Traction - Defect & Failure - Up To 04.02.20
Traction - Defect & Failure - Up To 04.02.20
Phase
I&II or III
Micom P 521
MVCB 12- P 521 Schneider MVCB 12- P 521-- RELAY OK. BUT COMMUNICATION FAIL
1 70 2 I&II GTB ASS 1 RELAY 24.07.18 1430H
MVCB 13- P122 Micom P 122 MVCB 13- P122-- HMI BUTTON NOT WORKING.
Schneider
Micom P 521
2 71 2 I&II GTB ASS 2 RELAY 24.07.18 1430H MVCB 21 - P 521-- HMI BUTTON & DISPLAY NOT WORKING.
MVCB 21 - P 521 Schneider
Micom P 122
3 72 2 I&II GTB ASS 3 RELAY 24.07.18 1430H MVCB 24 -P122-- HMI BUTTON & DISPLAY NOT WORKING.
MVCB 24 -P122 Schneider
4 75 2 I&II VS ASS N RELAY AB 221 - 7SJ6021 SIEMENS 24.07.18 1430H AB 221 - 7SJ6021 -- SERVICE LED NOT GLOWING.
SIPROTECH,
5 76 2 I&II CL ASS S RELAY AB 226 - 7SJ62 24.07.18 1430H AB 226 - 7SJ62 -- HMI PROBLEM, RESTARTS AUTOMATICALLY
SIEMENS.
7 80 2 I&II CHCK ASS N RELAY AB 241 - 7SJ6021 SIEMENS 24.07.18 1430H AB 241 - 7SJ6021 -- SERVICE LED NOT GLOWING
9 83 2 I&II NDI ASS N RELAY AB 257- 7SD6001 SIEMENS 24.07.18 1430H AB 257- 7SD6001 -- SERVICE LED NOT GLOWING.
10 85 2 I&II RCK ASS N RELAY AB 263 - 7SJ6021 SIEMENS 24.07.18 1430H AB 263 - 7SJ6021 -- SERVICE LED NOT GLOWING.
AB 262 - 7SJ62
AB 262 - 7SJ62 -- HMI NOT WORKING (NO DISPLAY)
AB 262 - 7SD6001
AB 262 - 7SD6001 -- SERVICE LED NOT GLOWING
11 86 2 I&II RCK ASS S RELAY AB 264 - 7SJ6021 SIEMENS 24.07.18 1430H
AB 264 --7SJ6021 -- SERVICE LED NOT GLOWING.
AB 266 - 7SJ62
AB 266 - 7SJ62.-- RELAY UNHEALTHY
AB 266 - 7SD6001
AB 266 - 7SD6001 -- SERVICE LED NOT GLOWING
Micom P 521
12 88 2 I&II CTST ASS N RELAY MVCB 12- P521 24.07.18 1430H MVCB 12- P521 -- COMMUNICATION ALARM
Schneider
AB 276 - 7SJ62 AB 276 - 7SJ62 -- ERROR LED GLOWING & HMI NOT WORKING
13 89 2 I&II CTST ASS S RELAY SIEMENS 24.07.18 1430H
MVCB 22- 7SJ62 MVCB 22- 7SJ62 -- ERROR LED GLOWING
Micom P 521
MVCB 14 - P521 Schneider MVCB 14 - P521 - DISPLAY NOT WORKING.
21 100 2E I&II SKT ASS 3 RELAY 24.07.18 1430H
MVCB 3- P111 MICOM P111 MVCB 3- P111 - DISPLAY HANGED.NFORMED TO RELAY TEAM.
SCHNEIDER
MICOM P111
22 106 2E I&II UDB ASS-1 RELAY MVCB-1 28.07.18 1000H O/C PROTECTION RELAY (P111) IS SHOWING TRIP IN SCADA.
SCHNEIDER
Micom P 521
23 147 2E I&II UB ASS-2 RELAY MVCB-22 08.09.18 1600H LINE DIFF. RELAY IS IN HANGED POSITION.
Schneider
Micom P 521
24 148 2E I&II INA ASS-1 RELAY MVCB-11 08.09.18 1600H LINE DIFF. DISPLAY IS NOT WORKING.
Schneider
Micom P 521
25 149 2E I&II MVNR ASS 1 RELAY MVCB-11 08.09.18 1600H LINE DIFF. RELAY CARD BURNT.
Schneider
Micom P 521
26 150 2E I&II JB ASS-1 RELAY MVCB-13 08.09.18 1600H LINE DIFF. RELAY COMMUNICATION FAILED.
Schneider
Micom P 521
27 151 2E I&II INA ASS-1 RELAY MVCB-13 08.09.18 1600H LINE DIFF. RELAY COMMUNICATION FAILED.
Schneider
Micom P 521
28 152 2E I&II INA ASS-2 RELAY MVCB-13 08.09.18 1600H LINE DIFF. RELAY COMMUNICATION FAILED.
Schneider
Micom P 521
29 153 2E I&II HKS ASS-3 RELAY MVCB-3 08.09.18 1600H OC/EF RELAY DISPLAY IS HANGED.
Schneider
66 KV BUS BAR DIFFERENTIAL RELAY REB-500 IS FAULTY. ABB
MAKE REB 500 (BUS BAR DIFFERENTIAL ) RELAY WAS CHECKED AS
HMI WAS NOT WORKING. UPON INSPECTION IT WAS FOUND THAT
CENTRAL PROCESSING UNIT IS FAULTY AND IT NEEDS TO BE
30 168 2 I&II ND RSS RELAY REB 500 ABB 27.09.18 1745H
REPLACED.
REB 500 FROM STORE WAS ISSUED BUT IT IS NOT COMPLETE UNIT
AND REB 670 RELAY MUST BE INSTALLED.
AB 216 RESTRICTED EARTH FAULT RELAY OPERATED ALARM
31 200 2 I&II VV ASS S RELAY AB 216 REF SIEMENS 2200H
COMING FREQUENTLY IN SCADA.
33 211 2 I RCK ASS SOUTH RELAY AB 266 NA 24.11.18 2100H AT RCK ASS SOUTH AB 266 NOT CLOSE FROM OCC.
37 320 I MB ASS RELAY I/C-1 ABB 04.07.19 12:00:00 33KV I/C-1 OF MB ASS IS GETTING TRIPPED.
COLOURATION OF RISE, SPBI, BIMR ASS & JGPI RSS TURNS RED ON
38 332 2 III RISE ASS SCADA BUS COLOURATION NA 21.07.19 1400H
APPLICATION OF EARTH SWITCH IN RISE ASS.
ISOLATOR DC LIS 23-1, 23-2, 24-1, 24-2 DC CONTROL SUPPLY SHOWING FAIL.
39 354 2 II JGPI RSS PSI/RELAY/SCADA NA 29.12.19 1030H
SUPPLY NORMAL IN FIELD & LOCAL SCADA.
44 387 2 II AHNR ASS PSI BATTERY BANK NA 15.12.19 2000H 10 NO. CELLS FOUND FAULTY DURING BATTERY LOAD TEST.
47 454 2E II QM ASS PSI IT-11 ABB 01.01.2020 0228H IT-11 FAILS TO CLOSE THROUGH SCADA.
FAULT
REMARKS/RECTIFICATION DETAIL TDC -1 TDC-2
CATEGORY
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
DECISION ON REPLACEMENT OF REB-500 WITH REB-670 IS BE TAKEN BY RELAY TEAM. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. C 20.08.19 31.03.2020
JOINTLY CHECKED WITH PSI STAFF. NO PROBLEM FOUND AT RTU END. 110 VDC NOT AVAILABLE
C 20.08.19 31.03.2020
FROM BREAKER END.
Tender for the work has been awarded to M/S K.V. Pratik on dated 01.11.19. Work couldn't be started due to
ban on construction by NGT. Permission for the same has been uploaded to GSDL. Permission letter has also
been sent to IGL, DCP (Traffic) and DJB on 27.12.19. A Joint inpsection of restoration site was carried out with C 20.02.2020 NA
JE/Works/PWD and JE/PSI on 25.01.2020. The permission letter has been forwarded from JE office to
divisional office of PWD for further action.
As per ASE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
a) PT and CT wiring of this relay checked and found normal as per drawing.
C 20.08.19 31.03.2020
b) Relay trips when its PT healthy only i.e only in cable charging condition with out any current flow in the relay.
Where as per relays function when current flow in opposite direction than the relay should trip.Therefore for
confirmation the reverse power relay of I/C-3 connect in I/C-1 and found normal no tripping occurs. So new
relay required for this.
INFORMED TO ASE/ SCADA AND PROBLEM SIMULATED. ABB ENGINEER WILL VISIT FOR
C 15.11.19 31.03.2020
CONFIGURATION OF COLORATION SCHEME.
AS PER JE/PSI IT IS NORMAL IN FIELD & LOCAL SCADA. INFORMED TO SCADA STAFF FOR
RECTIFICATION.CHECKED BY ASE/SCADA ON 29.12.2019. CHECKED IN LOCAL SCADA AT RSS. THE
VC 15.02.2020 NA
SIGNALS ARE CONFIGURED IN LOCAL SCADA BUT NO WIRING IS AVAILABLE FROM FIELD. Wiring to
be done by PSI staff
INFORMED SCADA STAFF FOR RECTIFICATION. NO PT HAS BEEN CONFIGURED AT MKPR BAY.
HENCE IT IS NOT POSSIBLE TO CONFIGURE THE COLORATION WHEN CABLE IS CHARGED FROM C 31.03.2020 NA
MKPR.
CHECKED BY RELAY TEAM .RELAY Micom C434 FOUND FAULTY. Procurement of the same relay is under
progress. Requirement has been sent to M/S Schneider and they have told that instead of this relay, another
VC 15.02.2020 NA
compatible relay with same configuration will be provided. Engineer from M/s Schneider visited ND RSS on
20.01.2020 and downloaded configuration data from healthy relay for further action.
CHECKED BY SM/PSI. REPORTED FAULTY MICOM P122 RELAY. RELAY TEAM INFORMED. C 15.02.2020 NA
INFORMED TO JE/PSI. Procurement of battery bank is under progress from L-2 Extension. Same will be
C 15.02.2020 NA
rectified after procurement
INFORM TO PSI AND SCADA TEAM . TO BE CHECKED JOINTLY WITH RELAY TEAM. C 15.02.2020 NA
INFORMED TO HM/PSI. CHECKED BY JE/PSI & INFORMED THAT OPEN POSITION CAN'T BE RELIED
UPON. TO BE JOINTLY CHECKED BY PSI & SCADA IN NIGHT OF 26-27/DEC. ON 27.12.19, Mechanical
operation of BM246 done with handle and found normal. Checked the problem of BM246 at AZU/SP and found
that it's closing capacitors (03No.) are faulty. (Shows 1volt at capacitor terminal.) Control unit ready indication
not glows in card. Also check the closing and tripping coil continuity at control card, found that tripping coil
gives continuity where as closing coil did not. So checked the same at snubber card input, found normal but at
output it shows high resistance. Problem will be attended in next block with all required material. On 08.01.20,
Control unit of BM-246 has been replaced with new but problem not rectified. On 16.01.20, Check the
operational problem of BM246 and found that even breaker is in Off condition in control unit it shows breaker
VC 07.02.2020 NA
ON. Same was checked and found that one wire disconnect from X0 control cable plug in top mechanical box.
As the wire was not connected in that place , so new wire was connected from mechanical box to control box.
Trip circuit healthy indication not glows in the control card, tripping circuit was checked and the TCH indication
problem rectified. As all indications were proper reflect in control card after that operation of BM checked and
found that it's operation was normal. But it not hold in the closing position. Tried for It's mechanical adjustment
but not completed due to time boundation. On 20.01.2020, Mechanical adjustment of pole assembly was
changed and its operation was checked at different adjustments and found that after one or two operations
pole stuck in intermediate position. It's close operation done normally but its open operation not done normally.
Problem still persists not rectified.
SM 3310 &
1 3 I NFD FP SCADA ABB
SM 3311
66 KV CABLE
3 3 I DW RSS PSI
TERMINATION
4 3 I NFD FP SCADA/PSI SM -
3 SCADA/PROJE
6 II NSFT-NCC BUS BAR _
EXT CT
3 SCADA/PROJE
7 III NECC FP PT 377 & 378 _
EXT CT
SCADA/PROJE
10 9 III NFGH SSP PT06
CT
SCADA/PROJE
11 9 III NFGH SSP BM907
CT
PSI/SCADA/PR
12 9 III DWSG FP BM901
OJECT
TELECOM/SCA
13 3 II GEC ASS COMMUNICATION ABB
DA
BUS BAR
18 3E III NECC SDG SCADA NA
COLORIZATION
SCADA/PROJE
23 9 III NFGH SSP PT05
CT
3 SCADA/PROJE
24 III NECC FP FEEDER CB _
EXT CT
PSI/SCADA/PR
25 9 III DWSG FP BM902 Megawin
OJECT
28 3 I PN SS SCADA PT-311 NA
Categorization
REMARKS/RECTIFICATION DETAILS TDC - 1
Code
same closed C
TDC-02 :
15.12.2019
TDC-02 : not
given by
Telecom
TDC-02 :
18.05.19
TDC-02 :
15.12.2019
FAILURE/DEFECT LIST OF LINE-05 UP TO 0600H OF 05.02.2020
132KV , 100VA B Phase VTC 504 is unfit due to variaster B- phase VTC has been taken out by CGL personnel for
found melted of B Phase 132 KV bay-02. Removed faulty B
3 5 3 BGZ RSS PSI VTC 504, C- phase CGL 24.11.18 0400h
phase vtc on 24.11.18, and fitted C phase VTC but now C
its rectification work and C phase VTC Fitted in B Phase VC 31.12.19
phase circuit is with out VTC circuit after received B phase VTC it will be fitted
PSI/SCA
4 5 2 MIUDK RSS LCB-51 CGL 17.11.19 21:49:00 Protection DC-1 of LCB-1 showing Fail In SCADA Same infommed in SCADA and PSI Staff NC
DA
33KV COMPLETE CKT. COLORATION NOT WORKING AMC GIVEN TO ABB. NOW IT WILL BE DONE BY ABB
5 5 3 MIA-CIPK SCADA 33KV RING ABB 16.12.19 1100H C 25.02.20
FROM MIA/ASS TO CIPK/ASS . UNDER AMC. INFORMED ON DATED 27.01.2020
24 6 II STVR TSS PSI SP605 B & SP-607B S&S 03.10.19 0505H SM-607 became intermediate while SAME INFORMED TO PSI STAFF C
open in the field . Verified by PSI s taff
35 6 III BVHM ASS PSI LVCB-2 SIEMENS 19.11.19 0100H LVCB-2 NOT CLOSING FORM SCADA INFORMED TO PSI SATFF C
43 6 III LLQA ASS1 PSI MVCB-11 SIEMENS 03.12.19 0300H MVCB 11 NOT CLOSING REMOTELY. SAME INFORMED TO SCADA & PSI STAFF C
MVCB-13 IS COLSED IN THE FIELD SAME INF ORMED TO SCAD A AND PSI STAFF. SCADA
48 6 II CTST ASS-3 PSI MVCB 13 AREVA 12.12.19 0100H AS VERIFIED BY PSI STAFF BUT C
STAFF CHECKED FOUND OK FROM THEIR END
SHOWIN G OPEN IN SCSD A
53 6 III SRAI SP PSI BM-652 MEGAWIN 18.12.19 0800H GETTING INTEMDEIATE IN CLOSED SAME INFORMED TO PSI STAFF FOR MANNING C
CONDITION
SM-604 became intermediate while
54 6 II STVR/SSP PSI SM-604 ABB 18.12.19 1600H SAME INFORMED TO PSI STAFF C
close in the field .
PIT SAME PIT SAME PIT SAME PIT SAME PIT SAME PIT SAME
BM622 BM622 BM622 BM622 BM622 BM622
While giving clos e command to MVCB-2 KG C OMM INFOR KG COMM INFOR KG COMM INFOR KG COMM INFOR KG COMM INFOR KG COMM INFOR
E,BM 6 E,BM6 E,BM6 E,BM6 E,BM6 E,BM6
at KM ASS-2, Iis was s howing c lose in SSP- SIEME AND MED SSP- SIEME AND MED SSP- SIEME AND MED SSP- SIEME AND MED SSP- SIEME AND M ED SSP- SIEME AND MED
55 6 II KM ASS-2 PSI MVCB-2 AREVA 23.12.19 0054H SAME INFORMED TO SCADA & PSI STAFF C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C
SCADA, while actual it is was open in CTST BM604 NS N OT TO CTST BM604 NS NOT TO CTST BM604 NS NOT TO CTST BM604 NS NOT TO CTST BM604 NS NOT TO CTST BM604 NS NOT TO
field end. SP WORKI SCADA SP WORKI SCADA SP WOR KI SCADA SP WORKI SCADA SP WORKI SCADA SP WORKI SCADA
E E E E E E
NG STAFF NG STAFF NG STAFF NG STAFF NG STAFF NG STAFF
CB-627 NOT OPENING FROM SCADA
& ELECTRIC ALLY AT LOCAL. SAME
56 6 III FBD/TSS PSI CB-627 MEGAWIN 24.12.19 0500H INFORMED TO PSI SATFF VC
OPENED BY OPERATOR WITH
HANDLE
66 6 II STVR TSS PSI CB 609 ABB 02.01.20 0400H CB 609 NOT closing locally and scada SAME INFORM TO PSI STAFF C
73 6 III AJDD FP PSI PT-670 MEGAWIN 23.01.20 1010H SHOWIN G PT VOLTAGE 2.27KV SAME INFORMED TO PSI SATFF NC
AFTER CLOSING SM670
74 6 III BVHM SSP PSI/SCADA BM-670 MEGAWIN 24.01.20 0400H NOT OPERATING TROUGH SCADA SAME INFORMED TO PSI SATFF C
75 6 II METE FP SCADA BM615 MEGAWIN 27.01.20 0300h BM 615 is not getting opened through VC
SCADA. Local operation normal .
BM-603 AT LJPN SSP SHOWING SAME INF FORMED T O PSI SHIFT INCHARGE , LINE
76 6 II LJPN SSP PSI/ SCADA BM-603 MEGAWIN 28.01.20 0918H VC
INT ERMEDIATE IN SCADA, INCH ARGE, MNGR TR - 6 MAD SCADA ST AFF
77 6 III FBD RSS PSI SP627B UNISTAR 29.01.20 0125H ISOLATOR COULD NOT BE OPENED. C
SP 631 B UNIVERSAL
FAILURE/DEFE
FAILURE
SN LINE Phase POST/ LOCATION DEPARTMENT EQUIPMENT MAKE /MODEL
DATE TIME
DC CONTROL
1 APL II 13.5 SSP PSI SUPPLY CABLE POLYCAB 15.07.19 0:00
CKT-2
DC CONTROL
2 APL II 11.3 NS PSI SUPPLY CABLE POLY CAB 02.09.19 2200h
CKT-1
FAILURE/DE
RECTIFICATION
DESCRIPTION OF FAILURE
DATE TIME 1. As per ASE/psi total 127Mtrs DC
cable(2C,120sq mm cu. Armoured)
theft between ch 13536-13663. DC
source ckt-2 (13.5ssp)
2. On 07 Oct As per ASE/psi total
approx 1350 Mtrs DC cable(2C,120sq
mm cu. Armoured) missing between
CH-10400 & 11100 AND CH-10200 &
9550
communication of 11.3 NS fail.
As per JE/psi total 200Mtrs DC
cable(2C,120sq mm cu. Armoured)
theft between ch 11300-11100. DC
source ckt-1
At 00:05 hrs CISF and Delhi police staff found 4 no's cable piece near Piller no
253, Ch 13000. Reached at site with OHE & PSI staff by BDV and found approx
200 meter's 33kV 240 SQ mm cable have 4 no's piece in jungle area. All 4 no's
33kV cable piece rolled and kept in BDV with Delhi police staff. All 4 no's 33kV
cable bundle take over by Delhi police staff and shifted to DACY Metro Police
station for further investigation.OHE staff fault indentified that 33kV B phase VC
cable cut between mast no 12/63 to 13/15 at UP line viaduct approx 200
meter's. ONn dated 27.01.20 during 33KV
Cable route foot patrolling from Neutral section to Ch-14000 UP line and found
240 sq mm 33 kV B phase cable theft between Mast no 12/63 - 13/21 (Ch
13200- Ch 13300) . approx 100mtrs cable.
ON DATED 24.07.19
BMA 34,35,36
FAILURE
CONVERTED IN DC
31.07.19 31.12.19 CABLE FAILURE AS
COMMUNICATION
NORMALIZED
THROUGH CKT-1
NA NA NA
BUS
1 7 III MKPR RSS SCADA SIEMENS 30.04.18 10:00
COLORISATION
2 7 III PBGW SSP SCADA RTU L/R STATUS SIEMENS 06.08.18 16:00
NAVR ASS1,
BATTERY
3 7 III BKCP ASS1, SCADA HBL 09.08.18 13:00
VOLTAGE
LJPN ASS 2
NAVR,NSHP, RELAY
4 7 III SAKP,RG,NAV SCADA COMMUNICATION SIEMENS 09.08.18 13:00
R,DDSC ASS STATUS
KKDA ,JEE
23 7E III PSI/SCADA LT CHANGE OVER SIEMENS 03.03.19 04:35:00
ASS
RELAY
24 7 III NIZM SCADA COMMUNICATION SIEMENS 13.04.19 14:20
STATUS
MKPR SSP
25 7 III SCADA RTU SIEMENS 15.08.18 07:00:00
&FP
WC & JFRB
28 7 III SCADA/PSI LVCB 1 SIEMENS 20.05.19 07:00:00
ASS
33 KV BUS BUS
35 7 III SCADA SIEMENS 11.07.19 09:40:00
BAR COLOURSATION
ALL FEEDRERS
37 7E III VNNR TSS SCADA/PSI SIEMENS 20.07.19 05:00:00
PT
FP
39 7 III MKPD FP SCADA COLOURISATION SEIMENS 02.08.19 12:30:00
& PT
25 KV CABLES OF
54 7E III VNNR TSS PSI SIEMENS 01.10.19 05:00:00
CB-733, 737
STAND BY
59 7E III GKPR ASS PSI SIEMENS 23.10.19 08:30:00
CHARGER
STAND BY
60 7E III VNNRD2 PSI SIEMENS 23.10.19 08:30:00
CHARGER
NARAINA
70 7E III KKDC ASS PSI PT (MVCB-11) 12.11.19 22:30:00
POWER TECH.
ALL FEEDRERS
72 7 III INA TSS SCADA/PSI SIEMENS 21.11.19 01:10:00
PT
CB-
87 7 III INA TSS SCADA SIEMENS 31.12.19 05:00:00
719,721,723,725
LVCB-1,2 AND
95 7E III ANVT PSI/SCADA OMEGA(L&T) 18.01.20 8:40:00
LVCCB
97 7E III VND TSS SCADA CB-714 & SP-714 SEIMENS 23.01.20 17:35
LIS702-1,LIS702-
2,CCB-701,CCB-
100 7 III MKPR RSS SCADA MEGAWIN 28.01.20 1:00
702,SP-702, CB-
702
29.01.202
101 7 III RG FP PSI CB 757 MEGAWN 4:23
0
01.02.202
102 7 III MKPD FP PSI/SCADA SM-J KIRON 18:00:00
0
02.02.202
103 7 III INA TSS PSI/SCADA CB-727 & CB-729 MEGAWN 01:05:00
0
DATE TIME
SCADA
TESTING FOR
SAME IS
SCADA
PENDING AND
TESTING FOR
COMMUNICAT
SM NC 15.02.19 20.03.19 15.08.19 SAME IS
ED TO
PENDING AND
SCADA TESTING FOR SAME IS PROJECT FOR
COMMUNICAT
PENDING AND COMMUNICATED TO C 15.02.19 15.03.19 15.08.19 ITS
ED TO
PROJECT FOR ITS RECTIFICATION RECTIFICATIO
PROJECT FOR
N
ITS
RECTIFICATIO
N
INFORMED TO
INFORMED TO SCADA/PSI STAFF. VC 15.02.19 15.03.19 15.08.19 SCADA/PSI
STAFF.
FAULTY DIFF
RELAY TAKEN
OUT BY
TO BE ATTENDED BY PSI/SCADA
VC 15.02.19 15.08.19 SIEMENS
STAFF.
PROJECT FOR
RECTIFICATIO
N. DIFF
FAULTY
RELAY TAKEN
OUT BY
TO BE ATTENDED BY PSI/SCADA
VC 15.02.19 15.08.19 SIEMENS
STAFF. INFORMEDFOR TO
PROJECT
SCADA STAFF
RECTIFICATIO
INFORMED TO SCADA/PSI STAFF. VC 15.02.19 15.03.19 15.08.19 FORN.ITS
RECTIFICATIO
TO BE
N.
ATTENDED BY
INFORMED TO PSI STAFF. 15.02.19 15.08.19
SCADA/ PSI
STAFF.
INFORMED TO
TO BE ATTENDED BY PSI STAFF. C 15.02.19 15.03.19 15.08.19
SCADA TEAM.
TO BE
INFORMED TO ALL CONCERNED.. NC ATTENDED BY
SIEMENS
TO BE ATTENDED BY PSI/SCADA
VC 15.02.19
STAFF.
JLA ASS-KIKJ
4 8 III PSI
ASS
SKVR SSP-SABR
17 8 III SCADA
SS
RKPM FP &
56 8 III SCADA
PLAM FP
DSHP,PLAM,IGD
60 8 III A & KJMD ASS PSI/SCADA
1&2
SABR,,MIRK &
61 8 III PSI/SCADA
PSPK ASS-1&2
AUTO/MANUAL OF
MEGAWIN 25.06.18 1:00:00
BM837
PT OF CB
MEGAWIN 03.05.2019 00..35
885,886,887,888
06.02.20 01:15:00
T OF LINE-08 UP TO 06.02.2020
DESCRIPTION OF FAILURE
31.10.2
13.02.19 10.04.19
018
20.10.2
20.02.19 12.04.19
018
31.10.2
10.12.2018 10.04.19
018
20.10.2
10.12.2018 10.04.19
018
20.10.2
15.02.19 10.04.19
018
20.10.2
16.02.19 10.04.19
018
20.10.2
16.02.19 12.04.19
018
20.10.2
15.02.19 10.04.19
018
20.08.2
16.02.19
018
31.10.2
16.02.19 12.04.19
018
31.10.2
16.02.19 10.04.19
018
31.10.2
16.02.19 10.04.19
018
31.10.2 ON DATED
30.12.18
018 16.10.18, AS
PER SCADA
STAFF,
AUTO/MANUA
31.10.2 L CANNOT BE
018 PROVIDED AT
KJMD SSP AS
31.10.2 PT IS NOT
10.12.2018
018 AVAILABLE
THAT OHE
31.10.2 POST.
15.02.19 12.04.19
018
31.10.2
15.02.19 12.04.19
018
10.12.2018
31.10.2
16.02.19 12.04.19
018
31.10.2
16.02.19 12.04.19
018
31.10.2
16.02.19 12.04.19
018
31.10.2
15.02.19 12.04.19
018
10.12.2
15.02.19 12.04.19
018
10.12.2
16.02.19 10..04.19
018
10.12.2
16.02.19 10.04.19
018
10.12.2
10.12.2018
018
10.12.2018
10.12.2018
10.12.2018
10.12.2018
10.12.2018
15.02.1
15.03.19 12.04.19
9
15.03.19
20.02.1
15.03.19 15.04.19
9
10.12.2018
15.02.1
15.03.19 13.04.19
9
15.03.19
15.03.19
15.03.19 12.04.19
15.03.19 12.04.19
15.03.19 13.04.19
15.04.19
15.04.19
12.04.19
15.04.19
15.04.19
15.04.19
15.04.19
12.04.19