Production Department: Subros Audit Non-Confirmity Point
Production Department: Subros Audit Non-Confirmity Point
Rajeev Saxena /
3 No date mention on any Spool Coil for Traceability
Rajesh Yadav
Rajeev Saxena /
4 Part Packed with runner of Spool Coil 701 Rajesh Yadav
5 Daily Machine Checksheet not properly filled in Plant 113-114 Rajeev Saxena
3 RM Stock not properly as mention on Store Stock Board Ajay Saini / Vibhas
4 Shelf Life not maintain of any material In store Amit Chaddha Sir.
3 Fire Safety Training & Mock drill will be conducted by 3rd Party Brijesh
Daily
10.12.2021
10.12.2021
Daily C:\Users\admin\
Desktop\SUBROS\
Mold area 5S 113-
114. pptx
ch
11.12.2021 C:\Users\admin\
Desktop\SUBROS\
RM LOCATION IN
113-114.pptx
11.12.2021 C:\Users\admin\
Desktop\SUBROS\
TO AVOID MIXING
IN RM 113-114 -
Copy.pptx
11.12.2021 To Add Nylon 66 30%GF C:\Users\admin\
Desktop\SUBROS\
RM LOCATION IN
113-114. pptx
11.12.2021 C:\Users\admin\
Desktop\SUBROS\
RM LOCATION IN
113-114.pptx
11.12.2021
WhatsApp Image 2021-12-13 at 5.03.08 PM (1).jpeg
RM To be Arranged of Nylon 66
13.12.2021
30% GF
d Control
Updated in Next MRM Add these points in OLD MRM
IATF Roadmap
Mid Jan
QSP-18, FMEA
Procedure..doc
11.12.2021 C:\Users\admin\
Desktop\SUBROS\
RM & BOP
APPROVED
SUPPLIER LIST. xlsx
Policy to be Arranged by
Manesar
Presentation1.pptx