.81 238.36 286.03
11+114.91 11+127.41 12.50 15.00 5.25 244.57
11+127.41 11+167.81 40.40 48.48
11+206.01 11+611.11 405.10 486.12
11+611.11 11+626.11 15.00 18.00 6.30 294.14
11+626.11 11+641.11 15.00 18.00
TOTAL 8,431.54 381.82 12,705.45
LATERAL D

Reinforce Steel Bars,


Concrete Canal
All Sizes (Furnished,
STATIONING LENGTH Lining, Class 'B", Embankment
Stockpile, Cut &
170 kscm (cu.m)
Bend)

0+006.91 0+012.00 5.088 6.11 0.76 26.89


0+012.91 0+016.00 3.09 3.71 0.23 13.80
0+102 0+205 103 123.60 7.73 235.67
0+205 0+271 66 79.20 4.95 148.35
0+271 0+355 84 100.80 6.30 166.35388
0+355 0+366.52 11.52 13.82 0.86 21.49532
0+361.32 0+366.52 5.2 6.24 1.35 102.7796
0+395.55 0+406.30 10.753 12.90 0.81
0+406.30 0+433.30 27 32.40 26.12
0+433.3 1+050.64 617.34 740.81 111.12
1+050 1+204.30 153.66 184.39 27.66
2+412.29 2+416.6 4.31 5.17 0.32
2+467 2+472 5 6.00 0.38
2+796.96 2+806.96 10 12.00 10.35
2+813.96 2+823.96 10 12.00 10.35
3+525.78 3+528.48 2.7 3.24 0.69
3+538.73 3+540.73 2 2.40 0.39
4+306.98 4+325 23.00 27.60 16.91
4+411 4+421 10.00 12.00 0.83
4+435.5 4+455 19.50 23.40 1.61
4+487.2 4+567.00 79.80 95.76 6.58
4+567 4+664.43 97.43 116.92 8.04
4+674.76 4+706.96 32.00 38.40 3.12
4+706.96 4+869 162.04 194.45 15.80
4+869 5+033.51 164.51 197.41 32.08
5+043.39 5+064 20.61 24.73 1.70
5+164 5+206.3 42.30 50.76 3.49
-
TOTAL 2,116.41 300.52
LATERAL D-2

Reinforce Steel Bars,


Concrete Canal
All Sizes (Furnished,
STATIONING LENGTH Lining, Class 'B", Embankment Stone Masonry
Stockpile, Cut &
170 kscm (cu.m)
Bend)

0+551.26 0+572.76 21.5 1.45


0+572.76 0+590.23 17.47 2.36
0+590.23 0+600 9.77 4.25 4.25
8.06

LATERAL E

Reinforce Steel Bars,


Concrete Canal
All Sizes (Furnished,
STATIONING LENGTH Lining, Class 'B", Embankment
Stockpile, Cut &
170 kscm (cu.m)
Bend)

0+226 0+266 40.00 48.00 21.00 21.00


0+441 0+448.5 7.50 9.00 3.94 3.94
1+460 1+582.70 122.70 147.24 64.42 64.42
1+830 1+840 10.00 5.10 5.10
1+918.56 2+074.56 156.00 187.20 72.54
2+184.54 2+284.54 200.00 84.00
2+434.5 2+544.5 110.00 32.18
2+682.66 2+734.54 51.88 15.17
2+734.54 2+913.63 179.08 52.38
3+289.44 3+334.54 45.10 13.19
3+578.29 3+679.85 101.57 29.71
4+314.54 4+354.54 40.00 11.70
4+554.54 4+599.54 45.00 24.30

TOTAL 391.44 429.63 -


GRAND TOTAL (MC+LAT. D+LAT.D-2 + LAT. E) 10,939.38 1,120.03 12,705.45
WORKS

REMARKS

EMBANKMENT ON SIDE B/S


EMBANKMENT ON SIDE B/S
EMBANKMENT ON SIDE B/S
PROPOSED L-SHAPE RETAINING WALL 50 CM W/ EMBANKMENT ON SIDE
EMBANKMENT ON SIDE B/S
PROPOSED WALL RAISING 40 CM W/ EMBANKMENT ON SIDE
EMBANKMENT ON SIDE B/S
PROPOSED WALL RAISING 40 CM W/ EMBANKMENT ON SIDE
CANAL RESTORATION BOTH SIDE
RESTORATION OF CHIPPED CANAL WALL BOTH SIDE
RESTORATION OF CHIPPED CANAL WALL BOTH SIDE - for variation
EXISTING
TO BE STARTED
EMBANKMENT ON SIDE B/S
EMBANKMENT ON SIDE B/S
PROPOSED L-SHAPE RETAINING WALL 55 CM W/ EMBANKMENT ON SIDE
WALL RAISING OF 0.40M W/ EMBANKMENT BOTH SIDE
WHOLE CANAL RESTORATION
WHOLE CANAL RESTORATION
WALL RAISING OF 0.40M W/ EMBANKMENT BOTH SIDE
EMBANKMENT ON SIDE B/S
EMBANKMENT ON SIDE B/S
EMBANKMENT ON SIDE B/S
EMBANKMENT ON SIDE B/S
PROVIDE 50MM GI PIPE RAILINGS
CONCRETE LINE CANAL LEFT SIDE AND CHANGE DESIGN L-SHAPE & EMBANKMENT B/S
EMBANKMENT ON SIDE B/S
EMBANKMENT ON SIDE B/S
CONCRETE LINE CANAL LEFT SIDE AND CHANGE DESIGN L-SHAPE & EMBANKMENT B/S (W/ IA RESO)
EMBANKMENT ON SIDE B/S
REMARKS

To be raised by 0.15m both side -1 side


To be raised by 0.15m right side -1 side
To be retained left side & const. right side -1 side
To be raised by 0.15m left side -1 side
To be raised by 0.15m right side -1 side
To be raised by 0.15m right side -1 side
Canal restoration left side
Proposed concrete line canal to be raised right side by 0.15m
Replacement of whole canal w/ demolition
Proposed concrete line canal to be raised both side by 0.25m
Proposed concrete line canal to be raised both side by 0.25m
Proposed concrete line canal to be raised right side by 0.15m
Proposed concrete line canal to be raised right side by 0.15m
DEMOLISHED AND REPLACED whole canal
DEMOLISHED AND REPLACED whole canal
Proposed concrete line canal to be raised both side by 0.5m
Proposed concrete line canal to be raised both side by 0.3m
Demolished all Flooring and Right side walling then Replaced
Proposed concrete line canal to be raised left side by 0.2m
Proposed concrete line canal to be raised left side by 0.2m
Proposed concrete line canal to be raised left side by 0.2m
Proposed concrete line canal to be raised right side by 0.2m
Proposed concrete line canal to be raised right side by 0.3m
Proposed concrete line canal to be raised left side by 0.3m
Proposed concrete line canal to be raised both side by 0.3m
Right side to be raised by 0.2 m
Right side to be raised by 0.2 m
REMARKS

Proposed canal wall nosing right side


Proposed canal wall nosing both side
Replacement of conrete canal w/ demolition

REMARKS

Remove replaced whole canal


Remove replaced whole canal
Remove replaced whole canal
Remove replaced whole canal
PLEASE VERIFY ON ACTUAL
Concrete line canal to be replace at right side
Concrete line canal to be replace at right side
Concrete line canal to be replace at right side
Concrete line canal to be replace at right side
Concrete line canal to be replace at left side
Concrete line canal to be replace at left side
Concrete line canal to be replace at left side
Concrete line canal to be replace at both side
NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 6+301.51 - 6+400.76, L=99.25 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

1 L-SHAPE WALLING (VERT. BAR) 10 6 A 0.616 0.78 0.68 1.45 0.30 1,324.00 1,182.60 0.50 331.00 101.95
B

2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 6.00 160.00 0.30 170.00 628.32 -
A
3 L-SHAPE WALLING (HOR. BAR-2) 10 6 0.616 2.65 2.65 1.00 0.30 10.00 16.32 0.70 5.00 2.16
-
1,827.24 104.10
GRAND TOTAL WEIGHT = 1,931.34 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 7+267.60 - 7+447.30 , L=179.70 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS

A
1 WALL RAISING (VERT. BAR) 10 6 0.616 0.42 0.42 0.30 1,200.00 310.46 0.08 42.00 2.07

A
2 WALLING (HOR. BAR-1) 10 6 0.616 6.00 6.00 1.00 0.30 124.00 458.30 -

3 WALLING (HOR. BAR-2) 10 6 A 0.616 3.30 3.30 1.00 0.30 4.00 8.13

-
776.90 2.07
GRAND TOTAL WEIGHT = 778.97 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 7+724.40 - 8+024.39 , L=299.99 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

1 WALL RAISING (VERT. BAR) 10 6 A 0.616 0.42 0.42 0.30 2,000.00 517.44 0.08 72.00 3.55

A
2 WALLING (HOR. BAR-1) 10 6 0.616 6.00 6.00 1.00 0.30 208.00 768.77 -

A
3 WALLING (HOR. BAR-2) 10 6 0.616 3.89 3.89 1.00 0.30 4.00 9.58 2.11 4.00 5.20

-
1,295.79 8.75
GRAND TOTAL WEIGHT = 1,304.54 KGS.
NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 8+024.39 - 8+033.89 , L=9.50 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS

A
1 WALL RAISING (VERT. BAR) 10 6 0.616 0.42 0.42 1.00 0.30 64.00 16.56 0.08 2.00 0.10

A
2 WALLING (HOR. BAR-1) 10 6 0.616 6.00 6.00 1.00 0.30 4.00 14.78 -
A
3 WALLING (HOR. BAR-2) 10 6 0.616 4.10 4.10 1.00 0.30 4.00 10.10

-
41.44 0.10
GRAND TOTAL WEIGHT = 41.54 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 8+038.80 - 8+288.80 , L=250 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

1 WALL RAISING (VERT. BAR) 10 6 A 0.616 0.42 0.42 0.30 1,668.00 431.54 0.08 62.00 3.06

A
2 WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 6.00 1.00 0.30 172.00 635.71 -

A
3 WALLING (HOR. BAR-2) 10 6 0.616 5.20 5.20 1.00 0.30 4.00 12.81 0.80 4.00 3.20

1,080.07 6.26

GRAND TOTAL WEIGHT = 1,086.33 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 8+400.00 - 8+812.47 , L=412.47 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS

1 WALL RAISING (VERT. BAR) 10 6 A 0.616 0.42 0.42 0.30 1,375.00 355.74 0.08 86.00 4.24

2 WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 6.00 1.00 0.30 288.00 1,064.45 -
A
A
3 WALLING (HOR. BAR-2) 10 6 0.616 2.37 2.37 1.00 0.30 4.00 5.84 4.74 2.00 5.84

1,426.03 10.08

GRAND TOTAL WEIGHT = 1,436.11 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 8+718.00 - 9+239.69 , L=520 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR SHAPE WT. (KGS) KGS.
NO. mtr.
BAR EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

1 WALL RAISING (VERT. BAR) 10 6 A 0.616 0.42 0.42 0.30 1,734.00 448.62 0.08 86.00 4.24

2 WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 6.00 1.00 0.30 364.00 1,345.34 -
A
A
3 WALLING (HOR. BAR-2) 10 6 0.616 1.60 1.60 1.00 0.30 4.00 3.94 0.40 2.00 0.49

1,797.91 4.73

GRAND TOTAL WEIGHT = 1,802.64 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 9+437.56 - 9+519.00 , L=81.44 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

A
1 L-SHAPE WALLING (VERT. BAR) 10 6 B 0.616 1.03 0.73 1.75 0.15 1,086.00 1,170.71 0.85 217.00 113.62

2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 6.00 14.00 0.30 84.00 310.46 -
A

A
3 L-SHAPE WALLING (HOR. BAR-2) 10 6 0.616 1.94 1.94 1.00 0.30 12.00 14.34 0.18 12.00 1.33

1,495.51 114.95

GRAND TOTAL WEIGHT = 1,610.46 KGS.


NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 9+519.00 - 9+539.23 , L=20.23 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS

1 WALL RAISING (VERT. BAR) 10 6 A 0.616 0.42 0.42 0.30 136.00 35.19 0.08 86.00 4.24

2 WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 6.00 1.00 0.30 12.00 44.35 -
A
A
3 WALLING (HOR. BAR-2) 10 6 0.616 3.43 3.43 1.00 0.30 4.00 8.45 2.57 4.00 6.33

87.99 10.57

GRAND TOTAL WEIGHT = 98.56 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 9+539.23 - 9+550.23 , L=11.00 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

A C
1 U-BAR 10 6 B 0.616 1.53 1.85 1.53 4.90 - 0.30 74.00 223.36 1.10 74.00 50.14

A
2 WALLING (HOR. BAR-1) 10 6 0.616 6.00 . 6.00 2.00 0.30 34.00 125.66 0.40 34.00 8.38

3 WALLING (HOR. BAR-2)

349.03 58.52

GRAND TOTAL WEIGHT = 407.55 KGS.


NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 9+550.23 -9+559.23 , L=9.00 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

A C
1 U-BAR 10 6 B 0.616 1.53 1.85 1.53 4.90 - 0..15 61.00 184.12 1.10 61.00 41.33

2 WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 . 6.00 1.00 0.30 17.00 62.83 -

3 WALLING (HOR. BAR-2) 10 6 A 0.616 3.60 3.60 1.00 0.30 17.00 37.70 2.40 17.00 25.13

284.65 66.47

GRAND TOTAL WEIGHT = 351.12 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 9+559.23 - 9+881.18 , L=321.91
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

1 WALL RAISING (VERT. BAR) 10 6 A 0.616 0.42 0.42 0.30 2,146.00 555.21 0.08 86.00 4.24

A
2 WALLING (HOR. BAR-1) 10 6 0.616 6.00 6.00 1.00 0.30 224.00 827.90 -

A
A
3 WALLING (HOR. BAR-2) 10 6 0.616 3.01 3.01 1.00 0.30 4.00 7.42 2.57 4.00 6.33

1,390.53 10.57

GRAND TOTAL WEIGHT = 1,401.10 KGS.


NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 11+114.91 - 11+127.41, L=12.5 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

1 L-SHAPE WALLING (VERT. BAR) 10 6 A 0.616 0.78 0.68 1.45 0.30 167.00 149.16 0.50 41.75 12.86
B

2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 6.00 160.00 0.30 20.00 73.92 -
A
3 L-SHAPE WALLING (HOR. BAR-2) 10 6 0.616 1.40 1.40 1.00 0.30 10.00 8.62
-
231.71 12.86
GRAND TOTAL WEIGHT = 244.57 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 11+611.11 - 11+626.11, L=15.00 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

1 L-SHAPE WALLING (VERT. BAR) 10 6 A 0.616 0.78 0.68 1.45 0.30 200.00 178.64 0.50 50.00 15.40
B

2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 6.00 6.00 160.00 0.30 20.00 73.92 -
A
3 L-SHAPE WALLING (HOR. BAR-2) 10 6 0.616 3.90 3.90 1.00 0.30 10.00 24.02 0.70 5.00 2.16
-
276.58 17.56
GRAND TOTAL WEIGHT = 294.14 KGS.
NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 9+685.23 - 9+693.23 , L=8.00 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)
1 U-BAR 10 6 0.616 1.53 1.85 1.53 4.90 - 0.30 27.00 81.50 1.10 27.00 18.30
2 WALLING (HOR. BAR-1) 10 6 A C 0.616 6.00 . 6.00 1.00 0.30 17.00 62.83 -
BAA

3 WALLING (HOR. BAR-2) 10 6 A 0.616 2.30 2.30 1.00 0.30 17.00 24.09

168.41 18.30

GRAND TOTAL WEIGHT = 186.71 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 9+519.00 -9+881.18 , L=362.18 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
1 WALL RAISING (VERT. BAR) 10 6 0.616 0.37 0.37 0.30 1,207.00 275.10 0.08 75.00 3.70
A
2 WALLING (HOR. BAR-1) 10 6 0.616 6.00 6.00 1.00 0.30 252.00 931.39 -
3 WALLING (HOR. BAR-2) 10 6 A 0.616 3.38 3.38 1.00 0.30 4.00 8.33 2.62 4.00 6.46
AA -
1,214.82 10.15
GRAND TOTAL WEIGHT = 1,224.97 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN CANAL (MC) @ STA. 8+718.00 -9+239.69 , L=520 m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
1 WALL RAISING (VERT. BAR) 10 6 0.616 0.37 0.37 0.30 1,734.00 395.21 0.08 108.00 5.32
A
2 WALLING (HOR. BAR-1) 10 6 A
0.616 6.00 6.00 1.00 0.30 364.00 1,345.34 -
3 WALLING (HOR. BAR-2) 10 6 A 0.616 3.38 3.38 1.00 0.30 4.00 8.33 2.62 4.00 6.46
-
1,748.89 11.78
GRAND TOTAL WEIGHT = 1,760.66 KGS.

8+718.00 9+239.69 520.00


NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN LATERAL D @ STA. 0+006.91 - 0+012.00, L=5.088m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
B
A
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 40.00 15.40 0.38 9.00 2.08

2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 5.09 5.09 1.00 0.30 3.00 9.41 -

-
24.81 2.08
GRAND TOTAL WEIGHT = 26.89 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN LATERAL D @ STA. 0+012.91 -0+016.00, L=3.088m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS KGS.
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
B
A
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 21.00 8.09 0.38 9.00

2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 3.09 3.09 1.00 0.30 3.00 5.71

13.80 -
GRAND TOTAL WEIGHT = 13.80 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+102 -0+205, L=103.00m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS KGS.
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
B
A
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 343.00 132.06 0.15 9.00 0.83

A
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 0.616 3.09 3.09 1.00 0.30 54.00 102.79

234.84 0.83

GRAND TOTAL WEIGHT = 235.67 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+205 -0+271, L=66.00m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR SIZE REMARKS KGS.
LENGTH BAR A B C D E F LENGTH SPLICING SPACING LENGTH
BAR UNIT WT./
BAR LOCATION BAR SHAPE WT. (KGS) EXCESS
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)

B
A
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 220.00 84.70 0.15 9.00 0.83

2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 3.09 3.09 1.00 0.30 33.00 62.81

147.51 0.83
GRAND TOTAL WEIGHT = 148.35 KGS.
NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+271 -0+355, L=84.00m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS KGS.
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
B
1 L-SHAPE WALLING (VERT. BAR) 10 6 A 0.616 0.45 0.18 0.63 0.30 280.00 107.80 0.38 31.00 7.16

A
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 0.616 3.09 3.09 1.00 0.30 27.00 51.39

159.19 7.16
GRAND TOTAL WEIGHT = 166.35 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+355 -0+366.52, L=11.520m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS KGS.
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
B
1 L-SHAPE WALLING (VERT. BAR) 10 6 A 0.616 0.45 0.18 0.63 0.30 38.00 14.63 0.38 5.00 1.16

A
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 0.616 3.09 3.09 1.00 0.30 3.00 5.71

20.34 1.16
GRAND TOTAL WEIGHT = 21.50 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+361.32 -0+366.52, L=5.20m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS KGS.
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
B
A
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 1.58 1.40 0.25 3.23 0.15 34.00 67.54 -

A
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 0.616 3.09 5.20 - 0.30 11.00 35.24

102.78
GRAND TOTAL WEIGHT = 102.78 KGS.
NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MC @ STA. 10+653.985 - 10+658.985, L=5.0m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS

1 Footing (C1F1) 16 6 1.580 0.30 1.40 0.30 2.00 0.20 320.00 1,011.20

2 Column Vertical bar 20 6 2.470 0.30 5.70 6.00 200.00 2,964.0

3 Column Tie bars 12 6 C 0.890 0.50 0.30 0.30 0.50 1.60 0.20 700.00 996.80 1.20 234.00 249.91
D

4 Footing (Stiffener Column) 16 6 1.580 0.15 0.70 0.15 1.00 50.00 79.00 -

5 Stiffiner Column (Vertical bar) 16 6 1.580 0.30 5.60 6.00 40.00 379.20 -

6 Stiffiner Column Tie bars 10 6 C 0.620 0.30 0.20 0.20 0.30 1.00 145.00 89.90 -
D

7 Tie beam (TB1)(left Side longer section) 16 6 1.580 0.30 5.70 6.00 1.00 40.00 379.20 -

8 Tie beam (TB1)(left Side longer section) 16 6 1.580 0.30 5.63 6.00 1.00 40.00 379.20 -

A Utilize 20pcs to Bar


9 Tie beam (TB1)(middle longer section) 16 6 1.580 0.30 3.95 4.25 40.00 268.60 1.75 20.00 No.3 55.30

Tie beam (TB1)(Right side longer


10 16 6 1.580 0.300 5.700 6.000 2.000 40.000 379.200 -
section)

Tie beam (TB1)(Right side longer


11 16 6 1.580 0.300 5.630 6.000 2.000 40.000 379.200 -
section)

12 Stirrups (TB1)(longer section) 16 6 1.580 0.300 0.200 0.200 0.300 1.000 0.200 570.000 900.600 -
C D

13 Tie beam (TB1)(shorter section) 16 6 1.580 0.300 5.700 6.000 3.000 40.000 379.200 -

14 Tie beam (TB1)(shorter section) 16 6 A 1.580 6.000 6.000 3&4 40.000 379.200 -

Utilize 8pcs to Bar


15 Tie beam (TB1)(shorter section) 16 6 1.580 0.300 2.000 2.300 4.000 40.000 145.360 1.40 8.00 No.21 17.70

16 Stirrups (TB1)( shorter section) 10 6 0.620 0.300 0.200 0.200 0.300 1.000 0.200 252.000 156.240 -
C D

17 SB1 (along section D&A) 12 6 0.890 0.300 5.700 6.000 5.000 8.000 42.720 -

18 SB1 (along section D&A) 12 6 A 0.890 6.000 6.000 5.000 8.000 42.720 -
19 SB1 (along section D&A) 12 6 0.890 0.300 5.300 5.600 5.000 8.000 39.872 0.40 8.00 2.85

20 SB1 (along section 1 )(6.3m long) 12 6 0.890 0.300 5.700 6.000 6.000 4.000 21.360 -

21 SB1 (along section 1 )(6.3m long) 12 6 0.890 0.300 1.100 1.400 6.000 4.000 4.984 0.40 1.00 0.36

22 SB1 (along section D)(7.65m long) 12 6 0.890 0.300 5.700 6.000 7.000 4.000 21.360 -

23 SB1 (along section D)(7.65m long) 12 6 0.890 0.300 2.450 2.750 7.000 4.000 9.790 0.50 2.00 0.89

24 SB1(Lateral Ties) 10 6 0.620 0.280 0.280 0.200 225.000 39.060 0.12 11.00 0.82
A

25 Slab Reinforcement along longer section 10 6 0.620 0.050 5.950 6.000 8.000 0.600 44.000 163.680 -

26 Slab Reinforcement along longer section 10 6 0.620 6.000 6.000 8.000 0.600 44.000 163.680 -
A

27 Slab Reinforcement along longer section 10 6 0.620 6.000 6.000 8.000 0.600 44.000 163.680 -
A

28 Slab Reinforcement along longer section 10 6 0.620 6.000 6.000 8.000 0.600 44.000 163.680 -
A

Utilize 44 pcs to bar


29 Slab Reinforcement along longer section 10 6 0.620 0.050 3.100 3.150 8.000 0.600 44.000 85.932 2.85 44.00 no. 24 77.75

30 Slab Reinforcement along shorter section 10 6 0.620 0.050 5.950 6.000 9.000 0.600 27.000 100.440 -

31 Slab Reinforcement along shorter section 10 6 0.620 6.000 6.000 9.000 0.600 27.000 100.440 -
A

Utilize 27 pcs to bar


32 Slab Reinforcement along shorter section 10 6 0.620 0.050 4.700 4.750 9.000 0.600 27.000 79.515 1.25 27.00 no. 24 20.93

33 WF1 (along section D&A)(HOR. BAR) 12 6 0.890 0.100 5.900 6.000 10.000 4.000 21.360 -

34 WF1 (along section D&A)(HOR. BAR) 12 6 0.890 6.000 6.000 10.000 4.000 21.360 -
A

35 WF1 (along section D&A)(HOR. BAR) 12 6 0.890 0.100 5.300 5.400 10.000 4.000 19.224 0.60 4.00 2.14
36 WF1 (6.3m)(HOR. BAR) 12 6 0.890 0.100 5.900 6.000 11.000 2.000 10.680 -

Utilize 2pcs to bar no.


37 WF1 (6.3m)(HOR. BAR) 12 6 0.890 0.100 1.100 1.200 11.000 2.000 2.136 4.80 2.00 21 8.54

38 WF1 (7.65m)(HOR. BAR) 12 6 0.890 0.100 5.900 6.000 12.000 2.000 10.680 -

Utilize 2pcs to bar no.


39 WF1 (7.65m)(HOR. BAR) 12 6 0.890 0.100 2.450 2.550 12.000 2.000 4.539 3.45 2.00 37 6.14

40 WF1 STIRRUPS 10 6 0.620 0.250 0.250 0.300 150.000 23.250 -


A
Utilize 113pcs to bar
41 WF1 (CHB)(VER. BAR) 12 6 0.890 0.075 4.080 4.155 0.400 113.000 417.868 1.85 113.00 186.05
no. 37

WF1 (CHB)(HOR. BAR ALONG SECTION


42 10 6 0.620 6.000 6.000 13.000 0.600 16.000 59.520 -
D$A)
A
WF1 (CHB)(HOR. BAR ALONG SECTION
43 10 6 0.620 6.000 6.000 13.000 0.600 16.000 59.520 -
D&A)
A
WF1 (CHB)(HOR. BAR ALONG SECTION Utilize 16pcs to bar no.
44 10 6 0.620 3.600 3.600 14.000 0.600 16.000 35.712 2.40 16.00 38 23.81
D&A)
A

WF1 (CHB)(HOR. BAR ALONG SECTION


45 10 6 0.620 6.000 6.000 15.000 0.600 8.000 29.760 -
6.3M)
A
WF1 (CHB)(HOR. BAR ALONG SECTION
46 10 6 0.620 0.500 0.500 15.000 0.600 8.000 2.480 -
6.3M)
A
WF1 (CHB)(HOR. BAR ALONG SECTION
47 10 6 0.620 6.000 6.000 16.000 0.600 8.000 29.760 -
7.65M)
A
WF1 (CHB)(HOR. BAR ALONG SECTION Utilize 3pcs to bar no.
48 10 6 0.620 1.850 1.850 16.000 0.600 8.000 9.176 0.45 3.00 0.84
7.65M) 40
A
-
11,266.04 654.01
GRAND TOTAL WEIGHT = 11,920.05 KGS.
NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MC @ STA. 10+924.248
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS

CUT-OFF-WALL (VERTICAL BAR-1) 10 6 0.616 2.00 2.00 0.30 12.00 14.78

A
CUT-OFF-WALL (HORIZONTAL BAR-2) 10 6 0.616 3.00 3.00 0.30 6.00 11.1

A
U-BAR1-INLET TRANSITION 10 6 0.616 1.70 2.00 2.00 5.70 0.30 14.00 49.16 0.30 14.00 2.59
A

B C
A
U-BAR2-INLET TRANSITION 10 6 0.616 1.70 1.00 1.00 3.70 0.30 13.00 29.63 2.30 13.00 18.42

B C
A
U-BAR1-OUTLET TRANSITION 10 6 0.616 1.70 2.00 2.00 5.70 0.30 12.00 42.13 0.30 12.00 2.22

B C
A
U-BAR2-OUTLET TRANSITION 10 6 0.616 1.70 1.00 1.00 3.70 0.30 11.00 25.07 2.30 11.00 15.58

B C
A
SIDE WALL - BAR 1 10 6 0.616 0.55 3.00 0.25 0.25 0.25 1.00 5.30 0.30 12.00 39.18 0.70 12.00 5.17

A D
B C E F
SIDE WALL - BAR 2 10 6 0.616 3.50 0.55 4.05 0.30 12.00 29.94 1.95 12.00 14.41

A B

FLOOR BAR-1 10 6 0.616 0.55 3.00 1.20 1.24 5.99 0.30 7.00 25.83

B D
A
C
FLOOR BAR-2 10 6 0.616 5.56 5.56 0.30 7.00 23.97 0.44 7.00 1.90

FLOOR BAR-2 10 6 0.616 2.43 0.55 2.98 0.30 7.00 12.85 3.00 1.00 1.85

BOX-CULVERT L SHAPE 12 6 0.888 0.45 0.45 0.90 0.26 38.00 30.37 0.60 7.00 3.73

B
A

BOX-CULVERT FLOOR SLAB 16 6 1.579 0.09 0.05 1.58 0.05 0.09 1.86 0.13 37.00 108.67 0.42 12.00 7.96
A E
B C D

BOX-CULVERT C SHAPE 12 A 0.888 0.45 1.44 0.45 2.34 0.26 38.00 78.96 1.32 15.00 17.58

BOX-CULVERT C SHAPE 10 6 0.616 0.15 1.38 0.15 1.68 0.26 38.00 39.33 0.96 10.00 5.91
A

B
B

BOX-CULVERT FLOOR SLAB 12 6 1.579 0.15 0.03 1.58 0.03 0.15 1.94 0.13 37.00 113.05 0.18 13.00 3.69
B C C
A D

TEMP. BAR/OUTER 10

TEMP. BAR/INNER 10

A
TEMP. BAR/FLOOR SLAB

10

A
674.00 101.02
GRAND TOTAL WEIGHT = 775.02 KGS.
NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : MAIN LATERAL D @ STA. 0+012.91 -0+016.00, L=3.088m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS

1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 21.00 8.09 0.38 9.00

B
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 3.09 3.09 1.00 0.30 3.00 5.71

13.80 -
GRAND TOTAL WEIGHT = 13.80 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+102 -0+205, L=103.00m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 343.00 132.06 0.15 9.00 0.83
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 0.616 3.09 3.09 1.00 0.30 54.00 102.79

B
A
A
234.84 0.83
GRAND TOTAL WEIGHT = 235.67 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+205 -0+271, L=66.00m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 220.00 84.70 0.15 9.00 0.83
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 0.616 3.09 3.09 1.00 0.30 33.00 62.81

B
A
A
147.51 0.83
GRAND TOTAL WEIGHT = 148.35 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+271 -0+355, L=84.00m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr. NO. PCS
mm m NO. m m m m m m m no. m pcs. CUT L (m)
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 280.00 107.80 0.38 31.00 7.16
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 0.616 3.09 3.09 1.00 0.30 27.00 51.39
B
A
A

159.19 7.16
GRAND TOTAL WEIGHT = 166.35 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+355 -0+366.52, L=11.520m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS KGS.
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
1 L-SHAPE WALLING (VERT. BAR) 10 6 0.616 0.45 0.18 0.63 0.30 38.00 14.63 0.38 5.00 1.16
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 B 0.616 3.09 3.09 1.00 0.30 3.00 5.71
A
A

20.34 1.16
GRAND TOTAL WEIGHT = 21.50 KGS.

NAME OF PROJECT : Rehabilitation and Improvement of Lambayong River Irrigation System Main Canal (from Sta 4+828 - Sta 11+641), Lateral D, D2, E, & F including Canal Structures and 6 Checks & Weirs
NAME OF STRUCTURE : LATERAL D @ STA. 0+361.32 -0+366.52, L=5.20m
Contract I.D Number : NISRIPD-13A-2R
BAR SCHEME
BAR BAR DESCRIPTION TOTAL CUT BAR BAR NO. OF CUT EXCESS OF 6m EXCESS WT.
BAR BAR SIZE UNIT WT./ REMARKS KGS.
BAR LOCATION LENGTH BAR BAR SHAPE A B C D E F LENGTH SPLICING SPACING LENGTH WT. (KGS) EXCESS
NO. mtr.
mm m NO. m m m m m m m no. m pcs. CUT L (m) NO. PCS
1 L-SHAPE WALLING (VERT. BAR) 10 6 B 0.616 1.58 1.40 0.25 3.23 0.15 34.00 67.54 -
2 L-SHAPE WALLING (HOR. BAR-1) 10 6 A 0.616 3.09 5.20 - 0.30 11.00 35.24
A

102.78
GRAND TOTAL WEIGHT = 102.78 KGS.
67.73
#REF!
20.60

0.891228070175439 4.83333333333333

3.60 6.00
3.90

343.33 9.52380952380952 5.85


18.0701754385965 4.83333333333333 1.5
3.60 6.00
3.90

220.00 9.52380952380952 5.85


11.5789473684211 4.83333333333333 1.5
3.60 6.00
3.90

46.6666666666667

280 9.52380952380952 31.11


5.63 0.38
38.4 9.52380952380952 4.22
5.63 0.38

33.3333333333333
11.0666666666667
MASTERLIST OF COMPLETED STRUCTURES

NAME OF STRUCTURES STATIONING Gravel Bedding

I MAIN CANAL
1. CHECK STRUCTURE 10+653.985
2. THRESHER CROSSING W/ CHECK 10+924.25
II LATERAL D
1. THRESHER CROSSING W/ CHECK 2+806.96 - 2+813
III LATERAL E
1. CHECK STRUCTURE 0+720 - 0+721.50
2. CHECK STRUCTURE 1+185 - 1+186.50
3. THRESHER CROSSING W/ CHECK 2+244.54 - 2+254.54
Reinforce Steel Bars,
Concrete Canal
All Sizes (Furnished,
Structure, Class 'A", Excavation Embankment
Stockpile, Cut &
211 kscm
Bend)

cu.m kgs. cu.m cu.m


STATIONING LENGTH AREA1 AREA2 VOLUME
9+640 - 9+660 20 0 49.2 492
9+660 - 9+680 20 49.2 22.69 718.9
9+680 - 9+700 20 22.69 1.85 245.4
9+700 - 9+720 20 1.85 0 18.5
9+720 - 9+740 20 0 0 0
9+740 - 9+760 20 0 0 0
9+760 - 9+780 20 0 0 0
9+780 - 9+800 20 0 0 0
9+800 - 9+820 20 0 0 0
9+820 - 9+840 20 0 0 0
9+840 - 9+860 20 0 0 0
9+860 - 9+880 20 0 0 0
9+880 - 9+900 20 0 0 0
9+900 - 9+920 20 0 0 0
9+920 - 9+940 20 0 3.64 36.4
9+940 - 9+960 20 3.64 7.69 113.3
9+960 - 9+980 20 7.69 3.85 115.4
9+980 - 10+000 20 3.85 12.45 163
10+000 - 10+020 20 12.45 10.93 233.8
10+020 - 10+040 20 10.93 8.51 194.4
10+040 - 10+060 20 8.51 3.02 115.3
10+060 - 10+080 20 3.02 11.58 146
10+080 - 10+100 20 11.58 16.58 281.6
10+100 - 10+120 20 16.58 5.73 223.1
10+120 - 10+140 20 5.73 10.52 162.5
10+140 - 10+160 20 10.52 15.99 265.1
10+160 - 10+180 20 15.99 8.96 249.5
10+180 - 10+200 20 8.96 7.78 167.4
10+200 - 10+220 20 7.78 15.21 229.9
10+220 - 10+240 20 15.21 29.69 449
10+240 - 10+260 20 29.69 7.7 373.9
10+260 - 10+280 20 7.7 3.34 110.4
10+280 - 10+300 20 3.34 0.06 34
10+300 - 10+320 20 0.06 13.24 133
10+320 - 10+340 20 13.24 13.81 270.5
10+340 - 10+360 20 13.81 1.55 153.6
10+360 - 10+380 20 1.55 3.25 48
10+380 - 10+400 20 3.25 28.02 312.7
10+400 - 10+420 20 28.02 27.37 553.9
10+420 - 10+440 20 27.37 34 613.7
10+440 - 10+460 20 34 6.64 406.4
10+460 - 10+480 20 6.64 0.41 70.5
10+480 - 10+500 20 0.41 0 4.1
10+500 - 10+520 20 0 0 0
10+520 - 10+540 20 0 0 0
10+540 - 10+560 20 0 0 0
10+560 - 10+580 20 0 0 0
10+580 - 10+600 20 0 0 0
10+600 - 10+620 20 0 0 0
10+620 - 10+640 20 0 0 0
10+640 - 10+660 20 0 0 0
10+660 - 10+680 20 0 0 0
10+680 - 10+700 20 0 0 0
10+700 - 10+720 20 0 0 0
10+720 - 10+740 20 0 0 0
10+740 - 10+760 20 0 3.6 36
10+760 - 10+780 20 3.6 8.13 117.3
10+780 - 10+800 20 8.13 10.25 183.8
10+800 - 10+820 20 10.25 14.4 246.5
10+820 - 10+840 20 14.4 13.3 277
10+840 - 10+860 20 13.3 0 133
10+860 - 10+880 20 0 0 0
10+880 - 10+900 20 0 0 0
10+900 - 10+920 20 0 0 0
10+920 - 10+940 20 0 0 0
10+940 - 10+960 20 0 0 0
10+960 - 10+980 20 0 0 0
10+980 - 11+000 20 0 0 0
11+000 - 11+020 20 0 0 0
11+020 - 11+040 20 0 0 0
11+040 - 11+060 20 0 7.77 77.7
11+060 - 11+080 20 7.77 7.64 154.1
11+080 - 11+100 20 7.64 15.11 227.5
11+100 - 11+120 20 15.11 4.71 198.2
11+120 - 11+140 20 4.71 0.86 55.7
11+140 - 11+160 20 0.86 11.54 124
11+160 - 11+180 20 11.54 10.38 219.2
11+180 - 11+200 20 10.38 0 103.8
11+200 - 11+220 20 0 0 0
11+220 - 11+240 20 0 0 0
11+240 - 11+260 20 0 0 0
11+260 - 11+280 20 0 0 0
11+280 - 11+300 20 0 0 0
11+300 - 11+320 20 0 0 0
11+320 - 11+340 20 0 0 0
11+340 - 11+360 20 0 0 0
11+360 - 11+380 20 0 0 0
11+380 - 11+400 20 0 0 0
11+400 - 11+420 20 0 0 0
11+420 - 11+440 20 0 0 0
11+440 - 11+460 20 0 0 0
11+460 - 11+480 20 0 0 0
11+480 - 11+500 20 0 0 0
11+500 - 11+520 20 0 0.57 5.7
11+520 - 11+540 20 0.57 3.54 41.1
11+540 - 11+560 20 3.54 6.89 104.3
11+560 - 11+580 20 6.89 0 68.9
11+580 - 11+600 20 0 0 0
11+600 - 11+620 20 0 1.1 11
11+620 - 11+640 20 1.1 10.06 111.6
10,201.60