1) The document is an abstract for the construction of an RCC road in different villages of Madi Taluka in Vadodara, Gujarat under a government fund for the year 2016-2017. 2) It includes 4 items - laying concrete foundation, controlled cement concrete, tremie machine finishing, and providing TMT bar reinforcement. 3) The total estimated cost for the project is Rs. 497,260.

Uploaded by

UJJWAL SUTHAR
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

R.c.c.road Estimate

1) The document is an abstract for the construction of an RCC road in different villages of Madi Taluka in Vadodara, Gujarat under a government fund for the year 2016-2017. 2) It includes 4 items - laying concrete foundation, controlled cement concrete, tremie machine finishing, and providing TMT bar reinforcement. 3) The total estimated cost for the project is Rs. 497,260.

Uploaded by

UJJWAL SUTHAR
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

NAME OF WORK ::- CONSTRUCTION OF R.C.C ROAD IN DIFF.

FALIYAS OF MADI
@ BIL Tal.VADODARA (PART-5)
G.P.FUND 2016-17
::- A B S T R A C T - ::
QTY. UNIT. ITEM,. RATE. PER. AMOUNT.
ITEM NO.1 ::-
Providing and laying cement concrete 1:3:6 (1
Cement : 3 Coarse sand: 6 Hand Broken stone
aggregates 40 mm nominal size) and curing
complete excluding cost of formwork in.
33.69 Cum. A) Foundation and Plinth. 2482.46 Cum. 83634.08
(R & B SOR P. No.9 Item No.5003 )

ITEM NO.2 ::-


Providing and laying controlled cement concrete
M-200 and curing complete excluding the cost of
formwork and reinforcement and reinforced
concrete work in.
87.36 Cum. A) Foundations, Footing, Base of Columns 3542.02 Cum. 309430.87
and Mass Concrete.
(R & B SOR P. No. 16 Item No.05024A )

ITEM NO.3 ::-


Add for Tremix Machine finishing for road incl. Vac.
87.36 Cum. Pump, Vibrator etc. complete. 750.00 Cum. 65520.00
(As per Market Rate )

ITEM NO.4 ::-


Providing ISI Mark TMT bar 415 Fe reinforcement
for R.C.C. work including binding and placing in
874.00 Kg. position complete upto floor two level. 44.25 Kg. 38674.50
(R & B SOR P. No. 13 Item No. 05014B )

TOTAL RS. 497259.44


SAY Rs. 497260.00
Add. Assistant Engineer Technically approved for
Taluka Panchayat Rs.497260.00 only
Vadodara and registered at serial no. ________
under T.O month ___________

Deputy Executive Engineer


R&B (panchayat) sub division
Vadodara
no. ________
NAME OF WORK ::- CONSTRUCTION OF R.C.C ROAD IN DIFF.FALIYAS OF MADI
@ BIL Tal.VADODARA (PART-5)
Measurment-sheet
ITEM NO.1 ::-
Providing and laying cement concrete 1:3:6 (1 Cement : 3 Coarse sand: 6 Hand Broken stone aggregates
40 mm nominal size) and curing complete excluding cost of formwork in.
A) Foundation and Plinth.
near nagin bhai shop 12.25 25.00 0.11 sr.11 = 33.69 Cum.
total 33.69 Cum.
ITEM NO.2 ::-
Providing and laying controlled cement concrete M-200 and curing complete excluding the cost of formwork
and reinforcement and reinforced concrete work in.
A) Foundations, Footing, Base of Columns and Mass Concrete.
laxmanbhai to jasubha 11.00 3.00 0.12 sr.16 = 3.96 Cum.
shiva jiva to jayanti gal 26.50 3.00 0.12 sr.15 = 9.54 Cum.
rama mohan to bhailal 35.00 3.00 0.12 sr.14 = 12.60 Cum.
vimlaben to bhikhabha 42.60 3.00 0.12 sr.11 = 15.34 Cum.
b/h o.head tank 25.00 3.00 0.12 sr.11 = 9.00 Cum.
near nagin bhai shop 12.25 25.00 0.10 sr.11 = 30.63 Cum.
suresh to ganpat hous 35.00 1.50 0.12 sr.17 = 6.30 Cum.
total 87.36 Cum.

ITEM NO.3 ::-


Add for Tremix Machine finishing for road incl. Vac. Pump, Vibrator etc. complete.
QTY.as above i.e 87.36 Cum.

ITEM NO.4 ::-


Providing ISI Mark TMT bar 415 Fe reinforcement for R.C.C. work including binding and placing in position
complete upto floor two level.
Considering 10Kg/cmt. 87.36 10.00 = 874.00 Kg.