Vp-15-109-001-A01-P-237-004ab-Sk-018 Lube-Oil Schematic and Bill of Materials (Steam Turbine)

This document is a lube-oil schematic and bill of materials for a steam turbine that is part of Kuwait National Petroleum Company's LPG Train-4 Project at their MAA Refinery. It was issued by Dongyang Chemical Pump Co. Ltd. on May 20, 2013 for approval by Daelim Industrial Co. as part of contract number CA/CSPD/0009.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views2 pages

Vp-15-109-001-A01-P-237-004ab-Sk-018 Lube-Oil Schematic and Bill of Materials (Steam Turbine)

This document is a lube-oil schematic and bill of materials for a steam turbine that is part of Kuwait National Petroleum Company's LPG Train-4 Project at their MAA Refinery. It was issued by Dongyang Chemical Pump Co. Ltd. on May 20, 2013 for approval by Daelim Industrial Co. as part of contract number CA/CSPD/0009.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

JOB TITLE : LPG Train-4 Project CONTRACT NO.

CA/CSPD/0009

OWNER : Kuwait National Petroleum Company DIC JOB NO. : 090768


VP-15-109-001-A01-P-237-
VENDOR : DONGYANG CHEMICAL PUMP CO., LTD. DOC. NO. :
004A/B-SK-018
P/O NO. : 090768-15-109-001-A01 ITEM NO. : P-237-004A/B/C

KNPC LPG Train-4 Project at MAA Refinery

DOCUMENT TITLE : LUBE-OIL SCHEMATIC AND BILL OF MATERIALS(STEAM TURBINE)

ISSUED

FOR APPROVAL MAY 20, 2013


DONDYANG
CHEMICAL
PUMP CO.
DAELIM INDUSTRIAL CO., LTD.
JOB NO. : 090768
A1 - APPROVED
A2 - APPROVED AS NOTED
A3 - RETURN FOR CORRECTION
NA - NOT APPLICABLE
SIGNED BY : DATE
DAELIM PERMISSION TO PROCEED OR REVIEW TAKEN ON VENDOR
PRINTS SHALL NOT RELIEVE VENDOR FROM ITS RESPONSIBILITIES
OR LIABILITIES UNDER THE PURCHASE ORDER.

TOTAL 2 PAGES

1 May / 20 / 13 For Approval IK.HONG JS.HAN MIN


0 Aug / 30 / 11 For Approval HWANG NAMGUNG MIN
REV. DATE DESCRIPTION PREPARED REVIEWED APPROVED