SAP QM - How To Create Inspection Plan in SAP
SAP QM - How To Create Inspection Plan in SAP
An inspection plan in SAP is used created for different purposes such as inspection of model, inspection of
preliminary series, inspection of goods issues, inspection of materials, etc.
Transaction QP01
code
SAP Menu Path SAP Menu > Logistics > Quality Management > Quality Planning > Inspection Plan >
Create
Step 1: Execute the SAP transaction code QP01 in the SAP commend field.
Step 2: In next screen, “Create Inspection Plan: Initial screen” enter the following details:
Material: Enter material number for which you want to create inspection plan
Plant: Enter the plant code
After updating material and plant, press enter to continue.
Step 3: In next screen “Create Inspection Plan: Header Details” enter the following details
Step 4: In next screen, inspection plan create: task list overview, it displays an overview inspection plan with
task information and lot sizes of materials.
Click on operations option.
Step 5: In next screen, inspection plan create operation overview screen, enter the following details
Work center: Update the work center code for assign to inspection plan
Control key: Enter control key
After entering the work center and control key, click on save icon to save the configured details.
⊩ SAP QM Tutorial
⊩ Define Plant
⊩ Record results
SAP QM - QM in Procurement
⊩ An overview of QM in Procurement
⊩ QM at goods receipt
⊩ Controls in Procurement
SAP QM - QM in Production
⊩ Create routing
⊩ Create delivery
⊩ Goods issues
⊩ Maintain catalog
⊩ Define priorities