Traction - Defect & Failure - Up To 04.02.20

The document reports on failures and defects on Line 2 from 0600 hours on 05.02.2020. It lists 13 failures, including issues with MVCB and relay equipment such as communication failures, LEDs not glowing, and HMI problems. Most of the failures require repair or replacement of relay components from manufacturers such as Siemens, Schneider, and Micom. Line 2 has experienced multiple relay and HMI issues at different locations that need to be rectified.

Uploaded by

TPC 78
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
191 views

Traction - Defect & Failure - Up To 04.02.20

The document reports on failures and defects on Line 2 from 0600 hours on 05.02.2020. It lists 13 failures, including issues with MVCB and relay equipment such as communication failures, LEDs not glowing, and HMI problems. Most of the failures require repair or replacement of relay components from manufacturers such as Siemens, Schneider, and Micom. Line 2 has experienced multiple relay and HMI issues at different locations that need to be rectified.

Uploaded by

TPC 78
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 137

Status of UOR of all Lines

Attended during Total no of UOR Pendings Total sum


last month Decision Pending Material Shortage
Phase-I and II Phase-III > 1 Month > 2 Month > 3 Month > 6 Month> 1 Year > 2 Year
Line-1
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Line-2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Line-3 0 0 0 0 0 0 0
Line-4 0 0 0 0 0 0 0
Line-5 0 0 0 0 0 0 0
Line-6 0 0 0 0 0 0 0
Line-7
0 0 0 0 0 0 0
Line-8
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
APL 0 0 0 0 0 0 0
Sum Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
TRACTION DEFECTS & FAILURES OF LINE-1 UPTO 0600 HRS OF 04.02.2020

Phase FAILURE RECTIFICATION


DEPARTMEN MAKE FAILURE
SN LINE POST/ LOCATION EQUIPMENT DESCRIPTION OF FAILURE REMARKS/RECTIFICATION DETAIL
T /MODEL CATEGORY
I&II or III DATE TIME DATE TIME
TDC-1 TDC-2
FAILURE/DEFECT LIST OF LINE-02 UP TO 0600H OF 05.02.2020

Phase

FAULT FAILURE RECTIFICATI


SN LINE POST/ LOCATION DEPARTMENT EQUIPMENT MAKE /MODEL TIME TIME DESCRIPTION OF FAILURE
ID DATE ON DATE

I&II or III

Micom P 521
MVCB 12- P 521 Schneider MVCB 12- P 521-- RELAY OK. BUT COMMUNICATION FAIL
1 70 2 I&II GTB ASS 1 RELAY 24.07.18 1430H
MVCB 13- P122 Micom P 122 MVCB 13- P122-- HMI BUTTON NOT WORKING.
Schneider

Micom P 521
2 71 2 I&II GTB ASS 2 RELAY 24.07.18 1430H MVCB 21 - P 521-- HMI BUTTON & DISPLAY NOT WORKING.
MVCB 21 - P 521 Schneider

Micom P 122
3 72 2 I&II GTB ASS 3 RELAY 24.07.18 1430H MVCB 24 -P122-- HMI BUTTON & DISPLAY NOT WORKING.
MVCB 24 -P122 Schneider

4 75 2 I&II VS ASS N RELAY AB 221 - 7SJ6021 SIEMENS 24.07.18 1430H AB 221 - 7SJ6021 -- SERVICE LED NOT GLOWING.

SIPROTECH,
5 76 2 I&II CL ASS S RELAY AB 226 - 7SJ62 24.07.18 1430H AB 226 - 7SJ62 -- HMI PROBLEM, RESTARTS AUTOMATICALLY
SIEMENS.

AB 231 - 7SD6001 - SERVICE LED NOT GLOWING & COMMUNICATION


AB 231 - 7SD6001
6 78 2 I&II KG ASS N RELAY SIEMENS 24.07.18 1430H FAIL.
AB 235 - 7SJ6021
AB 235 - 7SJ6021 -- SERVICE LED NOT GLOWING

7 80 2 I&II CHCK ASS N RELAY AB 241 - 7SJ6021 SIEMENS 24.07.18 1430H AB 241 - 7SJ6021 -- SERVICE LED NOT GLOWING

AB 240- 7SD6001 --SERVICE LED NOT GLOWING


AB 240 - 7SD6001
AB 240 - 7SJ62 -- RUN LED NOT GLOWING.
8 81 2 I&II CHCK ASS S RELAY AB 242 - 7SJ6021 SIEMENS 24.07.18 1430H
AB 242 - 7SJ6021 -- SERVICE LED NOT GLOWING
AB 244 - 7SD6001
AB 244 - 7SD6001 -- SERVICE LED NOT GLOWING

9 83 2 I&II NDI ASS N RELAY AB 257- 7SD6001 SIEMENS 24.07.18 1430H AB 257- 7SD6001 -- SERVICE LED NOT GLOWING.

10 85 2 I&II RCK ASS N RELAY AB 263 - 7SJ6021 SIEMENS 24.07.18 1430H AB 263 - 7SJ6021 -- SERVICE LED NOT GLOWING.

AB 262 - 7SJ62
AB 262 - 7SJ62 -- HMI NOT WORKING (NO DISPLAY)
AB 262 - 7SD6001
AB 262 - 7SD6001 -- SERVICE LED NOT GLOWING
11 86 2 I&II RCK ASS S RELAY AB 264 - 7SJ6021 SIEMENS 24.07.18 1430H
AB 264 --7SJ6021 -- SERVICE LED NOT GLOWING.
AB 266 - 7SJ62
AB 266 - 7SJ62.-- RELAY UNHEALTHY
AB 266 - 7SD6001
AB 266 - 7SD6001 -- SERVICE LED NOT GLOWING
Micom P 521
12 88 2 I&II CTST ASS N RELAY MVCB 12- P521 24.07.18 1430H MVCB 12- P521 -- COMMUNICATION ALARM
Schneider

AB 276 - 7SJ62 AB 276 - 7SJ62 -- ERROR LED GLOWING & HMI NOT WORKING
13 89 2 I&II CTST ASS S RELAY SIEMENS 24.07.18 1430H
MVCB 22- 7SJ62 MVCB 22- 7SJ62 -- ERROR LED GLOWING

Micom P 521 MVCB 21 - P521 - DISPLAY NOT WORKING. INFORMED TO RELAY


14 92 2E I&II LKM ASS 2 RELAY MVCB 21 - P521 24.07.18 1430H
Schneider TEAM.
Micom P 521 MVCB 23 - P521 - DISPLAY NOT WORKING. NFORMED TO RELAY
15 94 2E I&II GNPK ASS 2 RELAY MVCB 23 - P521 24.07.18 1430H
Schneider TEAM.

MVCB 24 - P521 Micom P 521 MVCB 24 - P521 - DISPLAY NOT WORKING.


16 95 2E I&II GNPK ASS 3 RELAY 24.07.18 1430H
MVCB 3- P111 Schneider MVCB 3- P111 - DISPLAY HANGED. NFORMED TO RELAY TEAM.

Micom P 521 MVCB 21 - P521 - DISPLAY NOT WORKING. NFORMED TO RELAY


17 96 2E I&II LKM ASS 2 RELAY MVCB 21 - P521 24.07.18 1430H
Schneider TEAM.

MVCB 24 - P521 - DISPLAY NOT WORKING. NFORMED TO RELAY


MVCB 24 - P521 Micom P 521
18 97 2E I&II HZK ASS 3 RELAY 24.07.18 1430H TEAM.
Schneider

Micom P 521 MVCB 13 - P521 -- RELAY NOT AVAILABLE. INFORMED TO RELAY


19 98 2E I&II MVNR ASS 1 RELAY MVCB 13 - P521 24.07.18 1430H
Schneider TEAM.

MICOM P120 MVCB 1 - P120 -- DISPLAY NOT WORKING.NFORMED TO RELAY


20 99 2E I&II SKT ASS 1 RELAY MVCB 1 - P120 24.07.18 1430H
SCHNEIDER TEAM.

Micom P 521
MVCB 14 - P521 Schneider MVCB 14 - P521 - DISPLAY NOT WORKING.
21 100 2E I&II SKT ASS 3 RELAY 24.07.18 1430H
MVCB 3- P111 MICOM P111 MVCB 3- P111 - DISPLAY HANGED.NFORMED TO RELAY TEAM.
SCHNEIDER

MICOM P111
22 106 2E I&II UDB ASS-1 RELAY MVCB-1 28.07.18 1000H O/C PROTECTION RELAY (P111) IS SHOWING TRIP IN SCADA.
SCHNEIDER

Micom P 521
23 147 2E I&II UB ASS-2 RELAY MVCB-22 08.09.18 1600H LINE DIFF. RELAY IS IN HANGED POSITION.
Schneider

Micom P 521
24 148 2E I&II INA ASS-1 RELAY MVCB-11 08.09.18 1600H LINE DIFF. DISPLAY IS NOT WORKING.
Schneider

Micom P 521
25 149 2E I&II MVNR ASS 1 RELAY MVCB-11 08.09.18 1600H LINE DIFF. RELAY CARD BURNT.
Schneider

Micom P 521
26 150 2E I&II JB ASS-1 RELAY MVCB-13 08.09.18 1600H LINE DIFF. RELAY COMMUNICATION FAILED.
Schneider

Micom P 521
27 151 2E I&II INA ASS-1 RELAY MVCB-13 08.09.18 1600H LINE DIFF. RELAY COMMUNICATION FAILED.
Schneider

Micom P 521
28 152 2E I&II INA ASS-2 RELAY MVCB-13 08.09.18 1600H LINE DIFF. RELAY COMMUNICATION FAILED.
Schneider

Micom P 521
29 153 2E I&II HKS ASS-3 RELAY MVCB-3 08.09.18 1600H OC/EF RELAY DISPLAY IS HANGED.
Schneider
66 KV BUS BAR DIFFERENTIAL RELAY REB-500 IS FAULTY. ABB
MAKE REB 500 (BUS BAR DIFFERENTIAL ) RELAY WAS CHECKED AS
HMI WAS NOT WORKING. UPON INSPECTION IT WAS FOUND THAT
CENTRAL PROCESSING UNIT IS FAULTY AND IT NEEDS TO BE
30 168 2 I&II ND RSS RELAY REB 500 ABB 27.09.18 1745H
REPLACED.
REB 500 FROM STORE WAS ISSUED BUT IT IS NOT COMPLETE UNIT
AND REB 670 RELAY MUST BE INSTALLED.
AB 216 RESTRICTED EARTH FAULT RELAY OPERATED ALARM
31 200 2 I&II VV ASS S RELAY AB 216 REF SIEMENS 2200H
COMING FREQUENTLY IN SCADA.

COMMUNICATION PROBLEM WHILE GRANT/CANCELLATION OF


32 209 2 I&II OCC/SHPK TELECOM ZETRON MOTOROLA 21.11.18 0240H POWER BLOCK AND COMMUNICATION WITH FIELD STAFF DUE TO
PROBLEM IN ZETRON & TELECOM SIGNAL.

33 211 2 I RCK ASS SOUTH RELAY AB 266 NA 24.11.18 2100H AT RCK ASS SOUTH AB 266 NOT CLOSE FROM OCC.

IP RSS TO ND RSS 66 KV I/C-2 CABLE TRIPPED ON DIFFERENTIAL


34 226 2 I IP RSS-ND RSS PSI 66 KV CABLE(I/C-2) 23.12.18 1633H
PROTECTION.

Micom P 521 MVCB 14 - P521 - DISPLAY NOT WORKING. INFORMED TO RELAY


35 237 2E I&II AIIMS ASS 3 RELAY MVCB 14 - P521 15.01.19 0130H
Schneider TEAM.

P111 RELAY OF OCR TRIP ALARM SHOWING IN P111 RELAY OF MVCB 3.


36 319 2E II HKS ASS-3 RELAY ABB 03.07.19 19:40:02
MVCB-3 RELAY IS IN HANGED POSITION.

37 320 I MB ASS RELAY I/C-1 ABB 04.07.19 12:00:00 33KV I/C-1 OF MB ASS IS GETTING TRIPPED.

COLOURATION OF RISE, SPBI, BIMR ASS & JGPI RSS TURNS RED ON
38 332 2 III RISE ASS SCADA BUS COLOURATION NA 21.07.19 1400H
APPLICATION OF EARTH SWITCH IN RISE ASS.

ISOLATOR DC LIS 23-1, 23-2, 24-1, 24-2 DC CONTROL SUPPLY SHOWING FAIL.
39 354 2 II JGPI RSS PSI/RELAY/SCADA NA 29.12.19 1030H
SUPPLY NORMAL IN FIELD & LOCAL SCADA.

SP 222 DC SUPPLY FAIL & REMOTE/LOCAL STATUS NOT UPDATING


40 357 2 III JGPI RSS PSI/RELAY/SCADA SP 222 NA 01.12.19 1500H
IN SCADA.

66 KV CABLE FROM JGPI RSS TO MKPR RSS CHARGED FROM MKPR


41 358 2 III JGPI RSS SCADA/PROJECT BUS COLOURATION NA 01.09.19 1600H
END BUT BUSBAR COLOUR SHOWING RED IN SCADA.

AT NDI RSS BUS COUPLER F04-Q0 SHOWING LOCAL STATUS IN


42 376 2 I NDI RSS RELAY/PSI NDI RSS MICOM-C434 09.12.19 1400H
SCADA.

MVCB 23 SHOWING ALARMS ( TRIP CKT. UNHEALTHY, O/C & E/F


43 378 2 II MVNR ASS-2 PSI/RELAY MVCB 23 AREVA 12.10.19 0700H RELAY FAULTY ).

44 387 2 II AHNR ASS PSI BATTERY BANK NA 15.12.19 2000H 10 NO. CELLS FOUND FAULTY DURING BATTERY LOAD TEST.

CB 220 DC SUPPLY FAIL INDICATION SHOWING IN SCADA.


45 416 2 II JGPI TSS PSI/RELAY/SCADA CB 220 NA 27.12.19 0700H
CHECKED BY RSS OPERATOR & REPORTED NORMAL IN FIELD.
46 446 2 I AZU SP PSI BM 246 NA 25.12.19 1631H CONTROL UNIT SHOWING FAULTY.

47 454 2E II QM ASS PSI IT-11 ABB 01.01.2020 0228H IT-11 FAILS TO CLOSE THROUGH SCADA.

MVCB-23 SHOWING TRIP CKT. UNHEALTHY & CABLE FAULT


48 459 2E I&II UDB ASS-2 PSI MVCB-23 NA 03.01.20 1200H
OPERATED IN SCADA.

AT NDI RSS, COUNTER READINGS OF Y & B-PHASE LAOF AT-22


49 473 2 I NDI RSS PSI LA MICOM-C434 04.02.2020 2330H INCREASED ABRUPTLY FROM 3 AND 7, RESPECTIVELY. Y-49999
AND B-33027.
F 05.02.2020

FAULT
REMARKS/RECTIFICATION DETAIL TDC -1 TDC-2
CATEGORY

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team.


VC 20.08.19 31.03.2020
7SD 6001 (AB 223 ) ATTENDED & RECTIFIED.

7SD 6001 (AB 226 ) ATTENDED & RECTIFIED. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

As per SE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

AS PER ASE/PSI, RELAY WILL BE TESTED BY RELAY TEAM. VC 20.08.19 31.03.2020

AS PER ASE/PSI, RELAY WILL BE TESTED BY RELAY TEAM. VC 20.08.19 31.03.2020

AS PER ASE/PSI, RELAY WILL BE TESTED BY RELAY TEAM. VC 20.08.19 31.03.2020

AS PER ASE/PSI, RELAY WILL BE TESTED BY RELAY TEAM. VC 20.08.19 31.03.2020

AS PER ASE/PSI, RELAY WILL BE TESTED BY RELAY TEAM. VC 20.08.19 31.03.2020

AS PER ASE/PSI, RELAY WILL BE TESTED BY RELAY TEAM. VC 20.08.19 31.03.2020

AS PER ASE/PSI, RELAY WILL BE TESTED BY RELAY TEAM. VC 20.08.19 31.03.2020

AS PER ASE/PSI, RELAY WILL BE TESTED BY RELAY TEAM. VC 20.08.19 31.03.2020

DECISION ON REPLACEMENT OF REB-500 WITH REB-670 IS BE TAKEN BY RELAY TEAM. VC 20.08.19 31.03.2020
As per SE/PSI, Relay to be jointly checked with Relay team. C 20.08.19 31.03.2020

HAS BEEN CONVEYED MULTIPLE TIMES TO TELECOM STAFF. VC 31.03.2020 NA

JOINTLY CHECKED WITH PSI STAFF. NO PROBLEM FOUND AT RTU END. 110 VDC NOT AVAILABLE
C 20.08.19 31.03.2020
FROM BREAKER END.

Tender for the work has been awarded to M/S K.V. Pratik on dated 01.11.19. Work couldn't be started due to
ban on construction by NGT. Permission for the same has been uploaded to GSDL. Permission letter has also
been sent to IGL, DCP (Traffic) and DJB on 27.12.19. A Joint inpsection of restoration site was carried out with C 20.02.2020 NA
JE/Works/PWD and JE/PSI on 25.01.2020. The permission letter has been forwarded from JE office to
divisional office of PWD for further action.

As per ASE/PSI, Relay to be jointly checked with Relay team. VC 20.08.19 31.03.2020

INFORMED TO PSI INCHARGE TO TAKE UP WITH RELAY. C 20.08.19 31.03.2020


INFORMED TO PSI INCHARGE TO TAKE UP WITH RELAY.
Checked the tripping problem of I/C-1 CB at MB/ASS and found that its reverse power relay faulty.

a) PT and CT wiring of this relay checked and found normal as per drawing.
C 20.08.19 31.03.2020
b) Relay trips when its PT healthy only i.e only in cable charging condition with out any current flow in the relay.
Where as per relays function when current flow in opposite direction than the relay should trip.Therefore for
confirmation the reverse power relay of I/C-3 connect in I/C-1 and found normal no tripping occurs. So new
relay required for this.
INFORMED TO ASE/ SCADA AND PROBLEM SIMULATED. ABB ENGINEER WILL VISIT FOR
C 15.11.19 31.03.2020
CONFIGURATION OF COLORATION SCHEME.

AS PER JE/PSI IT IS NORMAL IN FIELD & LOCAL SCADA. INFORMED TO SCADA STAFF FOR
RECTIFICATION.CHECKED BY ASE/SCADA ON 29.12.2019. CHECKED IN LOCAL SCADA AT RSS. THE
VC 15.02.2020 NA
SIGNALS ARE CONFIGURED IN LOCAL SCADA BUT NO WIRING IS AVAILABLE FROM FIELD. Wiring to
be done by PSI staff

INFORMED PSI & SCADA STAFF FOR RECTIFICATION.CHECKED BY ASE/SCADA ON 01.12.2019. TO


C 15.02.2020 NA
BE JOINTLY CHECKED WITH RELAY STAFF. WIRING TO BE DONE BY PSI STAFF

INFORMED SCADA STAFF FOR RECTIFICATION. NO PT HAS BEEN CONFIGURED AT MKPR BAY.
HENCE IT IS NOT POSSIBLE TO CONFIGURE THE COLORATION WHEN CABLE IS CHARGED FROM C 31.03.2020 NA
MKPR.

CHECKED BY RELAY TEAM .RELAY Micom C434 FOUND FAULTY. Procurement of the same relay is under
progress. Requirement has been sent to M/S Schneider and they have told that instead of this relay, another
VC 15.02.2020 NA
compatible relay with same configuration will be provided. Engineer from M/s Schneider visited ND RSS on
20.01.2020 and downloaded configuration data from healthy relay for further action.

CHECKED BY SM/PSI. REPORTED FAULTY MICOM P122 RELAY. RELAY TEAM INFORMED. C 15.02.2020 NA

INFORMED TO JE/PSI. Procurement of battery bank is under progress from L-2 Extension. Same will be
C 15.02.2020 NA
rectified after procurement

INFORM TO PSI AND SCADA TEAM . TO BE CHECKED JOINTLY WITH RELAY TEAM. C 15.02.2020 NA
INFORMED TO HM/PSI. CHECKED BY JE/PSI & INFORMED THAT OPEN POSITION CAN'T BE RELIED
UPON. TO BE JOINTLY CHECKED BY PSI & SCADA IN NIGHT OF 26-27/DEC. ON 27.12.19, Mechanical
operation of BM246 done with handle and found normal. Checked the problem of BM246 at AZU/SP and found
that it's closing capacitors (03No.) are faulty. (Shows 1volt at capacitor terminal.) Control unit ready indication
not glows in card. Also check the closing and tripping coil continuity at control card, found that tripping coil
gives continuity where as closing coil did not. So checked the same at snubber card input, found normal but at
output it shows high resistance. Problem will be attended in next block with all required material. On 08.01.20,
Control unit of BM-246 has been replaced with new but problem not rectified. On 16.01.20, Check the
operational problem of BM246 and found that even breaker is in Off condition in control unit it shows breaker
VC 07.02.2020 NA
ON. Same was checked and found that one wire disconnect from X0 control cable plug in top mechanical box.
As the wire was not connected in that place , so new wire was connected from mechanical box to control box.
Trip circuit healthy indication not glows in the control card, tripping circuit was checked and the TCH indication
problem rectified. As all indications were proper reflect in control card after that operation of BM checked and
found that it's operation was normal. But it not hold in the closing position. Tried for It's mechanical adjustment
but not completed due to time boundation. On 20.01.2020, Mechanical adjustment of pole assembly was
changed and its operation was checked at different adjustments and found that after one or two operations
pole stuck in intermediate position. It's close operation done normally but its open operation not done normally.
Problem still persists not rectified.

INFORMED TO JE/PSI TO CHECK. VC 15.02.2020 NA

INFORMED TO PSI STAFF. C 15.02.2020 NA

INFORMED TO SE/PSI. VC 15.02.2020 NA


FAILURE/DEF
Phase
POST/ MAKE
SN LINE DEPARTMENT EQUIPMENT
LOCATION /MODEL
I / II / III

SM 3310 &
1 3 I NFD FP SCADA ABB
SM 3311

2 4 II NV ASS TELECOMM COMMUNICATION ABB

66 KV CABLE
3 3 I DW RSS PSI
TERMINATION

4 3 I NFD FP SCADA/PSI SM -

5 3 II BCGN RSS RELAY/PSI EARTH SWITCH ABB

3 SCADA/PROJE
6 II NSFT-NCC BUS BAR _
EXT CT

3 SCADA/PROJE
7 III NECC FP PT 377 & 378 _
EXT CT

8 3 II MB BARCO BARCO CUBE ABB

9 9 III DWTSS PSI CB391

SCADA/PROJE
10 9 III NFGH SSP PT06
CT
SCADA/PROJE
11 9 III NFGH SSP BM907
CT

PSI/SCADA/PR
12 9 III DWSG FP BM901
OJECT

TELECOM/SCA
13 3 II GEC ASS COMMUNICATION ABB
DA

14 3 MB SCADA BARCO CUBE BARCO

15 3 I SN ASS PSI IT-11 ABB

16 3E III MVP SP PSI/PROJECT DM3200

17 3 I NWDA ASS PSI AB-355 ABB

BUS BAR
18 3E III NECC SDG SCADA NA
COLORIZATION

19 3E III NECC ASS SCADA/PSI PT-20 NA

20 3E III NECC ASS SCADA/PSI BPT-02 NA

21 3E III NECC ASS SCADA/PSI PT-22A NA

22 3E III NS-62 ASS SCADA/PSI PT-21 NA

SCADA/PROJE
23 9 III NFGH SSP PT05
CT
3 SCADA/PROJE
24 III NECC FP FEEDER CB _
EXT CT
PSI/SCADA/PR
25 9 III DWSG FP BM902 Megawin
OJECT

26 3 I SN FP SCADA BM-325 & BM-326 ABB

27 3 I KB SP SCADA BM-309 ABB

28 3 I PN SS SCADA PT-311 NA

25 3E III NECC FP PSI/PROJECT SM 3236 NA


FAILURE/DEFECT LIST OF LINE-03&4 UP TO 0600H OF 05.02.2020
FAILURE RECTIFICATION
DESCRIPTION OF FAILURE
DATE TIME DATE TIME

SM3310 & 3311 status showing intermidiate in


14.07.18 1200H
both open & close condition.

SCADA Communication failed in Both Base


08.12.18 1400H
(SHPK + MB) server

B PHASE CABLE TERMINATION


23.12.18 0237H PUNCTURED AT 66 KV INCOMER 1 AT DW
RSS.

On DC fail condition, Control supply indication


11.01.19 1700h
of All SM (isolator) still showing normal.

132 Kv EARTH SWITCH (LEIS 37 & LEIS


24.6.19 1400H 38)SHOWING OPEN IN SCADA EVEN
AFTER CLOSED.

BUS BAR COLOURIZATION OF NSFT TO


11.08.19 0100H NCC ASS IS SHOWING RED IN BARCO
EVEN IN CHARGE CONDITION.

On charging of UP line, Dn line PT ( 378 )


showing charged in SCADA. And
10.09.19 0500h
On charging of Dn line, Up line PT ( 377 )
showing charged in SCADA.

2 NO BARCO CUBE NOT WORKING


26.9.19 1700H
PROPERLY

CB391 is not getting closed remotely . Same


06.10.19 0645h closed locally & some times its CB TRIP CKT
showing faulty

PT06 showing 25KV also in OHE dead


06.10.19 2330H
condition.
Parelleling BM Auto/manual LAF program is
06.10.19 2330H
not working.

Parelleling BM Auto/manual LAF program is


06.10.19 2330H
not working.

SCADA Communication failed of GEC ASS


15.11.19 1915H
communication is failed in Base-D

02 NO BARCO CUBE white and yellow


29.11.19 2000H
patches coming.,

25.12.19 0904H SF6 GAS PRESSURE LOW.


DM3200 IS INTERMIDEATE SINCE
COMMISSIONING.
27.12.19 1400H
IT DOES NOT CLOSES DUE TO
MECHANICAL ADJUSTMENT ISSUE.
01.01.20 1000H SF6 GAS PRESSURE LOW.

10.09.19 0500h BUS BAR COLORIZATION SHOWING RED.

10.01.2020 0500h 30.01.2020 1330H PT -20 SHOWING WRONG 0 KV

10.01.2020 0500h BPT -02 SHOWING WRONG 27-28 KV

10.01.2020 0500h 30.01.2020 1330H PT -22A SHOWING WRONG 0 KV

10.01.2020 0500h PT -21 SHOWING WRONG 0 KV


PT05 showing 6.85 KV in in OHE charged
14.01.2020 0500H condition in SHPK/base, but normal in
SINCE MB/base.
WRONG CONNECTIVITY OF CBs FROM
COMMSION 0500h
NECC TSS IS SHOWING IN SCADA.
ING
Sectioning BM902 got opened. No abnormal
26.01.2020 2252h
indication found.
Bridging BM-325 & BM-326 are not getting
27.01.2020 0033H closed by normal SCADA command but getting
closed
Controlby forceofcommand.
supply Bridging BM-309 showing fail
27.01.2020 0033H in SCADA but normal in fiield, operation also
nornal.
PT-311 SHOWING WRONG 0KV IN
04.02.20 0445H
CHARGED CONDITION.
SM 3236 is not getting closed from SCADA &
05.02.20 0234H by push button when operation checked after
maintenance.
02.2020

Categorization
REMARKS/RECTIFICATION DETAILS TDC - 1
Code

SURGE has observed from SM end, which may cause


of damage the CPU during SM operations.
PSI STAFF CHECKED EARTH PIT RESISTANCE AT
LOC SM 3311 LOC NJF/2013 Eoverall-5.1 TDC-01 :
C
E 1-10.08Ohm 14.11.18
E 2-7019 Ohm
E 3-12.00 Ohm

INFORMED TO TELECOM, V2 CARD FAULTY. TDC-01 :


U
Failure From Telecom End. 15.12.18

a)Cable termination procurement kit case has finalised


and Indent prepared on 31/7/19. b) LOA for instalation
C TDC-01 :
of termination this work awarded to M/s ABB & M/s
SYSOL

Informed to SCADA & PSI staff.Due to surge from field


NC TDC-01 :
indication cables has been isolated in RTU end.

Earth switch indication is not coming in relay also.may


NC
be some configuration issue in relay end.

Due to software issue busbar coloration could be


changed when supply from Noida62 side in Line-4
C
section.Same will taken up with Jointly with ABB and
SIEMENS.

SAME WILL TAKE UP WITH PROJECT & SIEMENS. C 10/30/2019

Case is under progress for Upgradation of LED. NC 12/31/2019

REQUIERD JOINTY CHECK WITH PROJECT AND PSI


C
STAFF.

SAME WILL TAKE UP WITH PROJECT.SAME ALSO


C 10/30/2019
INFORMED TO PROJECT.
SAME WILL TAKE UP WITH PROJECT. C 10/30/2019

SAME WILL TAKE UP WITH PROJECT. C 10/30/2019

INFORMED TO TELECOM and SCADA staff. U

INFORMED TO SCADA staff. NC

INFORMED TO PSI STAFF NC

SAME INFORMED TO PSI & PSI SCADA VC

INFORMED TO PSI STAFF NC

INFORMED TO SCADA staff. C

Relay were not communicating from field.So restarted


C
the relay. PT values are now updating at TPC end.

INFORMED TO SCADA/PSI STAFF staff. C

Relay were not communicating from field.So restarted


C
the relay. PT values are now updating at TPC end.

INFORMED TO SCADA/PSI STAFF staff. C

INFORMED TO SCADA STAFF staff. C

SAME INFORMED TO SCADA STAFF C

same closed C

SAME INFORMED TO SCADA STAFF NC

Found normal in simulation done from RTU by SCADA


C
staff, Joint checking of PSI & SCADA is required.

INFORMED TO SCADA STAFF staff. C

Informed to PSI staff. C


TDC -2

TDC-02 :
15.12.2019

TDC-02 : not
given by
Telecom

TDC-02 :
18.05.19

TDC-02 :
15.12.2019
FAILURE/DEFECT LIST OF LINE-05 UP TO 0600H OF 05.02.2020

Phase FAILURE RECTIFICATION


POST/ DEPART MAKE
SN LINE EQUIPMENT DESCRIPTION OF FAILURE REMARKS/RECTIFICATION DETAILS CATE CODE TDC - 1 TDC - 2
LOCATION MENT /MODEL
I&II or III DATE TIME DATE TIME

TRACTION OVERVIEW OF L5 I S AVAILABLE IN INFORMED TO SCADA STAFF. SAME INFORMED TO ABB


1 5 3 LINE 5 EXT SCADA OVERVIEW ABB 20.07.18 1000H LVS/BARCO WHEREAS AUXILIOARY VIEW IS NOT STAFF.ACCORDING TO ABB THIS IS NOT UNDER
AVAILABLE CONTRACT.
CB-23 SHOWING IN TEST IN SCADA.CABLE FROM
PROJEC RCCB504 TO CB-23 YET NOT LAID AS RAMP FROM BGZ
2 5 3 MIEE ASS CB-23 ABB 17.08.18 1500H C
T DEPOT TO MAINLINE HAS NOT BEEN CONSTRUCTED
YET.

132KV , 100VA B Phase VTC 504 is unfit due to variaster B- phase VTC has been taken out by CGL personnel for
found melted of B Phase 132 KV bay-02. Removed faulty B
3 5 3 BGZ RSS PSI VTC 504, C- phase CGL 24.11.18 0400h
phase vtc on 24.11.18, and fitted C phase VTC but now C
its rectification work and C phase VTC Fitted in B Phase VC 31.12.19
phase circuit is with out VTC circuit after received B phase VTC it will be fitted

PSI/SCA
4 5 2 MIUDK RSS LCB-51 CGL 17.11.19 21:49:00 Protection DC-1 of LCB-1 showing Fail In SCADA Same infommed in SCADA and PSI Staff NC
DA

33KV COMPLETE CKT. COLORATION NOT WORKING AMC GIVEN TO ABB. NOW IT WILL BE DONE BY ABB
5 5 3 MIA-CIPK SCADA 33KV RING ABB 16.12.19 1100H C 25.02.20
FROM MIA/ASS TO CIPK/ASS . UNDER AMC. INFORMED ON DATED 27.01.2020

CONTROL SUPPLY OF LBCCB SHOWING FAILED AT


6 5 2 MUDK AMS SCADA LBCCB ABB 22.12.19 20:40H Same infommed in SCADA Staff NC
OCC END BUT NORMAL IN LOCAL SCADA.

DURING FLUCTUATION OF MUDK SUPPLY LVCCB


7 5 3 GHEM ASS PSI LVCCB ABB 28.12.19 00:27H OPENED & COULD NOT BE CLOSED IN AUTO. BUT SAME INFORMED TO PSI U
CLOSED IN MANUAL MODE.

DURING FLUCTUATION OF MUDK SUPPLY LVCCB


8 5 3 TKLM ASS PSI LVCCB ABB 28.12.19 00:27H OPENED & COULD NOT BE CLOSED IN AUTO. BUT SAME INFORMED TO PSI U
CLOSED IN MANUAL MODE.

RELAY/ Impedence relay of FCB-513,515,517 at MUNDK TSS


9 5 2 MUDK RSS CB-513,515,517 ABB 31.12.19 0436H SAME INFORMED TO PSI & SCADA U
SCADA showing faulty in SCADA but normal in field.

AUTO-MANUAL CHANGEOVER IS NOT WORKING


PSI/SCA PROPERLY, LVCB-2 & LVCCB WAS CLOSED BUT WHILE
10 5 3 TKBR ASS LT BREAKERS ABB 10.01.20 2006H SAME INFORMED TO PSI U
DA TEST CHARGING TR-1 LVCCB OPENED ITSELF IN
MANUAL MODE.
11 5 2 KNR ASS PSI LVCB-2 ABB 0524H LVCB-2 IS NOT CLOSING IN AUTO MODE WHILE SAME INFORMED TO PSI U
P141M & P141S RELAY OF CB-506 & P141S RELAY OF
SCHNIED
12 5 3 BGZ RSS SCADA CB-506,508 28.01.2020 0436H CB-508 IS SHOWING FAULTY IN REMOTE SCADA BUT SAME INFORMED TO PSI & SCADA C
ER
NORMAL IN LOCAL SCADA.

SCHNIED MTR OF CB-506 IS NOT GETTING RESET FROM REMOTE


13 5 3 BGZ RSS SCADA CB-506 28.01.2020 0436H SAME INFORMED TO PSI & SCADA U
ER SCADA BUT CAN BE RESET BY LOCAL SCADA.

FAILURE RECTIFIED AFTER REPLACMENT OF


14 5 2 APMN SS SCADA PT04 - 29.01.2020 2230H PT Status is showing invalid .
TRNASDUCER

01 Engine not starting from both Cab. Same stabled at TKLN


27 5 2 OHE CMV BEML 31.01.20 0415H Same informed to concern officials U
siding.
FAILURE/DEFECT LIST OF LINE-06 UP 0600 TO 04.01.2019 BREAKER IS IN SERVIC E POSITION, TO BE
LIN PHA POST/ DEPARTME MAKE FAILURE RECTIFICATION BREAKER
RECTIFIEDCONTROL BY SCADASUPPLY PROJECT IS /TEAM,
N ORMAL ASAND CB IS CA TEGORISA
SCADA
SN EQUIPMENT DESCRIPTION OF FAILURE IN SERVICE REMARKS/RECTIFICATION
POSITION. TO BE RECTIFDETAIL
IEDCHECKED
BY TDC 1 TDC-2
E SE L OCATION NT /MODEL DATE TIME DATE TIME TESING OF THIS BREAKER IS PENDING. TION CODE
ATTEN
SCADA/PROJDED BY ECTJE/PSI
TEAM, ON DATED 08.09.2018 AND
1 6 III KJMD ASS PSI MVCB21 ABB 23.11.17 1315H SHOWING CB IN TEST POSITION BY SCADA STAFF FOUNDAS SCSCAD A T ESING
ADA END OF, OF THIS NC 28.02.19 30.07.19
/PROJECT NORMALISED
BREAKER
INDICAT ION AF TER RESET
IS COMING
PENDING TING IT
.C HECKED
FROM BYS SCADA
FIELD.INF DC MCBSTAFF
ORMED .NOW
TO
2 6 III KJMD ASS PSI MVCB3 ABB 24.11.17 1100H CONTROL SUPPLY FAIL & CB OPEN
SHOWING CLOSE INDIACTION
20 FKV.A N OF, PROBLEM
OTE INDICATION
ALSO HAS
TO BEEN
SENT COMING NC 28.02.19 30.07.19
FOUND
SCADA STAF SCADA END FROM
/PROJECT POSITION
PT 03 VALUE IN TEST
OF BM 663 SHOWING RECTIFIED.
DMRC/PROJEC
FIELD.IN CBTO
FORMED
CHECK
TTRIP
ON C
DATED
TOchecked
SCADA
JOINTLY
IRCUIT IS HEALTHY
16.12.18
STAFF FOR IN FIELD
ITS
3 6E III OFDB SSP PSI PT 03 MEGAWIN 28.06.18 0944H Remark;-
BUT sc ada U
SHOWING staff
NHEALTHY on dated TO
IN SCADA,
CHECK
7-10-19
SAMEfound NC 28.02.19 30.07.19
00.00KV. MODIFICATION/RECTIFICATION.A
JOINTLY. REMINDER NOTE
4 6 II KM ASS3 PSI MVCB14 SCHNIDER 18.08.17 2030H normal
CB T RIP CIRCUIT UNHEALTH Y AND CHECKED at rtu.
AND NC 28.02.19 30.07.19
ALSO SENT
Remark;- ON F
sc ada
OUND 22.05.19.
DATED
staff
THAT ITS RELAY P122 IS
checked on dated 7-10-19 found
MICOM
SHOWSP521OPEN RELAY
IN SITE OFBU
MVCB24 IS
T CLOSED FAULT Y
5 6 II CTST ASS-3 PSI MVCB24/ P-521 RELAY AREVA 07.11.18 1000H As per projec
RELAY
normal at rtu. t staff,all
BYPASEED IT megawin PT will be replaced
IS TO BE REPLCAED SOON by NC 28.02.19 30.07.19
BREAKER
FAULTY IS UNABLE TO RACK OUT OEM
IN SCADA VIEW. Remark;-
6 6 II JGPA ASS-1 PSI MVCB 11 AREVA 29.12.18 2350H AS IT'S 01 ROLLING WHEEL IS PROTHtype ASsc BEEN
ada or.
sens staff
ASKEDchecked
TO PRonOVIDE
dated 29-09-19
THE WHEEL,
found
C 28.02.19 30.07.19
CHECKED
normalGET
SAME BY
at rtu.. PSI TEAMAFTER
REPLACED ON 31.01.19 AND F OUND
RECEIVING.
MVCB3
BROKENNOT CLOSED REMOTLY BC-607 remote open POSITION
problem has beenSWITCH
checkedISafter
7 6 II JLN ASS 3 PSI MVCB 3 AREVA 31.12.18 0536H THAT ITS SERVICE LIMIT C 28.02.19 30.07.19
AFTER MAINTENANCE looping YatSAME
breaker
8 6 III FBD TSS PSI BC-607 MEWAWIN 31.01.19 0130H NOT OPENED THROUGH SCADA. FAULT TOandBE control &relay panel end and found
REPLACED. C 28.02.19 30.07.19
normal but command not executed from relay and scada.
9 6E III STTA ASS PSI LVCB-1 ABB 10.06.19 0100h LVCB-1 is not getting close load
It normalised
is ORMED
to be c heck through
jointly LVCB-2 and LVCCB. C 20.06.19 30.07.19
INF TO PSI & SCADA STAF FS
FCBC -2 SHOWING SANDBY AND
10 6E III SRAI ASS PSI BATTERY CHARGER STATCON 17.07.19 1600H Remark;- sc ada staff joimtly c hecked with psi on dated 30.07.19
UNHALT HY STATUS IN SCADA
11 6 III KG RSS PSIL L-1 220KV BAY CGL 21.07.19 1700H INT ERLOGIC OF 220KV ISOLATORS 17-10-19 found normal at rtu. 30.07.19
NOT WORKING PROPERLY
12 6R III OFDB SSP PSI PT-03 MEGAWIN 21.07.19 21:39:00 PT SHOWING INVALID Problem is from PT end. NC 30.07.19
INF ORMED TO PSI STAF F AND FOUND THAT ONE OF
13 6 III LQLA ASS-1 PSI BATTERY CHARGER STATCON 03.08.19 1428H FCBC -1 SHOWING TRIP ITS CONTACTOR IS FAULTY. SAME HAS TO BE C
REPLAC ED
MICOMP-122 O/C Relay of MVCB22
14 6 ll CTST ASS2 RELAY MVCB-22 MiCOM 02.08.19 1630H INFORMED TO PSI AND SCADA STAFF. C
AT CTST ASS-2 is F AULTY
INF ORMED TO SCADA STAFFS .NEED TO BE
CB-21 SHOWING IN LOCAL IN
15 6E III SRAI ASS PSI CB-21 SCHNIDER 07.08.19 0730H CHECKED WITH PSI STAFF . AFT ER J OINTLY
SCADA BUT ITS LOCAL IN FIELD
CHECKING FOUND PROBLEM AT PSI END. 08/01/2020
SP603A & SP 601A SHOWING CLOSE Aux.contac t bypas s temperory for both SP 603A & SP
16 6 III STVR RSS PSI SP603A & SP 601A ABB 10.08.19 0100H c
IN SCADA WHEREAS OPEN IN FIELD 601A. . As per PSI s taff Jagmohan.
OPERAT ION OF MVC B-1 IS NOT
SAME INF ORMED TO SCAD A STAFF. NORMAL FROM
17 6 III STTA ASS PSI MVCB-1 SCHNEIDER 21.08.19 05:00:00 HAPPEN ING THOROU GH SCADA NC
RTU END
BASE B WHERE.
PSI staff checked and found that BM control c ard
18 6 II BVHM SSP PSI BM 673 Megawin 26.08.19 0400h Control card of BM faulty malfunction s ame need to replac e. C

INF ORMED TO PSI SATF F


BATT ERY CHAGER IS SHOWING FAIL 08.11.19-L&T s taff check ed the Battery Charger 2 at
19 6 III BVHM ASS PSI BATTERY CHARGERS STATCON 01.09.19 2017H
STAT US IN SCAD A BVHM ASS for not taking the load but he couldn't rectify
the problem & a revisit will be planned.
HM/PSI CHECKED THE CHARGERS AND FOUND THAT
BATT ERY CHAGER-1 IS NOT TAKING
20 6 II STVRD PSI BATTERY CHARGER STATCON 08.09.19 15:00:00 CHARGER IS NOT TAKING THE LOAD SAME IS TO BE C
LOAD
ATTEN DED
CB 21&22 NOT CLOSSING F ROM
21 6E III NCAJ ASS PSI CB 21 & 22 SCHNEIDER 20.09.19 2000H SAME INFORMED TO PSI STAFF. NC - 30.07.19
LOCAL/REMOTE
SAME INF ORMED TO ASE/PSI AND FOUND N ORMAL.
SPARKING AT ISOLATOR REPORT ED
22 6 III OFBD SSP PSI SM-660 KIRON 01.10.19 0200H NO OPERATION OF SM -660 HAS T O BE DONE C
BY ASE/OHE.
WITHOUT COSENT OF PSI STAFF
SM-607 became intermediate while
23 6 II METE FP PSI SM-607 S&S 03.10.19 0505H SAME INFORMED TO SCADA& PSI STAFF C
open in the field . Verified by PSI s taff

24 6 II STVR TSS PSI SP605 B & SP-607B S&S 03.10.19 0505H SM-607 became intermediate while SAME INFORMED TO PSI STAFF C
open in the field . Verified by PSI s taff

BM NOT CLOSED AND AS CONT RL


25 6 II METE FP PSI BM-616 ABB 04.10.19 1000H UNIT FAULT Y AFTER GIVING C
COMMAND
SP 605B showing intermediate in 2.) Videos is prepared for battery load test procedure.
26 6 II STVR/TSS PSI SP 605B S&S 11.10.19 0445H C
SCADA. Same closed in field.
THOUGH CROSS OVER IS IN
27 6 III BVHM SSP SCADA LINE COLORATION ABB 12.10.19 0401H CHARGED CONDIT ION, IT'S SAME INFORMED TO SCADA SATFF NC
CLORATION IS GREY SAME INF ORMED TO PSI STAF F.
28 6 II KM ASS1 PSI MVCB-13 Areva 23.10.19 2330H It is not opening throgh SCADA After checking from SCADA Team, No problem found C
from SCADA end.
same informed to PSI Staff .
29 6 II KM ASS 3 PSI MVCB-14 Areva 24.10.19 0500H It is not Through throgh SCADA After checking from SCADA Team, No problem found C
from SCADA end
CMV is not m oving in High speed from
30 6 II CMV OHE CMV BEML 28.10.19 1652H both cab and only low speed movement TO BE CHECKED BY BEML STAFF WITH OHE STAFF. NC
is normal from both c ab.
31 6 III FBD RSS PSI TT-607 ABB 28.10.19 2100H TT-607 TAP CHANGER FAULTY SAME INFORMED TO PSI SATFF C

TT-608 TAP CHANGER SHOWING


32 6 III FBD RSS PSI TT-608 ABB 28.10.19 2100H STUCK IN SCADA BUT MECHANICAL SAME INFORMED TO PSI SATFF C
OPERAT ION OF TAP CHANGER IS
NORMAL AT F IELD.

On Dated 15.11.19 ASE PSI c hecked LCB 60 Control


TRIP COIL-2 (R PHASE) SHOWING sys tem found T rip ck t superv is ion relay faulty same has
33 6 III KG RSS PSI LCB 610 CGL 14.11.19 1500H FAULTY been by passed and indicarion normalized.Faulty C 15.11.19 30.11.19
LCB NOT C LOSING FROM SCADA supervision relay s hould be replaced soon as per
availability.
CB STAT US SHOWING
34 6 III FBD RSS PSI CB 627 MEGAWIN 18.11.19 2100H INT ERMEDIATE IN CLOSE SAME INFORMED TO PSI STAFF C
CONDITION

35 6 III BVHM ASS PSI LVCB-2 SIEMENS 19.11.19 0100H LVCB-2 NOT CLOSING FORM SCADA INFORMED TO PSI SATFF C

CB618 NOT GETT ING CLOSE FORM


36 6 III KG RSS SCADA CB618 MEGAWIN 19.11.19 2345H OCC/SCADA. CLOSED F ORM LOCAL INFORMED TO PSI STAFF C 30.07.19
SCADA

SM-662 ENT RY/EXIT LINE SHOWING


37 6 III OFDB SSP PSI SM-662 ABB 23.11.19 1500H INT ERMEDIATE AND AND NOT INFORMED TO PSI SATFF U 24.11.19
OPERAT E T HROUGH SCADA

CB-12 NOT GET TING CLOSE


38 6 III BAPU ASS PSI CB-12 SCHNEIDER 23.11.19 2030H INFORMED TO PSI STAFF C 24.11.19
REMOTELY.

Anti track paint has been applied on upper pole of


In LBCCB 603 a heavy flashing mark
LVCCB-603 in fbd ams. After it ck t-1bay has been
39 6 III FBD AMS PSI LBCCB-603 SCHNEIDER 25.11.19 0151H was on the male bushing of busbar of U 24.11.19
charged and 33k v ck t of sarai to bvhm normalised from
bay 2 upper part, need to be rectify .
fbd rss.

CHARGER 2 SHOWING INPUT MCB


40 6 III JNPH ASS-1 PSI CHARGER 2 SIEMENS 27.11.19 1500H C
TRIP & C HARGER MAINS FAIL

a.) for not getting opened by TPC/SCADA & found its


OFF Spring was loos e also its spring compres sion was
not proper. OFF Spring was tightened & spring
compression was adjusted to normal.
CHARGER 2 SHOWING INPUT MCB b.) for intermediate in TPC/SCADA in its Close pos ition
41 6 III FBD/TSS PSI CB-627 MEGAWIN 29.11.19 0500H VC
TRIP & C HARGER MAINS FAIL and found its auxiliary contacts misaligned, the same was
adjusted & aligned to normal pos ition. After that
Operations & indic ations of CB627 are c hecked & found
normal by TPC.

IT -12 NOT OPEND REMOTELY


42 6 II METE ASS PSI IT-12 ABB 02.12.19 0200H SAME INFORMED TO SCADA& PSI STAFF C
DURING P/B GRANTING

43 6 III LLQA ASS1 PSI MVCB-11 SIEMENS 03.12.19 0300H MVCB 11 NOT CLOSING REMOTELY. SAME INFORMED TO SCADA & PSI STAFF C

7SR12 RELAY FAULT Y OF M VCB-22


44 6 III KG ASS RELAY MVCB-22 SIEMENS 06.12.20 0900H SAME INFORMED TO PSI STAFF C
AT KG ASS

PT VOLTAGE SHOWING 2.4 Kv


45 6 III AJDD FP PSI/SCADA PT-670 SADTEM 06.12.19 21:08:00 Voltage not updating from PT side.Normal from RTU end. C
WHILE ISOLATOR IS CLOSED

MVCB-2 IS CLOSED IN THE FIELD


SAME INF ORMED TO SCAD A AND PSI STAFF. SCADA
46 6 III CTST ASS-2 PSI MVCB 2 AREVA 12.12.19 0100H BUT SHOWING OPEN STATUS IN C
STAFF CHECKED FOUND OK FROM THEIR END
SCADA
MVCB-23 IS OPEN IN THE FIELD AS
SAME INF ORMED TO SCAD A AND PSI STAFF. SCADA
47 6 II CTST ASS-2 PSI MVCB 23 AREVA 12.12.19 0100H VERIFIED BY PSI STAFF BUT C
STAFF CHECKED FOUND OK FROM THEIR ENDF
SHOWIN G OPEN IN SCAD A

MVCB-13 IS COLSED IN THE FIELD SAME INF ORMED TO SCAD A AND PSI STAFF. SCADA
48 6 II CTST ASS-3 PSI MVCB 13 AREVA 12.12.19 0100H AS VERIFIED BY PSI STAFF BUT C
STAFF CHECKED FOUND OK FROM THEIR END
SHOWIN G OPEN IN SCSD A

CB-11, CB-12 & MVCB-1 at BACH ASS


49 6 II BACH PSI CB-11, CB-12 & MVCB-1 SCHNIDER 12.12.19 1426H SAME INFORMED TO SCADA STAFF C
is not c losing remotely from TPC

CONTROL U NIT OF BM-601 AT LJPN


50 6 II LJPN SSP PSI BM-601 MEGAWIN 17.12.19 0454H SAME INFORMED TO PSI STAFF C
SSP IS SHOWING FAULTY IN SCADA

CONTROL SUPPLY OF CB-650 IS


51 6 III AJDD FP PSI CB-650 MEGAWIN 18.11.19 0600H C
FAIL SHOWING IN SCAD A

CONTROL U NIT OF BM-608 AT NP


SSP IS SHOWING FAULTY IN SCADA
52 6 II NP SSP PSI BM-608 MEGAWIN 18.12.19 0800H SAME INFORMED TO PSI STAFF FOR MANNING C
AND SAME IS INTERMEDIATE IN
CLOSED CONDITION

53 6 III SRAI SP PSI BM-652 MEGAWIN 18.12.19 0800H GETTING INTEMDEIATE IN CLOSED SAME INFORMED TO PSI STAFF FOR MANNING C
CONDITION
SM-604 became intermediate while
54 6 II STVR/SSP PSI SM-604 ABB 18.12.19 1600H SAME INFORMED TO PSI STAFF C
close in the field .
PIT SAME PIT SAME PIT SAME PIT SAME PIT SAME PIT SAME
BM622 BM622 BM622 BM622 BM622 BM622
While giving clos e command to MVCB-2 KG C OMM INFOR KG COMM INFOR KG COMM INFOR KG COMM INFOR KG COMM INFOR KG COMM INFOR
E,BM 6 E,BM6 E,BM6 E,BM6 E,BM6 E,BM6
at KM ASS-2, Iis was s howing c lose in SSP- SIEME AND MED SSP- SIEME AND MED SSP- SIEME AND MED SSP- SIEME AND MED SSP- SIEME AND M ED SSP- SIEME AND MED
55 6 II KM ASS-2 PSI MVCB-2 AREVA 23.12.19 0054H SAME INFORMED TO SCADA & PSI STAFF C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C 68 6 III SCADA 05E, 21.12.19 0500H C
SCADA, while actual it is was open in CTST BM604 NS N OT TO CTST BM604 NS NOT TO CTST BM604 NS NOT TO CTST BM604 NS NOT TO CTST BM604 NS NOT TO CTST BM604 NS NOT TO
field end. SP WORKI SCADA SP WORKI SCADA SP WOR KI SCADA SP WORKI SCADA SP WORKI SCADA SP WORKI SCADA
E E E E E E
NG STAFF NG STAFF NG STAFF NG STAFF NG STAFF NG STAFF
CB-627 NOT OPENING FROM SCADA
& ELECTRIC ALLY AT LOCAL. SAME
56 6 III FBD/TSS PSI CB-627 MEGAWIN 24.12.19 0500H INFORMED TO PSI SATFF VC
OPENED BY OPERATOR WITH
HANDLE

AS REPORT ED BY JE/ OHE THE


57 6 III AJDD FP PSI SM-671 KIRON 25.12.19 0900H CLEARANCE OF SM-671 IS LESS SAME INFORMED TO PSI STAFF C
THAN 50 CM

DCDB AT SRAI/SP SHOWING FAILED


58 6 III SRAI SP SCADA/PSI DCDB - 25.12.19 1700H AT OCC/SCADA, WHERE AS NORMAL SAME INFORMED TO PSI STAFF AND SCADA STAFF C
IN FIELD

CB-609 AT STVR/TSS NOT GETTING


59 6 II STVR/TSS PSI CB-609 ABB 25.12.19 1830H CLOSED FORM OCC/SCADA. SAME INFORMED TO PSI STAFF AND SCADA STAFF C
CLOSED FROM FIELD.

MVCB-23 & MVCB13 SHOWIN G


MVCB 13
60 6 II CTST ASS-1 PSI AREVA 26.12.19 1230H WRONG INDICATION OF SAME INFORMED TO SCADA AND PSI STAFF. C
MVCB23
OPEN/CLOSE STATUS.
SHOWIN G 1. CB CIRCUIT
61 6 II JGPA ASS-3 PSI MVCB 3 AREVA 26.12.19 1300H UNHEALTHY AND 2. OC & E/F RELAY SAME INFORMED TO PSI STAFF. C
FAULTY
SHOWIN G INTERMEDIATE AFTER
62 6 III AJDD FP PSI BS-650 MEGAWIN 26.12.19 1000H C
OPERAT ION
SHOWIN G PT VOLTAGE 2.27KV
63 6 III AJDD FP PSI PT-670 MEGAWIN 26.12.19 1000H NC
AFTER CLOSING SM670
BM-658 NOT CLOSED DURING
64 6 III STTA FP PSI BM-658 MEGAWIN 29.12.19 2340H SUPPLY EXTESION ( POWER SAME INFORM TO PSI STAFF C
BLOCKGRANTING AT FBD T SS)
BM-668 SHOING INTER MEDIATE IN
65 6 III ECMJ SSP PSI BM-668 MEGAWIN 29.12.19 1504H SAME INFORM TO PSI STAFF C
SCADA

66 6 II STVR TSS PSI CB 609 ABB 02.01.20 0400H CB 609 NOT closing locally and scada SAME INFORM TO PSI STAFF C

BVHM SSP NOT SHOWN IN LVS


67 6 II OCC SCADA LVS BARCO 03.01.20 0700H SAME INFORM TO SCADA STAFF C
TRACTION OVERVIEW

NOT OPENING FROM OCC & LOC AL


68 6 II KG RSS SCADA LIS 609-1, LIS 609-2 ABB 04.01.20 1215H SCADA. OPERATION FROM BAY SAME INFORM TO SCADA STAFF C
CONTROLLER IS OK
FREQUENTLY ALRAM OF COMM
69 6 II KG FP PSI RELAY ABB 05.01.20 1215H RELAY OF BM 608,BM-609, BM-611 SAME INFORM TO PSI STAFF NC
AT KG FP
AFTER CHECKING IT WAS FOUND THAT SPRING
SHOWIN G SPRING DIISCARGED IN
70 6 II JGPA ASS-1 PSI MVCB 2 AREVA 11..01.20 2000H CGHARGING MECHANISM IS FAULT . SAM E HAS TO C
SCADA..
BE R EPLACED

AFTER GIVING OPEN CMOMMAND


71 6 III MMJR/SS PSI/SCADA BM-655 MEGAWIN 21.01.20 0400H CHWECKED BY SCADA ST AFF ON DAT ED 29.01.20 C
THROUGH SC ADA THE BM IS AND FOUND NORMAL AT SCADA END .
GETTING INTERMEDIATE

AUTO CHAN GEOVER IS NOT


72 6 III NP ASS PSI LVCB-1,2 & LVCCB 21.01.20 0420HH SAME INFORMED TO PSI SATFF C
WORKIN G IN LT BREAKERS

73 6 III AJDD FP PSI PT-670 MEGAWIN 23.01.20 1010H SHOWIN G PT VOLTAGE 2.27KV SAME INFORMED TO PSI SATFF NC
AFTER CLOSING SM670

74 6 III BVHM SSP PSI/SCADA BM-670 MEGAWIN 24.01.20 0400H NOT OPERATING TROUGH SCADA SAME INFORMED TO PSI SATFF C

75 6 II METE FP SCADA BM615 MEGAWIN 27.01.20 0300h BM 615 is not getting opened through VC
SCADA. Local operation normal .

BM-603 AT LJPN SSP SHOWING SAME INF FORMED T O PSI SHIFT INCHARGE , LINE
76 6 II LJPN SSP PSI/ SCADA BM-603 MEGAWIN 28.01.20 0918H VC
INT ERMEDIATE IN SCADA, INCH ARGE, MNGR TR - 6 MAD SCADA ST AFF

77 6 III FBD RSS PSI SP627B UNISTAR 29.01.20 0125H ISOLATOR COULD NOT BE OPENED. C
SP 631 B UNIVERSAL
FAILURE/DEFE

FAILURE
SN LINE Phase POST/ LOCATION DEPARTMENT EQUIPMENT MAKE /MODEL
DATE TIME

DC CONTROL
1 APL II 13.5 SSP PSI SUPPLY CABLE POLYCAB 15.07.19 0:00
CKT-2

DC CONTROL
2 APL II 11.3 NS PSI SUPPLY CABLE POLY CAB 02.09.19 2200h
CKT-1

3 APL II TVB-DKV PSI 33KV CABLE POLI CAB 13.01.20 2048h

5 APL NA OCC/MB SCADA UI-1&2 SIEMENS 04.02.20 0341H

FAILURE/DE

1 3 NA DWTO ASS-3 PSI MVCB 3 ABB 12.11.19 1700H

2 3 NA DWTO ASS-2 PSI MVCB 22 ABB 09.12.19 0500h


FAILURE/DEFECT LIST OF LINE-APL UP TO 05.02.2020

RECTIFICATION
DESCRIPTION OF FAILURE
DATE TIME 1. As per ASE/psi total 127Mtrs DC
cable(2C,120sq mm cu. Armoured)
theft between ch 13536-13663. DC
source ckt-2 (13.5ssp)
2. On 07 Oct As per ASE/psi total
approx 1350 Mtrs DC cable(2C,120sq
mm cu. Armoured) missing between
CH-10400 & 11100 AND CH-10200 &
9550
communication of 11.3 NS fail.
As per JE/psi total 200Mtrs DC
cable(2C,120sq mm cu. Armoured)
theft between ch 11300-11100. DC
source ckt-1

33KV Fedder AB-A34 of TVB ASS2


Tripped and during fault segregation
Cable between dkv ass-2 to dacy ass-2
isolated.

New SI(JG2201-102) installed at loc-


21/19(entry/exit line) in Dwarka
depot.Now SF-A68 isolator normally
close condition.Which was earlier in
normally open condition. Now ES-X-
A68 charged from M/L supply and a
new elementry section -X-A69 added
in depot SLD but above has not
updated in SCADA(UI-1&2)

FAILURE/DEFECT LIST OF LINE-L-3 SECTION DSTN TO DWS 21

RET 615 relay HMI of MVCB-3


faulty

After manintence Rack in-Rack out


problem .
Not closing
TO 05.02.2020

REMARK/RECTIFICATION DETAILS CATEGORIZATION CODE


PSI and SCADA staff checked and found approx 140 meter,120 cqr mm,2 core
FRLS cupper cable cut missing of DC control supply.It will be attened by PSI
team.13.07.19 -TOTAL 577Mtrs CABLE(5 CORE,2.5sq. mm) Laid between
CH.13500 to 14100 for restoration of DC supply,termination pending.On dated
14.07.19 connection of this cable done and communication normalised. Blue
lamp for control unit also became healthy.operation checking from tpc is
pending. C
15.07.19 As per ASE/psi total 127Mtrs DC cable(2C,120sq mm cu. Armoured)
theft between ch 13536-13663. DC source ckt-2 (13.5ssp) ON
07.10.19 During cable route foot patrolling by PSI team and found approx 1350
Mtrs DC cable(2C,120sq mm cu. Armoured) missing between CH-10400 &
PSI staffAND
11100 checked and found
CH-10200 & 9550approx 200Mtrs DC cable(2C,120sq mm cu.
Armoured) theft between ch 11300-11100. DC source ckt-1 . Communication C
normlasized by available DC source(ckt-2)

At 00:05 hrs CISF and Delhi police staff found 4 no's cable piece near Piller no
253, Ch 13000. Reached at site with OHE & PSI staff by BDV and found approx
200 meter's 33kV 240 SQ mm cable have 4 no's piece in jungle area. All 4 no's
33kV cable piece rolled and kept in BDV with Delhi police staff. All 4 no's 33kV
cable bundle take over by Delhi police staff and shifted to DACY Metro Police
station for further investigation.OHE staff fault indentified that 33kV B phase VC
cable cut between mast no 12/63 to 13/15 at UP line viaduct approx 200
meter's. ONn dated 27.01.20 during 33KV
Cable route foot patrolling from Neutral section to Ch-14000 UP line and found
240 sq mm 33 kV B phase cable theft between Mast no 12/63 - 13/21 (Ch
13200- Ch 13300) . approx 100mtrs cable.

Same informed to SCADA staff.According toSCADA staff database SERVER is not VC


booting to update the SLD database server required to boot

ECTION DSTN TO DWS 21

Spare Relay not avaliable,relay to be Arrange by relay team.


On date 21.12.19:- RET -615 faulty relay of 33KV feeder send from DKV c
office to Shastri park relay lab for repairing.

Psi Staff informed. On


date 16.12.19
Reck in rack out problem checked by PSI staff and found that it's one of c
plastic profile of rack in rack out mechanism found broken. same to be
replaced.
TDC 1 TDC 2 TDC 3

ON DATED 24.07.19
BMA 34,35,36
FAILURE
CONVERTED IN DC
31.07.19 31.12.19 CABLE FAILURE AS
COMMUNICATION
NORMALIZED
THROUGH CKT-1

30.09.19 31.12.19 29.02.20

NA NA NA

25.11.19 10.12.19 20.01.20

25.11.19 10.12.19 31.01.20


FAILURE/DEFECT LIST OF LINE-07 & EX
POST/
SN LINE Phase DEPARTMENT EQUIPMENT MAKE /MODEL FAILURE
LOCATION

I&II or III DATE TIME

BUS
1 7 III MKPR RSS SCADA SIEMENS 30.04.18 10:00
COLORISATION

2 7 III PBGW SSP SCADA RTU L/R STATUS SIEMENS 06.08.18 16:00
NAVR ASS1,
BATTERY
3 7 III BKCP ASS1, SCADA HBL 09.08.18 13:00
VOLTAGE
LJPN ASS 2

NAVR,NSHP, RELAY
4 7 III SAKP,RG,NAV SCADA COMMUNICATION SIEMENS 09.08.18 13:00
R,DDSC ASS STATUS

5 7 III SAKP ASS SCADA/PSI MVCB 21 SIEMENS 27.09.18 12:30

6 7 III INA TSS SCADA BUSBAR SIEMENS 10.10.18 00:45:00


7 7 III DDSC SSP PSI/SCADA BM 34 MEGAWIN 14.10.18 02:30:00

8 7E III WC ASS PSI PT-171& MVCB 2 SIEMENS 31.10.18 16:45:00

9 7E III TKPR-SVVR SCADA LT- TESTING SIEMENS 31.10.18 16:45:00

10 7E III MUPR SSP SCADA BM 82,81 MEGAWIN 02.11.18 13:05:00

11 7E III VNNR RSS PSI SP 712 SIEMENS 04.11.18 12:10:00

12 7E III VNNR RSS SCADA/PSI PT SIEMENS 15.11.18 22:00:00

13 7E III KHNA ASS PSI MVCB 21 SIEMENS 22.11.18 00:05:00

14 7E III EANR ASS PSI MVCB 22 SIEMENS 22.11.18 00:05:00

15 7E III VNNR RSS PSI/SCADA PT STATUS SIEMENS 21.11.18 21:35:00

16 7 III EANR PSI MVCB 12 SIEMENS 27.12.18 01:00:00

17 7E III VNNR TSS SCADA CB 737 SIEMENS 08.01.19 05:23:22

18 7E III VNNR TSS SCADA/PSI SP-731 SIEMENS 10.01.19 00:05:00

19 7E III JFRB PSI MVCB 12,22 SIEMENS 13.01.19 17:15:00

20 7E III MV SP SCADA/PSI BM 55 SIEMENS 20.02.19 16:08:00


21 7E III IPE SSP SCADA BM-68 MEGAWIN 21.02.19 4:19:00

22 7 III MKPR AMS SCADA RCCB 701 SCHINEDER 01.03.19 1:00

KKDA ,JEE
23 7E III PSI/SCADA LT CHANGE OVER SIEMENS 03.03.19 04:35:00
ASS
RELAY
24 7 III NIZM SCADA COMMUNICATION SIEMENS 13.04.19 14:20
STATUS
MKPR SSP
25 7 III SCADA RTU SIEMENS 15.08.18 07:00:00
&FP

26 7 III INA RSS SCADA LOCB714 SIEMENS 15.05.19 00:45:00

27 7 III WC ASS SCADA/PSI LVCB 1 SIEMENS 20.05.19 07:00:00

WC & JFRB
28 7 III SCADA/PSI LVCB 1 SIEMENS 20.05.19 07:00:00
ASS

29 7 III MKPR RSS SCADA/PSI 66KV PT SIEMENS 24.05.19 15:30:00


TKPR,JEE,GKP
R,MUPR,JFRB,
30 7E III EANR,KHNA,K SCADA PT PRAGATI 01.06.19 00:45:00
KDAVNNR,VE
NT, BUS
31 7 III MKPR RSS SCADA SIEMENS 01.06.19 01:45:00
COLOURSATION
,AZU,,RG
32 7 III DLICSOJI,LJP SCADA PT PRAGATI 01.06.19 00:45:00
N,ASRM,MYPI

33 7 III INA RSS SCADA LBCB 703 SCHINEDER 14.06.19 02:40:00

34 7 III DKV RSS SCADA CB 706 SCHINEDER 29.06.19 02:47:00

33 KV BUS BUS
35 7 III SCADA SIEMENS 11.07.19 09:40:00
BAR COLOURSATION

36 7E III IPE ASS PSI MVCB-22B SIEMENS 18.07.19 19:40:00

ALL FEEDRERS
37 7E III VNNR TSS SCADA/PSI SIEMENS 20.07.19 05:00:00
PT

38 7 III INA TSS SCADA CB-708 MEGAWIN 01.08.19 00:01:00

FP
39 7 III MKPD FP SCADA COLOURISATION SEIMENS 02.08.19 12:30:00
& PT

40 7 III DKV RSS PSI TT 706 CG 02.08.19 21:14:00

41 7 III MKPR AMS SCADA RCCB701 SCHINEDER 03.08.19 01:14:00

42 7 III AZU ASS-1


DDSC PSI MVCB-11 SIEMENS 13.08.19 00:30:00
SSP,DKV
TSS,MYPI PERMISSIVE
43 7 III SCADA SEIMENS 16.08.19 04:15:00
SKPR SSP COMMMAND
SSP,SMBG
44 7 III SS,,YV TSS
LJPN SSP PSI/SCADA BM 44 SEIMENS 14.10.18 3:45

45 7E III SVVR SSP PSI/SCADA BM 92 MEGAWIN 14.10.18 8:45


SCADA
46 7 III INA FP SCADA SEIMENS 23.08.19 9:00
COMMUNIACTION

CB 700,701, 702 SCHENIDER


47 7 III MKPR TSS SCADA/PSI 23.08.19 22:45:00
&703 /SIEMENS

48 7E III KKDC SCADA PT02 SADTEM 23.08.19 0:05

49 7E III WC FP PSI PT-01 SADTEM 02.09.19 0:14

50 7E III EANR ASS PSI PT SADTEM 03.09.19 08:05:00

51 7 III SKPR PSI CHARGER- HBL/STATCON 08.09.19 17:00:00

52 7 III ASRM,MYPI SCADA ALL CBs SEIMENS 08.09.19 17:00:00

53 7E III EANR SCADA CPU1 SIEMENS 23.09.19 01:00:00

25 KV CABLES OF
54 7E III VNNR TSS PSI SIEMENS 01.10.19 05:00:00
CB-733, 737

55 7 III MKPR SS PSI/SCADA CS-04 PROAT 13.10.19 15:30

56 7E III GKPR ASS PSI/SCADA MVCB-20 SIEMENS 14.10.19 01:00:00

57 7 III INA FP PSI/SCADA BM-43 SEIMENS 18.10.19 11:05

58 7E III IPE ASS PSI CHARGER 2 SIEMENS 23.10.19 08:30:00

STAND BY
59 7E III GKPR ASS PSI SIEMENS 23.10.19 08:30:00
CHARGER

STAND BY
60 7E III VNNRD2 PSI SIEMENS 23.10.19 08:30:00
CHARGER

61 7E III MVPO SSP SCADA/PSI BM 58 SIEMENS 25.10.19 16:08:00

62 7 III MKPD FP PSI/SCADA SM-I KIRON 31.10.19 15:15:00

63 7E III VNNR TSS PSI/SCADA CB-712 SCHNIDER 01.11.19 01:30:00

64 7 III MKPR AMS PSI/SCADA LDCB-702 SIEMENS 01.11.19 01:30:00

65 7 III MKPD FP PSI/SCADA SM-H KIRON 06.11.19 15:15:00


66 7 III MKPR RSS PSI TTCB702 MEGAWIN 09.11.19 05:30:00

67 7 III DKV RSS PSI AT706 T&R 11.11.19 04:58:45

68 7 III INA FP PSI CB767 SIEMENS 11.11.19 03:59:00

69 7 III SKPR ASS SCADA RTU SIEMENS 12.11.19 12:50:00

NARAINA
70 7E III KKDC ASS PSI PT (MVCB-11) 12.11.19 22:30:00
POWER TECH.

71 7 III MKPR RSS SCADA LBCB 702 SCHINEDER 18.11.19 06:00:00

ALL FEEDRERS
72 7 III INA TSS SCADA/PSI SIEMENS 21.11.19 01:10:00
PT

73 7E III YV RSS PSI AT712 T&R 28.11.19 11:10:00

74 7 III LJPN ASS#2 SCADA CPU1 SEIMENS 01.12.19 12:15:00

75 7 III MKPR RSS SCADA CB 702 SCHINEDER 01.12.19 06:00:00

76 7E III VND RSS SCADA CIS710 SEIMENS 02.12.19 15:00:00

77 7E III VNNR TSS SCADA SP 714 SIEMENS 03.10.19 15:00:00


78 7E III MVPO SSP PSI/SCADA BM- 60 MEGAWIN 08.12.19 22:00:00

79 7 III LJPN ASS-2 SCADA MVCB-2 14.12.19 09:00:00

80 7E III VNNR TSS PSI/SCADA CB-739 SIEMENS 16.12.19 05:30:00

81 7E III YV RSS PSI/SCADA TTIS-711 16.12.19 00:30:00

82 7 III DDSC FP SCADA/PSI CS-03 &01 PROAT 16.12.19 14:00

83 7E III VNNR TSS PSI/SCADA 25 KV I/C CB-714 SIEMENS 19.12.19 05:30:00

84 7 III MYPI SCADA CPU1 SEIMENS 27.12.19 12:00:00

85 7 III MVPO SSP SCADA BM58 & 60 MEGAWIN 27.12.19 16:00:00

86 7 III MKPD OHE CMV PHOOLTAS 30.12.19 18:00:00

CB-
87 7 III INA TSS SCADA SIEMENS 31.12.19 05:00:00
719,721,723,725

88 7 III YV TSS SCADA CB-741 SIEMENS 03.01.19 05:00:00

89 7 III MKPR TSS SCADA CB-702 MEGAWIN 07.01.20 1:00


90 7 III DKVTSS SCADA PFR LOGIC SIEMENS 10.01.20 02:00:00

91 7E III YV TSS PSI/SCADA CB-745 MEGAWIN 11.01.20 1:00

JIEE AND LVCB-1,2 AND


92 7E III PSI/SCADA OMEGA(L&T) 13.01.20 8:52:52
EANR LVCCB

93 7E III YVR RSS PSI CIS-712 S&S 15.01.20 12:30

94 7E III VND RSS PSI SP 735 SCHIENDER 18.01.20 11:45

LVCB-1,2 AND
95 7E III ANVT PSI/SCADA OMEGA(L&T) 18.01.20 8:40:00
LVCCB

96 7E III VND RSS SCADA COMMUNICATION SEIMENS 23.01.20 17:35

97 7E III VND TSS SCADA CB-714 & SP-714 SEIMENS 23.01.20 17:35

98 7E III MV ASS PSI/SCADA MVCB-11 SIEMENS 25.01.20 13:00:00

99 7 III MKPR TSS SCADA/PSI SP-702 MEGAWIN 25.01.20 13:25

LIS702-1,LIS702-
2,CCB-701,CCB-
100 7 III MKPR RSS SCADA MEGAWIN 28.01.20 1:00
702,SP-702, CB-
702

29.01.202
101 7 III RG FP PSI CB 757 MEGAWN 4:23
0

01.02.202
102 7 III MKPD FP PSI/SCADA SM-J KIRON 18:00:00
0

02.02.202
103 7 III INA TSS PSI/SCADA CB-727 & CB-729 MEGAWN 01:05:00
0

104 7E III SVVR ASS PSI/SCADA MVCB-2 SIEMENS 06.02.20 06:00:00


T LIST OF LINE-07 & EXT. UP TO 03.02.2020
RECTIFI
DESCRIPTION OF FAILURE
CATION

DATE TIME

BUS BAR COLORATION OF RSS NOT WORKING.


SHOWING PERMANENTLY IN HEALTHY CONDITION.
BUS BAR LOGIC SHOULD BE PROVIDED WITH PT AND
SWICH BASED.

SHOWING RIO L/R STATUS (RTU) STATUS LOCAL.

BATTERY VOLTAGE SHOWING ZERO.

RELAY COMMUNICATION STATUS NOT GIVEN AT ASS


1 & 2 SCADA PAGE& FO COMMUNICATION STATUS
SHOWING FAIL

PT OF Y-B PHASE OF MVCB-21 IS FAULTY.

BUSBAR COLOURATION OF UP&DN FEEDER


SHOWING RED WHILE OUTGOING BUSBAR IS
CHARGED FROM LINE-2 AND PT IS SHOWING
HEALTHY. NORMAL AT INA RSS END
BM 34 OF DN LINE SIDING IS SHOWING UNIT HEALTHY
FAIL. IN SCADA.
SCADA permisive also shown continue

PTs NOT UPDATED IN OCC SCADA & MVCB-2


SHOWING INTERMEDIATE

LT TESTING STILL PENDING IN LINE 7 EXT.

SCADA PERMISSIVE COMMAND NOT TRANSFERED

NOT OPEN FROM OCC/SCADA & OPRATED LOCALY


BY STAFF

PT OF TSS I/C CB-712 SHOWING VALUE 893KV.

MVCB 21 NOT CLOSING BY SCADA .

MVCB 22 NOT CLOSING BY SCADA .

25 KV PTs STATUS NOT UPDATED IN OCC SCADA i.e,


SHOWING 0 KV IN CHARGE CONDITION
MVCB 12 AT EANR ASS WAS NOT CLOSING BY SCADA
AS WEL AS ELECTRICALLY BY PSI STAFF SAME
CLOSED MECHANICALLY.
CB -737 NOT CLOSING BY SCADA ITS ONLY OPENING
BY SCADA.OPERATOR CHECKED AND FOUND NO
ANY INDICATION ON CB CLOSED BY CC.
SP-731 NOT OPERATING BY SCADA. IN CLOSE
CONDITION IT'S STATUS IS SHOWING
INTERMEDIATE.
MVCB 12 & 22 AT JFRB ASS WAS NOT CLOSING BY
SCADA AS WEL AS ELECTRICALLY BY PSI STAFF
SAME CLOSED MECHANICALLY.

UNIT HEALTHY FAILED FREQUENTLY


BM-68 IS OPENING AT UV ALTHOUGH ITS
SECTIONING BM.
RCCB 701 OPEN STATUS WAS NOT UPDATE IN OCC
SCADA WHILE IN LOCAL SCADA UPDATE PROPERLY.
R-Y PHASE LOW ALARM FREQUENTLY
KKDC,AVIT ASS,KKDA ANVT, KHNA LT CHANGE OVER
NOT BEING DURING SUPLY CHANGE OVER
RELAY COMMUNICATION STATUS SHOWING FAIL OF
ASS 1 & 2 SCADA PAGE& FO COMMUNICATION
STATUS
WHENEVER SCADA SHOWING FAIL IS THROUGH
COMMUINACTION
RTU-1, SOMETIMES STATUS OF ALL EQUIPMENT IS
SHOWING UNDEFINED IN SCADA BUT SAME IS
NORMALOPEN
LOCB 714 SHOWING THROUGH RTU-2.
IN OCC SCADA WHILE IN
FIELD SCADA IT IS CLOSED DUE TO THIS RSS BUS
COLOURISATION SHOWING RED
LVCB 1 STATUS SHOWING INTERMEDIAT,SHOWING
DC FAIL .

LVCB1 &MVCB 2 STATUS SHOWING


INTERMEDIAT,SHOWING DC FAIL .

PT OF RSS I/C CB-711 SHOWING VALUE67KV IN DEAD


CONDITION .
IN DG MOCK DRILL PT INDICATION SHOWING
HEALTHY IN DEAD CONDITION ( 33KV) AT ALL
STATION
MKPR AMS FEEDING ZONE BUS COLOURISATIN NOT
UPDATING IN OCC SCADA
IN DG MOCK DRILL PT INDICATION SHOWING
HEALTHY IN DEAD CONDITION ( 33KV) AT ALL
STATION

LBCB 703 NOT OPEN OCC SCADA

AFTER SCADA PLANT TAKE OVER CB 706 OPEN


AUTOMATICALY TRY TO CLOSE BUT AGAIN TRIPED

MKPR-SVMB 33KV CKT-2 BUS BAR COLOR NOT


UPDATE IN SCADA DURING CHANGEOVER.

MVCB-22B NOT CLOSED BY OCC/SCADA SAME


CLOSED BY PSI STAFF LOCALLY.

ALL FEEDERS PT OF VNNR TSS NOT SHOWING


VOLTAGE VALUE.

CB-708 WAS NOT OPENE/CLOSE FROM OCC SCADA.


SAME OPRATE BY LOCAL SCADA
BUS COLOURISATION & PT STATUS NOT UPDATING
AFTER OPENING CB 709 AT MKPR TSS ( AS BS-D NOT
OPRATE )
HOT SPOT TEMP SCANNER COMMUNICATION
STATUS ALARM COMMING FREQUENTLY.

NOT CLOSING BY SCADA. SAME CLOSED BY


MANNUAL STAFF.

MVCB-11 IS NOT OPERATING THROUGH SCADA.& FO


COMMUNICATION STATUS SHOWING FAIL

SCADA PERMISSIVE COMMAND SHOWING


PERMITTED AT ALL POST

AC UNDER VOLTAGE TRIPPING NOT WORKING

AC UNDER VOLTAGE TRIPPING NOT WORKING


SCADA COMMUNICATION OF BM-43 & CB-765 AT INA
FP IS FAIL IN CPU-2 WHILE IT IS NORMAL IN CPU-1.

CB STUCK STATUS & WPC SIGNAL NOT UPDATED IN


CB INFORMATION BOX

PT VALES ARE SHOWING HEALTHY AFTER


DISCHARGING OHE OF MAIN LINE

PT-01 IS NOT SHOWING THE CHARGED/DISCHARGED


CONDITION OF 25KV INFEED CABLE, RATHER IT
SEEMS THAT ITS JUMPERS ARE WRONGLY
CONNECTED.
ALL PT NOT SHOWING VALUE

SKPR CHARGER SHOWING FAILD ALWAYS SCADA AS


WELL FIELD

RELAY COMMUNICATION( FO,7SR80,SR12,SR24)


FAILED ALARM

CPU1 NOT COMMUNICATED OR FAILED FROM


SERVER

ONE CABLE OF EACH FEEDER CB-733, 737 HAS BEEN


FOUND DAMAGED.
BUSBAR COLOURIZATION OF DN LINE ASSOCIATED
WITH CS-04 IS SHOWING RED BUT DN LINE IS IN
CHARGED CONDITIONS
MVCB-20 NOT CLOSED BY OCC/SCADA .

BM-43 COULD NOT BE CLOSED THROUGH SCADA

AS PER PSI STAFF MCB RATING NOT PEOPER

AS PER PSI ITS CARD MALFUNCTIONING

STAND BY CHARGER ALWAYS FAIL IN SCADA & FIELD

BECOME INTERMEDIATE IN CLOSE CONDITION

ISOLATOR OPEN/CLOSE STATUS NOT UPDATE IN


SCADA

CB-712 DO NOT CLOSE FROM SCADA.

LDCB-702 DO NOT OPENED FROM OCC SCADA.

PT STATUS NOT UPDATED


NOT CLOSE FROM OCC SCADA SAME CLOSE
MANUALY BY STAFF

AT706 TRIPPED ON DIFFERNTIAL PROTECTION


DURING CHARGING

CB767 NOT CLOED BY TPC DURING CHARGING OF


OHE AFTER CANCELLATION OF P/B OF INA TSS.

OHE POST IS SHOWING RED WHEN LOAD IS ON CPU-


1 WHILE CHANGING CPU-1 TO CPU-2,MVCB-11 AT
SAKP ASS IS SHOWING CLOSED ALTHOUGH IT IS
OPEN IN FIELD AND CORRESPONDING EVENT IS
ALSO GETS GENERATED IN LOGBOOK OF MVCB 11.

AS PER PSI TEAM PT BURST OF MVCB-11 AT KKDC


ASS

LBCB 702 NOT UPDATED IN OCC SCADA SHOWING


OPEN LOCAL AND MTR OPERATED WHILE CLOSED
AND NORMAL IN FIELD

ALL FEEDERS PT OF INA TSS NOT UPDATING


VOLTAGE VALUE.

AT712 DGA VALUE OF MAIN TANK IS NOT PROPER


SO IT IS UNFIT FOR TAKING LOAD OR HOT STAND BY

CPU1 NOT COMMUNICATED OR FAILED FROM


SERVER OR MVCB 2 SHOWS OPEN

SHOWING OPEN IN SCADA WHILE CLOSE IN FIELD

NOT OPRATE FROM OCC BUT LOCAL SCADA


OPRATIO NORMAL

NOT OPRATED FROM OCC/SCADA


BM SHOWING INTERMEDIATE INTERMITTENTLY IN
SCADA.

MVCB-2 STATUS NOT UPDATE IN SCADA WHEN CPU


-1 IS HOT.

DO NOT OPEN FROM OCC/SCADA

TTIS-711 DO NOT OPETARE FROM OCC SCADA.

PT VALUE IS NOT UPDATING. PTs SHOWING ZERO


VALUE.

OPEN/CLOSE STATUS NOT UPDATED IN OCC SCADA

PT & BREAKER POSITION NOT UPDATING FROM


CPU#1

BM -58 AND BM60 SHOWING INTERMEDIATE AT MVPO

water pump of CMV engine is not working

ALL FEEDERS CB OF INA TSS ARE NOT CLOSE FROM


OCC AND LOCAL SCADA

FEEDERS CB 741 OF TSS ARE NOT CLOSE FROM


OCC AND LOCAL SCADA

CB-702 DO NOT OPERATE FROM OCC SCADA. LOCAL


SCADA OPETATION FOUND OK.
DKV TSS PFR LOGIC DO NOT BYPASS FROM OCC.

CB-745 DO NOT OPERATE FROM OCC SCADA. .

AUTO CHANGEOVER COULD NOT CARRIED OUT AT


JIEE AND EANR ASS. LT BREAKERS OPEN/CLOSE
COMMAND ALSO NOT EXECUTING REMOTELY. AT
JIEE ASS, OPEN/CLOSE INDICATION NOT UPDATING
PROPERLY.
CIS-712 IS UNFIT DUE FLASHOVER MARK IN ITS
PI.NOW THE BUS BAR CKT-2 HAS BEEN CHARGED
FROM I/C-2

SHOWING INTERMEDIATE IN OCC SCADA

ALL BREAKERS SHOWING CLOSE IN SCADA AS WELL


AS PHYSICALLY CLOSE IN FILED.

SCADA COMMUNICATION FAILED & HANGED DURING


INCOMMER FAILURE AT VND RSS

STATUS NOT UPDATE IN SCADA.

MVCB-11 DO NOT CLOSED BY OCC/SCADA .

SP-702 DO NOT OPERATE FROM OCC SCADA.

EQUIPMENT NOT OPERATED FROM OCC SCADA.


LOCAL SCADA OPERATION CHECKED FOUND OK.

NOT OPENING THROUGH REMOTELY AS WELL AS


LOCALLY AND SHOWING BREKER FAIL STATUS AT
THE TIME OF OPERATION.

SM-J NOT OPENED THROUGH REMOTELY AS WELL


AS LOCALLY BY JE/OHE

CB-727 &CB-729 NOT CLOSED BY OCC SCADA AS


WELL AS LOCAL SCADA SAME CLOSED BY RSS
STAFF LOCALLY BUT OPEN BY OCC SCADA NORMAL

MVCB-2 NOT OPENED BY OCC SCADA.SAME WAS


CLOSED LOCALLY
FAILURE
REMARKS/RECTIFICATION DETAILS TDC-3 TDC-1 TDC-2 REMARK
CODE

INFORMED TO SIEMENS AND PROJECT


U 15.02.19 3/30/2019 15.08.19
FOR ITS RECTIFICATION

SCADA
TESTING FOR
SAME IS
SCADA
PENDING AND
TESTING FOR
COMMUNICAT
SM NC 15.02.19 20.03.19 15.08.19 SAME IS
ED TO
PENDING AND
SCADA TESTING FOR SAME IS PROJECT FOR
COMMUNICAT
PENDING AND COMMUNICATED TO C 15.02.19 15.03.19 15.08.19 ITS
ED TO
PROJECT FOR ITS RECTIFICATION RECTIFICATIO
PROJECT FOR
N
ITS
RECTIFICATIO
N

SCADA TESTING FOR SAME IS


PENDING AND COMMUNICATED TO C 15.02.19 15.03.19 15.08.19
PROJECT FOR ITS RECTIFICATION

TO BE ATTENDED BY PSI STAFF.


CHHECKED AND FOUND OK FROM NC 15.01.19 15.03.19 15.08.19 Rectified
SCADA END

INFORMED TO SIEMENS AND


PROJECT FOR ITS RECTIFICATION.
VC 15.02.19 15.03.19 15.08.19
ALREADY INFORMED TO SIEMENS
SCADA EXPERT FROM GERMANY.
INFORMED TO PSI/SCADA STAFF FOR RECTIFIED AS
C 15.02.19 15.03.19 15.08.19
ITS RECTIFICATION. PER ASE/PSI

MVCB2 PROBLEM CHECKED AT RTU


END, FOUND OK. INTERMEDIATE PT 171 IS
SIGNAL COMING FROM FIELD. PT-171 UNDER
C NA 15.08.19
WAS NOT SHOWING VALUE AS PANEL COMMISIONIN
IS OFF CONDITION IN FIELD. NO G
PROBLEM FOUND ON SCADA END.

INFORMED TO PSI/SCADA STAFF FOR


ITS RECTIFICATION.TESTING WORK U 15.02.19 15.03.19 15.08.19
UNDER PROGRESS.

INFORMED TO PSI/SCADA STAFF FOR


ITS RECTIFICATION. CHECKED AND
FOUND INDICATION NOT UPDATING AT C 15.02.19 15.03.19 15.08.19
OCC. SAME WILL BE AGAIN CHECKED
BY SIEMENS
DURING RTU EXPERT.
JOINT CHECK WITH PSI &
PROJECT IT WAS FOUND THAT THERE C 15.08.19
IS 2/3 INTERLOCKING BW

INFORMED TO
INFORMED TO SCADA/PSI STAFF. VC 15.02.19 15.03.19 15.08.19 SCADA/PSI
STAFF.

FAULTY DIFF
RELAY TAKEN
OUT BY
TO BE ATTENDED BY PSI/SCADA
VC 15.02.19 15.08.19 SIEMENS
STAFF.
PROJECT FOR
RECTIFICATIO
N. DIFF
FAULTY
RELAY TAKEN
OUT BY
TO BE ATTENDED BY PSI/SCADA
VC 15.02.19 15.08.19 SIEMENS
STAFF. INFORMEDFOR TO
PROJECT
SCADA STAFF
RECTIFICATIO
INFORMED TO SCADA/PSI STAFF. VC 15.02.19 15.03.19 15.08.19 FORN.ITS
RECTIFICATIO
TO BE
N.
ATTENDED BY
INFORMED TO PSI STAFF. 15.02.19 15.08.19
SCADA/ PSI
STAFF.
INFORMED TO
TO BE ATTENDED BY PSI STAFF. C 15.02.19 15.03.19 15.08.19
SCADA TEAM.

TO BE ATTENDED BY SCADA/ PSI FAULTY DIFF


C 15.02.19 15.03.19 15.08.19
STAFF. RELAY TAKEN
OUT BY
INFORMED TO PSI STAFF. C 15.02.19 15.08.19 SIEMENS
PROJECT
TO BEFOR
TO BE ATTENDED BY PSI /SCADA RECTIFICATIO
ATTENDED BY
C 3/6/2019 15.08.19 N.
STAFF. PSI /SCADA
STAFF.
TO BE
TO BE ATTENDED BY SCADA STAFF. 15.08.19 ATTENDED BY
SCADA STAFF.

INFORMED TO PSI & SCADA TEAM. 15.08.19 RECTIFIED

INFORMED TO SCADA/PSI STAFF. U 15.02.19

SCADA TESTING FOR SAME IS


PENDING AND COMMUNICATED TO C 15.02.19
PROJECT FOR ITS RECTIFICATION
INFORMED TO SCADA STAFF. AS PER
SCADA IT WAS RECTIFIED BUT C
PROBLEMTO
INFORMED IS PERSISTED.
SIEMENS AND
PROJECT FOR ITS RECTIFICATION.
VC 15.02.19 15.03.19 15.08.19
ALREADY INFORMED TO SIEMENS
SCADA EXPERT FROM GERMANY. TO BE
ATTENDED BY
SAME ATTENDED BY SCADA STAFF C
SCADA/ PSI
TO BE
STAFF.
ATTENDED BY
INFORMED TO PSI/SCADA STAFF. C
SCADA/ PSI
STAFF. TO
INFORMED
INFORMED TO SCADA/PSI STAFF. VC 15.02.19 15.03.19 15.08.19 SCADA/PSI
STAFF.
INFORMED TO
INFORMED TO SCADA/PSI STAFF. C SCADA/PSI
STAFF.
INFORMED TO
INFORMED TO SCADA/PSI STAFF. VC 15.02.19 15.03.19 15.08.19 SCADA/PSI
STAFF.
INFORMED TO
INFORMED TO SCADA/PSI STAFF. C SCADA/PSI
STAFF.

INFORMED TO SCADA/PSI STAFF. VC 15.02.19 15.08.19

INFORMED TO SCADA/PSI STAFF.


CHECKED AND FOUND NO VC 15.02.19
ABNORMALITY IN SCADA

INFORMED TO SCADA STAFF. VC 15.02.19

INFORMED TO PSI AND SIEMENS


C 25.08.19
PROJECT FOR ITS RECTIFICATION.

INFORMED TO SCADA/PSI STAFF. VC

INFORMED TO SCADA STAFF. C RECTIFIED

INFORMED TO ALL CONCERNED.. VC 15.02.19

TO BE
INFORMED TO ALL CONCERNED.. NC ATTENDED BY
SIEMENS

INFORMED TO ALL CONCERNED.. C

INFORMED TO PSI/SCADA STAFF FOR


VC Rectified
ITS RECTIFICATION.

INFORM TO SCADA TEAM C

INFORMED TO PSI/SCADA STAFF FOR


C 15.02.19
ITS RECTIFICATION.

INFORMED TO PSI/SCADA STAFF FOR


C 15.02.19
ITS RECTIFICATION.
INFORM TO SCADA STAFF C

INFORMED TO SCADA/PSI STAFF. NC 15.02.19

INFORM TO SCADA STAFF C 15.02.19

INFORM TO PSI STAFF TO CHECK IN


VC 15.02.19
NEXT NIGHT.

TO BE ATTENDED BY PSI/SCADA
VC 15.02.19
STAFF.

INFORMED TO ALL CONCERNED.. C 15.02.19 RECTIFIED

INFORMED TO ALL CONCERNED.. C 15.02.19

INFORMED TO SCADA STAFF. 15.02.19

INFORMED TO ALL CONCERNED.. 15.02.19

INFORMED TO PSI AND SCADA STAFF NC 15.02.19 RECTIFIED

INFORMED TO PSI AND SCADA FOR


C
ITS RECTIFICATION.

INFORM TO PSI/SCADA STAFF C RECTIFIED

INFORMED TO PSI AND SIEMENS


C 25.08.19
PROJECT FOR ITS RECTIFICATION.

INFORMED TO PSI AND SIEMENS


C 25.08.19
PROJECT FOR ITS RECTIFICATION.

INFORMED TO PSI AND SIEMENS


C 25.08.19
PROJECT FOR ITS RECTIFICATION.
TO BE
TO BE ATTENDED BY PSI /SCADA ATTENDED BY
C 3/6/2019 15.08.19
STAFF. PSI /SCADA
STAFF.

INFORMED TO ALL CONCERNED.. C 15.02.19 RECTIFIED

INFORMED TO ALL CONCERNED.. C 15.02.19

INFORMED TO ALL CONCERNED.. C 15.02.19

INFORMED TO ALL CONCERNED.. C 15.02.19 RECTIFIED


INFORM TO PSI STAFF C 15.02.19 RECTIFIED

INFORMED TO ALL CONCERNED.. C RECTIFIED

INFORMED TO ALL CONCERNED.. C RECTIFIED

INFORMED TO ALL CONCERNED.. C 15.02.19

INFORMED TO ALL CONCERNED.. C

INFORMED TO SCADA/PSI STAFF. VC 15.02.19 RECTIFIED

INFORMED TO SCADA/PSI STAFF. VC RECTIFIED

INFORMED TO ALL CONCERNED.. C

INFORMED TO ALL CONCERNED.. C

INFORMED TO SCADA/PSI STAFF. VC 15.02.19

INFORMED TO SCADA/PSI STAFF. VC 15.02.19

INFORMED TO ALL CONCERNED.. 15.02.19


INFORMED TO ALL CONCERNED.. C

INFORMED TO SCADA STAFF. C

INFORMED TO ALL CONCERNED..

INFORMED TO ALL CONCERNED.. C

INFORMED TO ALL CONCERNED.. C RECTIFIED

SAME IS ATTENDED AND RECTIFIED.

INFORMED TO PSI/SCADA STAFF FOR


C
ITS RECTIFICATION.

INFORMED TO PSI/SCADA STAFF FOR


C
ITS RECTIFICATION.

INFORMED TO SCADA STAFF. VC

INFORMED TO PSI & SCADA STAFF. VC

INFORMED TO PSI & SCADA STAFF. U


INFORMED TO SCADA STAFF. C

INFORMED TO PSI & SCADA STAFF. U

INFORMED TO ALL CONCERNED.. C

INFORMED TO PSI STAFF. U

INFORMED TO PSI STAFF. U

INFORMED TO ALL CONCERNED.. C

INFORMED TO SCASA STAFF. C

INFORMED TO PSI /SCASA STAFF. VC

INFORMED TO PSI AND SCADA FOR


C
ITS RECTIFICATION.

INFORMED TO PSI & SCADA STAFF. C

INFORMED TO SCADA STAFF. C

INFORMED TO PSI STAFF. C

INFORMED TO ALL CONCERNED.. C

INFORMED TO ALL CONCERNED.. C

INFORMED TO SCADA STAFF. C


Phase POST/ DEPARTMEN
SN LINE I&II or LOCATION T
III

1 8 III BCGN SS & FP PSI/SCADA

2 8 III KJMD RSS PSI/SCADA

3 8 III JLA ASS SCADA

JLA ASS-KIKJ
4 8 III PSI
ASS

5 8 III OBC SP PSI/SCADA


6 8 III JLA SSP PSI/SCADA

7 8 III IWNR SS PSI/SCADA

8 8 III KJMD TSS SCADA

9 8 III KIKJ -JLA PSI

10 8 III PALM RSS SCADA


11 8 III OKNS FP PSI/SCADA

12 8 III OBC/ASS PSI/SCADA

13 8 III KIKJ -JLA PSI

14 8 III KJMD SSP PSI

15 8 III KIKJ -JLA PSI

16 8 III KIKD FP PSI/SCADA

SKVR SSP-SABR
17 8 III SCADA
SS

18 8 III KIKJ -JLA PSI

19 8 III CDLI SP SCADA


20 8 III JLA SSP SCADA

21 8 III PALM RSS PSI/SCADA

22 8 III JLA SSP SCADA

23 8 III KJMD RSS SCADA

24 8 III IIT ASS-2 PSI/SCADA

25 8 III RKPM AMS SCADA/PSI

26 8 III RKPM RSS PSI

27 8 III KIKJ -JLA PSI

28 8 III KIKJ -OBS PSI

29 8 III SABR SS PSI/SCADA


30 8 III JANR-OVA PSI

31 8 III OVA-JLA PSI

32 8 III OVA-JLA PSI

33 8 III STVR RSS SCADA/PSI

34 8 III SABR SS SCADA

35 8 III KIKJ-OBC PSI

36 8 III KJMD RSS SCADA

37 8 III OBS-KIKJ PSI

38 8 III SABR SP SCADA

39 8 III OBS-BCGN PSI

40 8 III OBS-BCGN PSI

41 8 III JPW ASS-2 SCADA


42 8 III JPW ASS-2 SCADA

43 8 III RKPM AMS SCADA

44 8 III RKPM TSS SCADA

45 8 III IIT ASS-2 PSI/SCADA

46 8 III PALM RSS SCADA

47 8 III JLA-LIKJ PSI

48 8 III JLA SSP PSI


49 8 III JPW-PSPK SCADA

50 8 III RKPM TSS SCADA

51 8 III RKPM ASS-2 SCADA

52 8 III RKPM FP & SS SCADA

53 8 III JPW-KJMD SCADA


54 8 III RKPM RSS PSI/SCADA

55 8 III JLA-OVA PSI

RKPM FP &
56 8 III SCADA
PLAM FP

57 8 III BCGN TSS SCADA

58 8 III OVA-JLA PSI


59 8 III KIKD FP SCADA

DSHP,PLAM,IGD
60 8 III A & KJMD ASS PSI/SCADA
1&2

SABR,,MIRK &
61 8 III PSI/SCADA
PSPK ASS-1&2

62 8 III KIKD FP PSI/SCADA

63 8 III RKPM TSS PSI

64 8 III JLA SSP SCADA

65 8 III RKPM ASS-1 SCADA

66 8 III SKVR ASS PSI/SCADA

67 8 III KJMD TSS SCADA


68 8 III NUEE ASS-1 PSI/SCADA

69 8 III PLAM ASS-2 PSI/SCADA

70 8 III IIT ASS-2 PSI/SCADA

71 8 III PALM RSS SCADA\PSI

72 8 III JANR-OVA PSI

73 8 III OBC SP PSI


74 8 III JLA SSP PSI/SCADA
75 8 III BCGN SS & FP PSI/SCADA
76 8 III SKVR SSP PSI/SCADA

77 8 III KIKD FP PSI

78 8 III BCGN TSS SCADA

79 8 III NUEE ASS-2 PSI/SCADA

80 8 III RKPM ASS-2 PSI/SCADA

81 8 III KJMD RSS SCADA

82 8 III JANR-OVA PSI


83 8 III KJMD ASS-2 PSI
84 8 III OVA-JLA PSI

85 8 III OVA-JLA PSI

86 8 III IGDA ASS-2 SCADA

87 8 III KJMD ASS-2 SCADA

88 8 III PLAM AMS PSI

89 8 III PALAM ASS#2 SCADA

90 8 III KJMD ASS-1 SCADA

91 8 III KJMD ASS-1 SCADA

92 8 III KIKD FP PSI/SCADA

93 8 III KJMD TSS SCADA


94 8 III KJMD TSS SCADA

95 8 III KIKD FP PSI/SCADA

96 8 III JLA SSP SCADA

97 8 III RKPM AMS PSI

98 8 III PALM RSS PSI

99 8 III KJMD RSS SCADA


100 8 III JLA ASS SCADA

101 8 III SABR ASS SCADA

102 8 III KIKD FP SCADA

103 8 III KIKD FP SCADA/PSI

104 8 III RKPM AMS SCADA/PSI


105 8 III RKPM AMS SCADA/PSI

106 8 III KIKD ASS SCADA/PSI

107 8 III RKPM RSS PSI

108 8 III STVR TSS SCADA/PSI

109 8 III OBC SP SCADA

110 8 III OBC SP PSI/SCADA

111 8 III RKPM TSS SCADA


112 8 III RKPM TSS SCADA

113 8 III OVA-JLA PSI

114 8 III OKNS ASS PSI


FAILURE/DEF
MAKE FAILURE
EQUIPMENT
/MODEL DATE TIME

PT- 46,47 48 & 49 MEGAWIN 26.12.17 07:00:00

DCDB JASPER 05.01.18 10:13:00

LVCCB OMEGA 25.01.18 01:17:00

CABLE R, Y& B PHASE UNIVERSAL 24.02.18 01:59:00

PT, 42,43,44,45 MEGAWIN 09.04.18 07:00:00


PT-41 MEGAWIN 09.04.18 07:00:00

PT-35, 36 MEGAWIN 09.04.18 07:00:00

CB- 819,821, 823 & 825 MEGAWIN 13.04.18 00:19:00

CABLE 33 KV UNIVERSAL 29.05.18 02:15:00

BUS BAR 66KV I/C AND


SIEMENS 01.06.18 01:45:00
33KV
PT 31,32,33, 34 MEGAWIN 14.06.18 07:00:00

PT-821 MEGAWIN 19.06.18 12:35:00

CABLE 33 KV UNIVERSAL 22.06.18 02:15:00

AUTO/MANUAL OF
MEGAWIN 25.06.18 1:00:00
BM837

CABLE 33 KV UNIVERSAL 28.06.18 13:15:00

PTD- 830 MEGAWIN 08.07.18 01:20:00

BUS BAR COLOR SIEMENS 17.07.18 05:20:00

CABLE 33 KV UNIVERSAL 23.07.18 08:37:00

BM-833 & BM-834 SIEMENS 17.08.18 00:40:00


BUS BAR SIEMENS 28.08.18 1:20:00

LIS 801-1 SIEMENS 04.09.18 12:31:00

BM-849 MEGAWIN 08.10.18 08:00:00

66 KV I/C-1 PT CGL 14.10.18 02:10:00

MVCB-821 SCHNEIDER 15.1018 22:00:00

LBCB-806 SIEMENS 21.10.18 13:00:00

LCB-805 & 806 SIEMENS 21.10.18 12:35:00

CABLE 33 KV UNIVERSAL 29.01.18 03:30:00

CABLE 33 KV UNIVERSAL 08.11.18 01:10:40

PT-18 MEGAWIN 13.11.18 23:00:00


CABLE 33 KV UNIVERSAL 15.11.18 23:01:00

CABLE 33 KV UNIVERSAL 15.11.18 23:01:00

CABLE 33 KV UNIVERSAL 01.12.18 22:20:00

LEIS 811 SIEMENS 14.12.18 0105H

PT-17 & 18 MEGAWIN 18.12.18 00:30:00

CABLE 33 KV UNIVERSAL 30.12.18 11:00:00

BUS BAR 66KV 33KV


SIEMENS 7:01:19 03:33:59
& 25 KV

CABLE 33 KV UNIVERSAL 07.01.19 10:20:00

PT-15 MEGAWIN 11.01.19 00:30:00

CABLE 33 KV UNIVERSAL 30.01.19 02:45:56

CABLE 33 KV UNIVERSAL 02.02.19 14:05:00

PT-283 SCHNEIDER 12.02.19 16:15:00


BPT-802 SCHNEIDER 12.02.19 16:15:00

EIS SIEMENS 12.02.19 16:15:00

CB-815, SP-815 SIEMENS 07.03.19 00:38:00

MVCB-822 SCHNEIDER 07.03.19 14:15:00

AMS SIEMENS 11.03.19 10:00:00

CABLE 33 KV UNIVERSAL 25.03.19 01:51:00

PT-41 MEGAWIN 25.03.19 05:56:47


33 KVBUS BAR COLOR SIEMENS 26.03.19 01:00:00

SP-815 SIEMENS 30.03.19 01:00:00

MVCB-821 SIEMENS 30.03.19 05:00:00

25 KVBUS BAR COLOR SIEMENS 04.04.19 05:17:00

33 KV BUS BAR SIEMENS 05.04.19 17:45:00


ATIS 806-2B SIEMENS 08.04.19 10:20:00

CABLE 33 KV UNIVERSAL 27.04.19 04:00:00

PT OF CB
MEGAWIN 03.05.2019 00..35
885,886,887,888

PT OF CB 829 MEGAWIN 03.05.2019 03:30:00

CABLE 33 KV UNIVERSAL 19.05.19 11:18:00


BUSBAR SIEMENS 28.05.19 14:19:00

ACDB 28.05.19 21:10:00

DCDB 28.05.19 21:10:00

SMD-830 SCHNIDER 31.05.19 19:00:00

CB-815 SIEMENS 01.06.19 05:03:00

BM-849 MEGAWIN 13.06.19 06:00:00

MVCB-812 SIEMENS 15.06.19 05:00:00

MVCB-821 SIEMENS 18.06.19 14:30:00

CB- 819,821, 823 & 825 MEGAWIN 21.06.2019 07:55:12


MVCB-811 SCHNEIDER 21.06.2019 17:44:00

MVCB-822 SCHNEIDER 22.06.2019 06:00:00

MVCB-822 SCHNEIDER 22.06.2019 06:00:00

LBCB 801 CGL 02.07.19 15:45:00

CABLE 33 KV UNIVERSAL 03.07.19 01:32:00

PT-44 MEGAWIN 05.07.19 11:43:58


PT-39 MEGAWIN 17.07.19 07:00:00
PT-47'49 MEGAWIN 17.07.19 07:00:00
PT-20,21 MEGAWIN 17.07.19 07:00:00

SMD-831 SCHNIDER 18.07.19 19:00:00

PT829 MEGAWIN 28.07.2019 07:05:20

MVCB-821 SCHNEIDER 02.08.2019 01:00:00

MVCB-821 SCHNEIDER 02.08.2019 01:00:00

COMMUNICATION SIEMENS 05.08.2019 14:00:00

CABLE 33 KV UNIVERSAL 24.08.19 23:34:33


MVCB-821 SCHNEIDER 26.08.2019 01:30:00
CABLE 33 KV UNIVERSAL 31.08.19 22:27:14

CABLE 33 KV UNIVERSAL 10.09.19 00:39:55

MVCB824 SCHNEIDER 20.09.19 18:00:00

MVCB821 SCHNEIDER 21.09.19 01:00:00

SST802 ABB 22.09.19 01:05:00

charger statcon 27.09.19 15:05:00

MVCB186 SCHNEIDER 03.10.19 17:00:00

MVCB 811 SCHNEIDER 14.10.19 02:00:00

BSD-882 MEGAWIN 06.11.19 22:30:00

CB-825 PT MEGAWIN 08.11.19 10:50:00


CB-825 & 819 MEGAWIN 11.11.19 05:30:00

BSD-882 MEGAWIN 18.11.19 18:08:00

SM806 SCHNIDER 25.11.19 05:00:00

LBCB-805 SIEMENS 17.12.19 02:00:00

AT-802 T&R 17.12.19 01:40:00

PFR LOGIC SIEMENS 23.12.19 07:15:00


LVCCB C&S 31.12.19 08:00:00

LVCB-1,2 & LVCCB C&S 31.12.19 08:00:00

SMD-830,835,836 & 837 S&S 31.12.19 08:00:00

BSD 882 SIEMENS 08.01.20 10:00:00

LBCCB802 SIEMENS 10.01.2020 22:00:00


RCCB805 SIEMENS 10.01.2020 22:00:00

ACDB JASPER 11.01.2020 14:00:00

LOFEIS 810 SCHNEIDER 15.01.2020 18:00:00

CB-833 MEGAWIN 20.01.20 17:35:00

PT-42,43,44,45 MEGAWIN 26.01.20 02:00:00

BM851 MEGAWIN 26.01.20 02:00:00

CB-809,811,813,815,806 SIEMENS 04.02.20 05:00:00


VTB-804 &806 SIEMENS 04.02.20 00:30:00

CABLE 33 KV UNIVERSAL 05.02.20 01:23:00

TR-802 ABB 05.02.2020 08:16:55


FAILURE/DEFECT LIST OF LINE-08 UP TO 06.02.2020
RECTIFICATION
DATE TIME
06.02.20 05:10:00

06.02.20 01:15:00
T OF LINE-08 UP TO 06.02.2020
DESCRIPTION OF FAILURE

PT VALUE SHOWING ZERO KV.

DCDB BREAKER STATUS NOT PROPER


,BATTERY CHARGER STATUS NOT
UPDATED. 415V BUS BAR COLOUR NOT
UPDATEING.

SHOWING INTERMEDIATE IN OPEN


CONDITION

MVCB 821& 822 TRIPPED ON MTR &


PILOT WIRE PROTECT.

PT VALUE SHOWING ZERO KV.


PT VALUE SHOWING ZERO KV.

PT VALUE SHOWING ZERO KV IN


CHARGE CONDITION.

PT OF OUTGOING FEEDER 819,821, 825


&823, SHOWING 25KV AFTER OPENING,
PHYSICALLY CHECKED BY RSS
OPERATOR FOUND CB IN OPEN
CONDITION AND MAIN LINE ISOLAOTR
SM801, 02,803 &804 ALSO IN OPEN
CONDITION.
33 KV CABLE THEFT BETWEEN KIKJ TO
JLA
31/54 - 31/48 B PHASE LENGTH APPROX
125 METER.
31/50 - 31/48 R,Y PHASE
LENGTH APPROX 25 - 25 MTR. EACH.

WHEN 33KV PALM AMS RCCB-801 OPEN


SAME TIME 66KV I/C & BUS BAR AND 33
KV BUS BAR COULORIZATION BECOME
RED AND CLOSE RCCB-801 THEN ALL
NORMAL SAME TIME.
PT VALUE SHOWING ZERO KV IN
CHARGE CONDITION.

PT VALUE SHOWING ZERO KV IN


CHARGE CONDITION.

33 KV CABLE TRYING TO THEFT


BETWEEN KIKJ TO JLA
31/26 - 31/28 LENGTH APPROX 20-20
METER. 2NO CABLE

KJMD SSP AUTO/MANUAL SWITCH IS


33
NOTKVPROVIDED.
CABLE THEFT BETWEEN KIKJ TO
JLA
31/44 - 31/48 B PHASE LENGTH APPROX
120 METER.
31/48 - 31/56 ,Y,B PHASE
PT SHOWING HEALTHY AND E/S
COLOUR GREEN WHILE ISOLATOR SMD
830 IS OPEN
UP LINE IN FIELD
SHOWING CHARGED WHEN I
CLOSE CB-811 (DN-1 MIRK) AT RKPM
TSS. WETHER ALL BM OF SABR SP &
33 KV CABLE THEFT BETWEEN KIKJ TO
RKPM FP ARE IN OPENED CONDION.
JLA
32/08 - 32/14 ALL THREE PHASE LENGTH
APPROX 540 METER.
PARALLING BM WAS NOT OPENED ON
UNDER VOLTAGE AUTOMATICALLY IN
AUTO MODE.
DURING CHARGING AND DISCHARGING
OF OHE BUS BAR COLORATION OF JLA
SSP NOT UPDATING. IT IS UPDATING
COLORATION AFTER CPU CHANGEOVER
EVERY TIME.

ISOLATOR LIS 801-1 NOT GETTING


CLOSE FROM OCC AND LOCAL SCADA.

PARALLING BM-849 DO NOT OPEN ON


UNDER VOLTAGE IN AUTO MODE.

PT SHOWING 66KV VALUE WHILE 66 KV


I/C-1 IS IN DEAD CONDITION.

FO COMMUNICATION FAILED ALARM


APPEARING FREQUENTLY IN ALARM
LIST
LBCB-806 DO NOT CLOSE FROM
OCC/LOCAL SCADA

LCB-805 & 806 DID NOT OPEN ON U/V


DURING DTL FAILURE.
33 KV CABLE THEFT BETWEEN KIKJ TO
JLA
32/12-14 R,Y,B PHASE IN 03 PIECES (26', 37'
& 38' LENGTH APPROX 30 METER.
33 KV CABLE THEFT BETWEEN KIKJ TO
OBS
33/12-14 SINGLE PHASE IN 03' LENGTH
APPROX 25 METER.

PT-18 AT SABR SS HAS BEEN BURSTED.


33 KV CABLE THEFT BETWEEN JANR-
OVA AT LOC 28/20-28/26
B PHASE LENGTH APPROX 80 METER.
33 KV CABLE THEFT ATTEMPT FOUND
BETWEEN OVA-JLA AT LOC 29/18
R PHASE
33 KV CABLE THEFT ATTEMPT FOUND
BETWEEN OVA-JLA AT LOC 29/08 to 29/14

LEIS 811 SHOWING UNDEFINED AT OCC


SCADA AND LOCAL SCADA AFTER
CLOSING WHILE PROPERLY CLOSED IN
ES-81901
FIELD WAS NOT BECAME DEAD WHEN
UP LINE RKPM FP-SABR SP BECOME
DEAD. PT-17&18 BECAME ZERO AFTER
OPENING OF BM-816. NOTE- PT-18 NOT
33 KV CABLE
EXIST THEFT
IN FIELD SINCEBETWEEN
13.11.18 KIKJ-OBC
R,Y,B PHASE LENGTH APPROX 225
METER.
WHEN 66 KV I/C-1 ( ON LOAD ) I/C-2 AT
KJMD RSS FAIL FROM DTL END ,PT
VALUE GONE BUT ON LOAD LCB 808
NOT TRIPED ON UNDER VOLTAGE & BUS
BAR
33 KVCLOUR
CABLEOF COMPLETE
THEFT ATTEMPTRSSFOUND
STILL
SHOWING
BETWEEN GREEN.
OBS-KIKJ AT LOC 33/32 to 32/40

PT VALUE SHOWING ZERO KV IN


CHARGE CONDITION.
33 KV CABLE THEFT ATTEMPT FOUND
BETWEEN OBS-KBCGN AT LOC 35/02 to
35/04
33 KV CABLE THEFT FOUND OF ALL 3
PHASE BETWEEN OBS-BCGN AT LOC
34/50-52 to 35/04.(Approx 300 mtr)

PT-283 SHOWING 33 KV VALUE &


BUSBAR COLOR GREEN WHILE CABLE IS
IN DISCHARGE CONDITION & MVCB-21
OPEN FROM LINE-3 ASS
BPT-802 SHOWING VALUE ZERO WHILE
BUS IS IN CHARGED CONDITION.

RCCB 805 EARTH SWITCH SHOWING


INDERMEDIATE IN SCADA.
CB-815 AND SP-815 CONTINUE SHOWING
CLOSE BUT OPEN CLOSE COMMAND
EXECUTE AT OCC/SCADA AND AT RSS
BREAKER POSITION SHOWING NORMAL
OPEN/CLOSE
FO COMMUNICATION FAILED ALARM
APPEARING FREQUENTLY IN ALARM
LIST

SCADA PERMISSIVE COMMAND ARE


NOT EXECUTED

33 KV CABLE FOUND ON ROAD LEVEL


BETWEEN OVA-KIKJ AT LOC PILLER NO-
190 .(Approx 50 mtr)

PT-41 AT JLA SSP HAS BEEN BURSTED.


33 KV BUS BAR COLORISATION IS NOT
WORKING B/W JPW-PSPK AFTER PLANT
TAKEOVER

SP-815 do not open / closed from occ scada.

MVCB-821 DO NOT OPEN FROM OCC


SCADA.

25KV BUS BAR COLORISATION AND PT


VALUES SHOWING RED COLOUR AFTER
CHARGING OF OHE AT RKPM FP & SS.

33 KV BUS BAR COLOURAISTION IS NOT


WORKING B/W JPW-KJMD DUE TO MVCB
822 AT IGDA ASS-2.
ATIS 806-2B DO NOT OPEN FROM SCADA.

03 PIECE OF 33 KV CABLE (APPROX 25


METER EACH) FOUND ON TRACK AT
LOC 29/70-68 B/W OVA-JLA.

PT VALUES AND BUS BAR SHOWING


GREEN IN SCADA EVENAFTER ALL
FEEDER CBs AND CONCERNED
ISOLATOTRS WAS IN OPEN CONDITION
AT RKPM AND PLAM FP

PT VALUE NOT PROPER IN OCC SCADA

33 KV CABLE FOUND THEFT BETWEEN


OVA TO JLA AT LOC.30/2 TO 30/6 ALL 3
PHASE LENGTH APPROX 150 METER.
BUS BAR SHOWING RED IN CHARGE
CONDITION.

INDICATION OF ACDB SHOWING FAILED


IN SCADA

INDICATION OF DCDB SHOWING FAILED


IN SCADA

SMD-830 NOT OPERATED TPC AS WELL


AS LOCALLY
CB 815 DO NOT CLOSED FROM OCC AND
LOCAL SCADA.

BM 849 not close from OCC/SCADA also


auto/manual logic switch not change .

MVCB-812 DOES NOT CLOSE FROM OCC


SCADA.
MVCB-821 DOES NOT OPEN FROM OCC
SCADA.
PT OF OUTGOING FEEDER 819,821, 825
&823, SHOWING 29KV EVEN AT RSS END
SHOWING 25.54KV DUE TO THIS LOT OF
HIGH WARNING ALARMS COMING IN
SCADA. PT VOLTAGE CHECKING NEED
TO DONE WITH OCC AND RSS BOTH
ENDS
FO COMMUNICATION FAILED ALARM
APPEARING FREQUENTLY IN ALARM
LIST
FO COMMUNICATION FAILED ALARM
APPEARING FREQUENTLY IN ALARM
LIST
FO COMMUNICATION FAILED ALARM
APPEARING FREQUENTLY IN ALARM
LIST
NOT CLOSE FROM OCC /SCADA OR
LOCAL SCADA
33 KV CABLE THEFT BETWEEN JANR-
OVA AT LOC 28/20-28/26
Y PHASE LENGTH APPROX 80 METER.
SMAE REPORED TO DELHI POLICE BY
PSI STAFF.

PT-44 HAS BRUST AND JUMPER WAS


HANGED.
PT VALUE SHOWING ZERO KV.
PT VALUE SHOWING ZERO KV.
PT VALUE SHOWING ZERO KV.
SMD-831 NOT OPERATED FROM TPC
AND CLOSE/OPEN NDICATION NOT
UPDATED IN OCC/SCADA
PT VALUE NOT PROPER IN OCC SCADA
AND BUS BAR OF SAME BAY ALSO NOT
UPDATE
MVCB822 NOT CLOSED BY TPC. SAME
CLOSED LOCALLY.
MVCB822 NOT OPENED BY TPC. SAME
CLOSED LOCALLY.
KJMD RSS COMMUNICATIOM
33 KV CABLE THEFT BETWEEN JANR-
FLUCTUATING CONTINUOUSLY.
OVA AT LOC 28/24-28/26
Y PHASE LENGTH APPROX 825METER.
SMAE REPORED
MVCB-821 TO DELHI
NOT CLOSED BYPOLICE
SCADABY
AS
PSI STAFF.
WELL AS ELECTRICALLY.
PSI STAFF CLOSED BY MANUALLY
33 KV CABLE THEFT ATTEMPT ON Y
PHASE CABLE AT LOCATION 29/12-29/14
BETWEEN OVA-JLA. SMAE REPORED TO
DELHI POLICE BY PSI STAFF.
33 KV CABLE THEFT ON Y PHASE CKT 1
CABLE AT LOCATION 29/10-29/14
BETWEEN OVA-JLA. SAME REPORED TO
DELHI POLICE BY PSI STAFF.
MVCB824 NOT OPEN THROUGH
OCC/SCADA.
MVCB821 NOT CLOSE THROUGH
OCC/SCADA. LOCALLY CLOSED BY PSI
STAFF.
Fire broke out due to Y-phase LA bursting in
Dry type transformer (SST802) at PLAM AMS.
Seven fire extiguishers were used to extiguish
the fire before arravial of fire brigade.

Both charger showing standby in scada

MVCB 186 SCADA INDICATION NOT


PROPER WHEN CLOSING COMMAND
GIVEN TO MVCB811 AT KJMD ASS-1.

MVCB 811 NOT CLOSE THROUGH


OCC/SCADA. LOCALLY CLOSED BY PSI
STAFF.
BSD-882 NOT GETTING OPENED FROM
SCADA.

CB-825 PT VALUE SHOWING ZERO IN


CHARGED CONDITION.
PFR NOT RESET FROM OCC SCADA

BSD 882 NOT CLOSe/OPEN FROM SCADA


FREQUENTLY

SM806 INDICATION NOT PROPER IN OCC


SCADA.

LBCB-805 DID NOT CLOSE REMOTELY AS


WELL AS LOCALLY..

AT-802 TRIPPED ON EARTH FAULT


DURING LOAD CHANGE OVER.

PFR LOGIC IS NOT UPDADING IN OCC


SCADA
LVCCB SHOWS INTERMEDIATE IN OCC
SCADA

LVCCB SHOWS INTERMEDIATE IN OCC


SCADA

SHOWS INTERMEDIATE IN OCC SCADA

NOT OPENING THROUGH OCC SCADA

NOT OPENING THROUGH OCC SCADA


RCEIS INDICATION IS SHOWING
UNDEFINED AT OCC SCADA BUT AT
LOCAL SCADA SHOWING NORMAL.

ACDB NORMAL IN FIELD BUT


FAIL/NORMAL ALARM AND INDICATION
COMING FREQUENTLY

NOT OPERATED THROUGH OCC/RSS


BOTH SCADA AS WELL AS LOCALLY
CB-833 DO NOT CLOSE FROM OCC
SCADA.

PT-42,43,44,45 showing 30.81value and bus-bar


green in ohe dead condition.

BM851 NOT CLOSED FROM OCC SCADA


SHAME LOCALLY CLOSED BY PSI STAFF.
BM SHOWING INTERMEDIATE IN
CLOSED CONDITION.

CB DID NOT CLOSED FROM OCC SCADA.


SAME CLOSED THROUGH LOCAL
SCADA.
VTB VALUE DID NOT BECOME ZERO
AFTER OPENING CB-804 &806.

33 KV CABLE THEFT ON Y PHASE CKT 1


AT LOCATION 29/50-54 and 29/60-29/64
BETWEEN OVA-JLA.

TR-802 TRIPPED ON MTR INDICATION.


SAME INFORED TO PSI STAFF FOR
CHECKING. AND FOUND IT IS TRIPPED
ON WTI.
FAILURE
REMARK/RECTIFICATION DETAIL
CODE

TO BE ATTENDED BY DMRC /PROJECT. NC

SCADA TESTING FOR SAME IS PENDING AND


COMMUNICATED TO DMRC PROJECT FOR ITS NC
RECTIFICATION.

M/S ARIF WILL BE ARRANGED BY JE/E&M


ALONG WITH SCADA STAFF FOR
NC
RECTIFICATION. AS PER JE E&M PROBLEM AT
SCADA END ON DATED 25.05.2019

R,Y&B Phase cable laying and jointing of cables are


C
Pending location 31/16 to32/14

TO BE ATTENDED BY DMRC /PROJECT. NC


TO BE ATTENDED BY DMRC /PROJECT. NC

TO BE ATTENDED BY DMRC /PROJECT. NC

SCADA TESTING FOR SAME IS PENDING AND


COMMUNICATED TO DMRC PROJECT FOR ITS VC
RECTIFICATION.

R&Y Phase cable laying done but B Phase cable laying


C
is Pending

TO BE ATTENDED BY PROJECT AND


O&M.PLANNED FOR JOINT INSPECTION WITH VC
SIEMENS
TO BE ATTENDED BY DMRC /PROJECT. NC

TO BE ATTENDED BY PROJECT AND


O&M.JOINT INSPECTION DONE AND NC
RECTIFICATION UNDER PROCESS.

TO BE ATTENDED BY PROJECT AND


O&M.PLANNED FOR JOINT INSPECTION WITH C
SIEMENS

INFORMED TO PROJECT TO PROVIDE PT IN


C
PARALLELING BM. PT NOT AVAILBLE IN FIELD.

Y & B PHASE MISSING , INFORM BY PSI


C
PLATING STAFF
TO BE ATTENDED BY PROJECT AND
O&M.PLANNED FOR JOINT INSPECTION WITH C
SIEMENS
TO BE ATTENDED BY PROJECT AND
O&M.PLANNED FOR JOINT INSPECTION WITH C
SIEMENS
OBSERVED BY HM/PSI ASHOK DURING
MORNING CAB PLATING, INFORM TO PSI C
INCHARGE AND ALL CONCERNED OFFICERS.
TO BE ATTENDED BY PROJECT AND
O&M.PLANNED FOR JOINT INSPECTION WITH C
SIEMENS
TO BE ATTENDED BY PROJECT AND
O&M.JOINT INSPECTION DONE AND C
RECTIFICATION UNDER PROCESS.

TO BE ATTENDED BY PROJECT AND


O&M.PLANNED FOR JOINT INSPECTION WITH C
SIEMENS
NO PT AVAILABLE AT JLA SSP FOR LINKING OF
PARALLELING TRIPPING LOGIC. NOTE
C
ALREADY SENT TO PROJECT DEPARTMENT
REGARDING SAME.
INFORMED TO SCADA STAFF. TESTING OF
SAME IS PENDING, INFORMED TO PROJECT FOR C
ITS RECTIFICATION
INFORMED TO SCADA/PSI STAFF. JOINT
INSPECTION DONE AND RECTIFICATION UNDER C
PROCESS.
INFORMED TO SIEMENS SCADA/PSI STAFF.
JOINT INSPECTION WILL BE PLANNED AS PER C
BLOCK AVAILABILITY
UNER VOLATE FUNCTION NOT UNABLE AS
C
MENTIONED IN APPROVED RELAY SETTING

Cable disconnected from dead cable zone. C

Cable disconnected from dead cable zone. C

PT REMOVED AND OHE CHARGED. TO BE


ATTENDED BY DMRC /PROJECT. BUT PT VALUE C
SHOWING.
OBSERVED BY HM/PSI RASBIHARI INFORMED
TO PSI INCHARGE AND ALL CONCERNED C
OFFICERS.
OBSERVED BY HM/PSI RASBIHARI INFORMED
TO PSI INCHARGE AND ALL CONCERNED C
OFFICERS.
OBSERVED BY SM/PSI GORLE INFORMED TO
PSI INCHARGE AND ALL CONCERNED C
OFFICERS.

INFORMED TO SCADA/PSI STAFF.

INFORMED TO SCADA STAFF. VC

OBSERVED BY SM/PSI SUNIL (DURING CAB


PLATING) INFORMED TO PSI INCHARGE AND C
ALL CONCERNED OFFICERS.

TO BE ATTENDED BY PROJECT AND


NC
O&M.SCADA STAFF

OBSERVED BY SM/PSI PRAVEEN INFORMED TO


PSI INCHARGE AND ALL CONCERNED C
OFFICERS.

INFORMED TO SCADA STAFF. VC

OBSERVED BY JE/PSI VIPIN INFORMED TO PSI


C
INCHARGE AND ALL CONCERNED OFFICERS.

OBSERVED BY HM/PSI SH RASHABIHARI,


INFORMED TO PSI INCHARGE AND ALL C
CONCERNED OFFICERS.

INFORMED TO SCADA STAFF C


INFORMED TO SCADA STAFF C

INFORMED TO SCADA STAFF C

INFORMED TO SCADA STAFF C

INFORMED TO SCADA/PSI STAFF C

INFORMED TO SCADA STAFF C

OBSERVED BY HM/PSI RASHABIHARI AND


INFORMED TO PSI INCHARGE AND ALL C
CONCERNED OFFICERS. CABLE KEPT AT KIKD.

INFORMED TO ALL CONCERNED. C


` C

INFORMED TO SCADA STAFF C

INFORMED TO SCADA STAFF C

INFORMED TO SCADA STAFF, AFTER CPU


REOUTING BY SCADA STAFF BUS BAR
C
COLOURISATION AND PT VALUES SHOWING
NORMAO IN SACADA AT RKMP FP & SS

INFORMED TO SCADA STAFF C


INFORMED TO PSI / SCADA STAFF C

OBSERVED BY SM/PSI MR VIJAY PATIDAR AND


INFORMED TO PSI INCHARGE AND ALL
C
CONCERNED OFFICERS. CABLE KEPT AT
BELOW CABLE BRACKET.

INFORMED TO SCADA STAFF C

INFORMED TO SCADA STAFF C

OBSERVED BY HM/PSI MR RASBIHARI,


INFORMED TO PSI INCHARGE AND ALL C
CONCERNED OFFICERS.
INFORMED TO SCADA STAFF C

SAME INFORMED TO PSI AND SCADA STAFF C

SAME INFORMED TO PSI AND SCADA STAFF C

Same operated by PSI/OHE staff manually at KIKD FP. C

INFORMED TO PSI STAFF C

SAME INFORMED TO PSI AND SCADA STAFF PSI


Staff check and found normal operation through loop , VC
as per hm/psi mr. Rasbihari this fault belongs to SCADA

INFORMED TO SCADA STAFF C

INFORMED TO SCADA/PSI STAFF C

SAME INFORMED TO SCADA AND PSI STAFF


C
SEVERAL TIMES.
INFORMED TO SCADA/PSI STAFF C

INFORMED TO SCADA/PSI STAFF C

INFORMED TO SCADA/PSI STAFF C

INFORMED TO SCADA STAFF C

OBSERVED BY JE/PSI MR SANJAY, INFORMED


TO PSI INCHARGE AND ALL CONCERNED C
OFFICERS.

INFORMED TP PSI STAFF AND ALL CONCERNED


VC
OFFICERS.
INFORMED TO PSI/SCADA STAFF NC
INFORMED TO PSI/SCADA STAFF NC
INFORMED TO PSI/SCADA STAFF NC

INFORMED TO PSI STAFF C

SAME INFORMED TO SCADA STAFF VC

INFORMED TO SCADA/PSI STAFF

INFORMED TO SCADA/PSI STAFF

SAME INFORMED TO SCADA STAFF C


OBSERVED BY SM/PSI MR SUNIL DURING CAB
PLATING, INFORMED TO PSI INCHARGE AND C
ALL CONCERNED OFFICERS.
INFORMED TO PSI STAFF C
MVCB811@OVA AND MVCB812@JLA ASS
TRIPPED ON PILOT WIRE PROTECTION. SAME
CHECKED BY PSI STAFF AND FOUND CABLE
C
THEFT ATTEMPT ON Y PH CABLE. 5 NO HEXA
BLADE WITH FRAM AND ONE NO PIT COVER
MVCB811@OVA
FOUND OPEN ATAND MVCB812@JLA
LOCATION 29/14 ASS
TRIPPED AS MTR OPERATED. SAME CHECKED
C
BY PSI STAFF AND CISF QRT TEAM FOUND
CABLE THEFT ON Y PH CABLE.
SAME INFORMED TO SCADAAND PSI STAFF.

SAME INFORMED TO SCADAAND PSI STAFF.

SAME INFORMED TO PSI STAFF and all concerned.

Both charger are normal in field.

SAME INFORMED TO SCADA STAFF.

SAME INFORMED TO SCADAAND PSI STAFF. VC

SAME INFORMED TO PSI AND SCADA STAFF. VC

SAME INFORMED TO PSI AND SCADA STAFF.


SAME INFORMED TO PSI AND SCADA STAFF.

SAME INFORMED TO SCADA AND PSI STAFF. C

SAME INFORMED TO SCADA STAFF. C

SAME CHECKED BY JE/PSI AND FOUND PT


C
FUSE FAULTY..

INFORMED TO ALL CONCERNED. C

SAME INFORMED TO SCADA STAFF. C


SAME ONFORMED TO SCADA AND PSI STAFF C

SAME INFORMED TO SCADA AND PSI STAFF C

SAME INFORMED TO SCADA AND PSI STAFF C

SAME INFORMED TO SCADA AND PSI STAFF C

SAME INFORMED TO SCADA AND PSI STAFF C


SAME INFORMED TO SCADA AND PSI STAFF C

SAME INFORMED TO SCADA AND PSI STAFF C

SAME INFORMED TO PSI AND SCADA STAFF C

INFORMED TO SCADA/PSI STAFF. C

INFORMED TO SCADA STAFF AND ALL


VC
CONCERNED OFFICERS.

INFORMED TO PSI/SCADA STAFF AND ALL


VC
CONCERNED OFFICERS.

INFORMED TO SCADA STAFF AND ALL


C
CONCERNED OFFICERS.
INFORMED TO SCADA STAFF AND ALL
C
CONCERNED OFFICERS.

MVCB811@OVA AND MVCB812@JLA ASS


TRIPPED AS MTR OPERATED. SAME CHECKED C
BY PSI STAFF FOUND 150 MTR OF THEFT.

ON INDICATION SHOWED ON OCC SCADA OF


WTI. SAME INFORMED TO se/scada AND PSI AS C
WELL.
TDC-1 TDC-2 TDC-3

31.10.2
13.02.19 10.04.19
018

20.10.2
20.02.19 12.04.19
018

31.10.2
10.12.2018 10.04.19
018

20.10.2
10.12.2018 10.04.19
018

20.10.2
15.02.19 10.04.19
018
20.10.2
16.02.19 10.04.19
018

20.10.2
16.02.19 12.04.19
018

20.10.2
15.02.19 10.04.19
018

20.08.2
16.02.19
018

31.10.2
16.02.19 12.04.19
018
31.10.2
16.02.19 10.04.19
018

31.10.2
16.02.19 10.04.19
018

31.10.2 ON DATED
30.12.18
018 16.10.18, AS
PER SCADA
STAFF,
AUTO/MANUA
31.10.2 L CANNOT BE
018 PROVIDED AT
KJMD SSP AS
31.10.2 PT IS NOT
10.12.2018
018 AVAILABLE
THAT OHE
31.10.2 POST.
15.02.19 12.04.19
018

31.10.2
15.02.19 12.04.19
018

10.12.2018

31.10.2
16.02.19 12.04.19
018
31.10.2
16.02.19 12.04.19
018

31.10.2
16.02.19 12.04.19
018

31.10.2
15.02.19 12.04.19
018

10.12.2
15.02.19 12.04.19
018

10.12.2
16.02.19 10..04.19
018
10.12.2
16.02.19 10.04.19
018

10.12.2
10.12.2018
018

10.12.2018

10.12.2018
10.12.2018

10.12.2018

10.12.2018

15.02.1 15.03.19 12.04.19

15.02.1
15.03.19 12.04.19
9

15.03.19

20.02.1
15.03.19 15.04.19
9

10.12.2018

15.02.1
15.03.19 13.04.19
9

15.03.19

15.03.19

15.03.19 12.04.19
15.03.19 12.04.19

15.03.19 13.04.19

15.04.19

15.04.19

12.04.19
15.04.19
15.04.19

15.04.19

15.04.19

12.04.19

You might also like