K R PULP & PAPERS LIMITED APR- 2021 – Till now
Shift Engineer (30 mw power plant)
➢ Here I am looking 30 MW power plant as a shift incharge and also looking the paper plant
in which pulp area, recovery area, paper m/c area, ETP area, caustesizing area, bio gas plant
area are involved.
➢ maintenance and troubleshooting of all electrical panel, transformer, servo, VCB, ACB, APFC panel, MCC panel, DOL panel,
VFD, and 30 MW turbine (12 mw + 18 mw), ESP Area.
➢ 33kv/11kv substation’s maintenance HT line supervision and maintenance.
➢ Earth testing and earth pith installation
➢ HT cable meggering and testing
➢ ESP operation and maintenance .
➢ Turbine synchronization and governing system
➢ Lube oil system of turbine.
➢ Lift troubleshooting and maintenance.
➢ Leading and co-ordinate to electrician and asst. engineers.
➢ Breakdown maintenance of electrical equipment, machines and panel.
➢ power consumption report, daily break down record, daily routine at work place. Maintain master data of electrical
motors etc.
➢ DCS panel connection, maintenance and troubleshooting.
➢ All type sensors proximity, capacitive, PNP & NPN , level sensor, pressure sensor, ultrasonic sensor, photovoltaic sensor ,
transitive sensor are calibration and maintaining.
➢ Load cell calibrating and troubleshooting.
➢ Utility sector work also take care in which compressor maintenance, boiler operation & maintenance, boiler troubleshooting
etc.
➢ Planning and execution of all type of maintenance preventive, predictive, break down and shut down maintenance.
➢ ACB maintenance and setting knowledge
Executive maintenance
Skills
• understanding and drawing the single line diagram and control diagram of panel.
•Troubleshooting and maintenance of control panel EB bill and TOD analysis
• Team leading, coordinating supporting. Production planning and controlling
• Word pad, power point presentation , MS word etc. EXCEL preparing and presenting
• Connection of Star delta with timer and connection of DOL starter.
• Preparing of Control diagram and power diagram Basic computer.
• Coding in C language
• PLC troubleshooting, operation and maintenance
Project
Project name : suguna food pvt. Ltd.
Category : feed mill installation project
Designation : Electrical Executive maintenance
Project manager: viswanth j
Project duration: 1 years
Project Location: safidon, jind, Hariyana
My work profile at work place:
I am responsible to install All electrical machines, motor , panel and equipment in which major equipment are below
• Transformer connection and earthing.
• On line Tap changer (OLTC) panel connection with transformer.
• MCC panel commissioning in which major part are
• Air circuit Breaker (ACB), Bus bar etc.
• Load circuit Breaker (LBS) Are installed in which 11kv fuse are assembled for protection.
• Main Meter panel connection.
• Automatic power factor control (APFC) panel are installed.
• Control panel are installed for all industrial motors and machinery, main part of control panels are:
• Variable frequency drives (VFD) for heavy motor.
• Direct on line (DOL) panel.
• Programmable logic control (PLC) panel wiring and commissioning etc.
Languge