Saudi Aramco Test Report: Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 Nde

This ultrasonic test report documents the non-destructive examination of a weld overlay using ultrasonic testing. It provides details of the test procedure, acceptance criteria, and references applicable standards. The weld overlay was examined on a project for Saudi Aramco. The test procedure and results are documented in attachments to the report. Disbonding of more than 20% of the initial backwall reflection is considered unacceptable.

Uploaded by

nadeem shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
288 views9 pages

Saudi Aramco Test Report: Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 Nde

This ultrasonic test report documents the non-destructive examination of a weld overlay using ultrasonic testing. It provides details of the test procedure, acceptance criteria, and references applicable standards. The weld overlay was examined on a project for Saudi Aramco. The test procedure and results are documented in attachments to the report. Disbonding of more than 20% of the initial backwall reflection is considered unacceptable.

Uploaded by

nadeem shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.

00 30-Jun-18

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ATTACHMENT 1 - WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ATTACHMENT 1 - WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ATTACHMENT 1 - WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS)

SA Acceptance Criteria

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 NDE-


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ATTACHMENT 1 - WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Weld Overlay Ultrasonic Test Report SATR-NDE-2006 24-Jul-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

CALIBRATION BLOCK SKETCH & DETAILS (SEE ATTACHMENT 1):

OVERLAY/CLADDING METALLURGY & MATERIAL (SKETCH & DETAILS):

DISBOND ACCEPTANCE CRITERIA: The specimen shall be examined by UT. If the interface reflection is more than 20% of the initial
backwall reflection, disbonding is considered to have occurred. The UT test procedure is subject to approval by SA.
REMARKS:

REFERENCE DOCUMENTS: 1. ASME Sec V - Nondestructive Methods of Examination, (2004 Edition, July 2005 Addenda)
2. SAES-W-014, Weld Overlays and Welding of Clad Materials (29 September 2016)

ATTACHMENTS: Attachment 1 - WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Weld Overlay Ultrasonic Test Report SATR-NDE-2006 24-Jul-18 NDE-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Quality Record Approved:


Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 NDE


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ATTACHMENT 1 - WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS)

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 NDE


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ATTACHMENT 1 - WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS)

WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS) - Cladding Calibration Blocks

SA ACCEPTANCE CRITERIA

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU-24-July-2018 - REV.2018.06.00 (Standards Cutoff - June 30,2018) Rev.2018.06.00 30-Jun-18

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Ultrasonic Test Report (Weld Overlay UT Examination) SATR-NDE-2006 24-Jul-18 NDE


PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ATTACHMENT 1 - WELD OVERLAY UT EXAM (PROCEDURE REQUIREMENTS)

Saudi Aramco: Company General Use