1. This quality assurance plan outlines the inspection steps for metallic expansion joints from raw materials through final product. 2. Key checks include testing the chemical properties of steel, non-destructive testing of longitudinal welds, inspecting the bellows forming process, and conducting air leak, visual, and dimensional inspections of the final product. 3. The plan specifies acceptance standards, the extent of checking, and record keeping requirements to ensure quality.

Uploaded by

demas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
8K views1 page

Quality Assurance Plan (QAP)

1. This quality assurance plan outlines the inspection steps for metallic expansion joints from raw materials through final product. 2. Key checks include testing the chemical properties of steel, non-destructive testing of longitudinal welds, inspecting the bellows forming process, and conducting air leak, visual, and dimensional inspections of the final product. 3. The plan specifies acceptance standards, the extent of checking, and record keeping requirements to ensure quality.

Uploaded by

demas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

QUALITY ASSURANCE PLAN FOR METALLIC EXPANSION JOINTS

Customer: Date:
Manufacturer: KWALITY PRODUCTS (PLIANT BELLOWS) Quotation. No.
Size: PO No :
QAP No: Q-070

Component/ Characteristic to be Type / Method Acceptance Pliant


Sr. No. Extent of Check Format of records Client
Operation checked of check Standard Bellows
1.0 Raw Material
1.1 Steel Parts Chemical Properties Chemical One sample/ lot MOC: Test Certificate from V R
per thickness External Lab/
Manufacturer's
2.0 In Process
2.1 Longitudinal Welding NDT in Weld LPI 100% LPI AS PER ASME Penetrant Test P R
SEC V ARTICLE 6 Report
2.2 Bellow Forming Convolution Physical 100% Job Route card In-process Inspection P R
Report
3.0 Final
3.1 Assembly Welding Air Leak Check (Soap Physical 100% As per Company Bubble Jet Test P R
Water) Procedure Report

3.2 Visual Inspection Weld Visual Physical 100% As per company Internal Inspection P R
Procedure Report

3.3 Dimension Inspection Final Dimension Physical 100% Approved Internal Inspection P R
Drawing and PO Report
3.4 Packing and Dispatch - Visual - - - P R

Legends: V-Verify R-Review P-Perform W-Witness


Prepared by: Approved by: Customer Approval

Sign:
Name: Ms. Prachi Zagade Name: Mr. Anand Uttarkar