Seismic Load Analysis (As Per IS 1893 (Part 1) : 2002)
Seismic Load Analysis (As Per IS 1893 (Part 1) : 2002)
Where, Zone Factor of Kolkata, Z = 0.24 [From Table 2, for Zone 4 (severe)]
Importance Factor, I = 1 [From Table 6, for All other Buildings]
Response Reduction Factor = 3 [From Table 7, for Ordinary RC frame]
Now, I/R = 0.33 <1 [Hence OK]
Average Response Acceleration Co-efficient, Sa/g [From Clause 6.4.5, for Soft Soil sites]
{Where, Approximate Fundamental Natural Period of Vibration, Ta = (0.09h/√d)
[Clause 7.6.2]
Height of Building, h = 32.6 m
Base dimension of building = 17.5 m [Longer Frame]
Base dimension of building = 15.5 m [Shorter Frame]
So, Ta = 0.70 seconds [Longer Frame]
0.75 seconds [Shorter Frame]}
So, Sa/g = 2.38 [Longer Frame]
} [0.67 ≤ T ≤ 4.00]
2.2 [Shorter Frame]
Now, Design Lateral Force at ith floor, Qi = VBx(Wihi2)/(Wihi2) [As per Clause 7.7.1]
Calculation :
Column Shear -
Column Moments -
At Intermediate
Height of Portion At End Column(kNm)
Storey Column (kNm)
Floor (m) of Column
Joint A Joint D Joint B Joint C
2nd 3.2 Lower 296.66 296.66 593.32 593.32
1st 3.8 Upper 353.63 353.63 707.26 707.26
Beam Moments -
(i) Considering Equillibrium at Joint A :
MAU = 296.66 kNm
MAL = 353.63 kNm
MAB = MAU + MAL = 650.29 kNm
(ii) Considering Equillibrium at Joint B :
MAB = MBA = 650.29 kNm
MBU = 593.32 kNm
MBL = 707.26 kNm
MBA + MBC = MBU + MBL
So, MBC = 650.29 kNm
Beam Shear -
VAB =(MAB + MBA)/LAB = 260.12 kN
VBC =(MBC + MCB)/LBC = 216.76 kN
VCD =(MCD + MDC)/LCD = 289.02 kN
Calculation :
Column Shear -
Total Lateral Load At End Column (kN) At Intermediate Column (kN)
Storey
(kN) Joint E Joint I Joint F Joint G Joint H
2nd 945.65 118.21 118.21 236.41 236.41 236.41
1st 949.27 118.66 118.66 237.32 237.32 237.32
Column Moments -
Height of Portion At End Column(kNm) At Intermediate Column (kNm)
Storey
Floor (m) of Column Joint E Joint I Joint F Joint G Joint H
2nd 3.2 Lower 189.13 189.13 378.26 378.26 378.26
1st 3.8 Upper 225.45 225.45 450.90 450.90 450.90
Beam Moments -
(i) Considering Equillibrium at Joint E :
MEU = 189.13 kNm
MEL = 225.45 kNm
MEF = MEU + MEL = 414.58 kNm
Beam Shear -
VEF =(MEF + MFE)/LEF = 188.45 kN
VFG =(MFG + MGF)/LFG = 188.45 kN
VGH =(MGH + MHG)/LGH = 188.45 kN
VHI =(MHI + MIH)/LHI = 188.45 kN