0% found this document useful (0 votes)
58 views

MR Sandeep

1) The document provides details of Sandeep's educational qualifications, work experience, skills, and a project he worked on. 2) Sandeep has a B.Tech in Electrical Engineering and worked as a Shift Engineer and Executive Maintenance at two companies over the past few years. 3) His experience includes maintenance of electrical equipment, panels, motors, and troubleshooting at both industrial plants and a 30MW power plant.

Uploaded by

Sameer NS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

MR Sandeep

1) The document provides details of Sandeep's educational qualifications, work experience, skills, and a project he worked on. 2) Sandeep has a B.Tech in Electrical Engineering and worked as a Shift Engineer and Executive Maintenance at two companies over the past few years. 3) His experience includes maintenance of electrical equipment, panels, motors, and troubleshooting at both industrial plants and a 30MW power plant.

Uploaded by

Sameer NS
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

VILL - THATWAIN, POST - MAJHGAIN DIST - CHANDAULI STATE - UTTAR

PRADESH PIN CODE - 232111


7887257942 | [email protected]

Objective
I seek challenging opportunities where I can fully use my skills for the success of the organization.

Educational details

S.N Qualifications University Marks year


.
B.TECH (ELECTRICAL
1 ENGINEERING) BBD NITM 73.70% 2019

2 INTERMEDIATE U.P BOARD 74.70% 2014

3 HIGH SCHOOL U.P BOARD 78.90% 2012

Experience
K R PULP & PAPERS LIMITED APR- 2021 – Till now
Shift Engineer (30 mw power plant)

➢ Here I am looking 30 MW power plant as a shift incharge and also looking the paper plant
in which pulp area, recovery area, paper m/c area, ETP area, caustesizing area, bio gas plant
area are involved.
➢ maintenance and troubleshooting of all electrical panel, transformer, servo, VCB, ACB, APFC panel, MCC panel, DOL panel,
VFD, and 30 MW turbine (12 mw + 18 mw), ESP Area.
➢ 33kv/11kv substation’s maintenance HT line supervision and maintenance.
➢ Earth testing and earth pith installation
➢ HT cable meggering and testing
➢ ESP operation and maintenance .
➢ Turbine synchronization and governing system
➢ Lube oil system of turbine.
➢ Lift troubleshooting and maintenance.
➢ Leading and co-ordinate to electrician and asst. engineers.
➢ Breakdown maintenance of electrical equipment, machines and panel.
➢ power consumption report, daily break down record, daily routine at work place. Maintain master data of electrical
motors etc.
➢ DCS panel connection, maintenance and troubleshooting.
➢ All type sensors proximity, capacitive, PNP & NPN , level sensor, pressure sensor, ultrasonic sensor, photovoltaic sensor ,
transitive sensor are calibration and maintaining.
➢ Load cell calibrating and troubleshooting.
➢ Utility sector work also take care in which compressor maintenance, boiler operation & maintenance, boiler troubleshooting
etc.
➢ Planning and execution of all type of maintenance preventive, predictive, break down and shut down maintenance.
➢ ACB maintenance and setting knowledge

Suguna foods pvt. Ltd oct-2019 – Apr-2021

Executive maintenance

➢ In suguna I was posted here as a Executive maintenance in electrical department


➢ there I had been looking all electrical equipment, tools, motor, panel , DG , transformer, LBS and servo etc.
➢ Troubleshooting and maintaining all electrical panels on load tap changer panel (OLTC PANEL), automatic power factor
controller panel (APFC PANEL), direct on-line panel (DOL PANEL) etc.
➢ Plant operation and maintenance, PLC controlling and troubleshooting. SCADA operation and troubleshooting.
➢ All type sensors proximity, capacitive , PNP & NPN , level sensor, pressure sensor, ultrasonic sensor, photovoltaic sensor ,
transitive sensor are calibration and maintaining.

Skills
• understanding and drawing the single line diagram and control diagram of panel.
•Troubleshooting and maintenance of control panel EB bill and TOD analysis
• Team leading, coordinating supporting. Production planning and controlling
• Word pad, power point presentation , MS word etc. EXCEL preparing and presenting
• Connection of Star delta with timer and connection of DOL starter.
• Preparing of Control diagram and power diagram Basic computer.
• Coding in C language
• PLC troubleshooting, operation and maintenance

Project
Project name : suguna food pvt. Ltd.
Category : feed mill installation project
Designation : Electrical Executive maintenance
Project manager: viswanth j
Project duration: 1 years
Project Location: safidon, jind, Hariyana
My work profile at work place:
I am responsible to install All electrical machines, motor , panel and equipment in which major equipment are below
• Transformer connection and earthing.
• On line Tap changer (OLTC) panel connection with transformer.
• MCC panel commissioning in which major part are
• Air circuit Breaker (ACB), Bus bar etc.
• Load circuit Breaker (LBS) Are installed in which 11kv fuse are assembled for protection.
• Main Meter panel connection.
• Automatic power factor control (APFC) panel are installed.
• Control panel are installed for all industrial motors and machinery, main part of control panels are:
• Variable frequency drives (VFD) for heavy motor.
• Direct on line (DOL) panel.
• Programmable logic control (PLC) panel wiring and commissioning etc.

Languge

Hindi and English

Personal details
Name - Sandeep
Father - Jay Prakash Singh
DOB - 15/03/1996
Marital status - unmarried
Mo. No - +917887257942
Mail Id - [email protected]

SANDEEP

You might also like