Document No: Request For Quotation (RFQ Handling)
Document No: Request For Quotation (RFQ Handling)
PROCESS NAME
Document No
FVMT/MKTG/QP/08
Amendment Record
Sr.No Issue Date Details of Change Page No. Rev.No
2. SCOPE :-
This process is applicable for handling RFQ for all kind of products at Flash Viven Machining Group of Companies
3. DOCUMENT REFERENCE :-
Sr.No. REFERENCE DOCUMENT NAME
4. ABBEREVATIONS :-
RFQ- Request for quotation MD- Managing Director Engg - Engineering
APQP - Advance Product Quality Planning
LOI- Letter of intent MKTG- Marketing
5. RECORDS :-
RFQ Register & Quotation Master summary FVMT/MKTG/F/01 MKT & Engg. Head Obsolete Folder
Business risk analysis FVMT/MKTG/F/32 MKT & Engg. Head Obsolete Folder
CFT / RASIC Chart FVMT/QMS/F/139 MKT & Engg. Head Tear Off/Obsolete
6. KPI :-
7. INTER-RELATED PROCESS :-
PROCESS NAME
Control of Document
Control of Record
APQP
PAGE : 1 of 3
QUALITY MANAGEMENT SYSTEM Issue Date 08.07.2020
Document No :
FVMT/MKTG/QP/08 Revision No. 01
Process
Revision Date 06.07.2020
RFQ Handling
Reference/
Input/ Trigger Responsibility Activity Document/Record Generated
Instructions
10
Customer Input
1010 RFQ/ Drawings from
Drawing 10 customer,
Technical Data Receive RFQ. RFQ Register & Quotation Master summary,
10-40
Volume Project Ensure customer specific requirement received Master summary CSR Matrix
Marketing HOD
Life from customer
Market
Intelligence 20
RFQ from
customer
Learning sheet
Conduct business risk
assesment study for new 20
customer at initial stage & No Stop the Business risk analysis
conduct preliminary further
feasibility for components process
for existing customer.
30 40
Yes
Inform Customer
Drawing Handover to Engg. for regret.
Send initial response to customer stating
acceptance of RFQ within Seven working days
after receipting RFQ along with NDA copy.
50-100 50 50
Engg. HOD
After management desicion,Submit quotation to customer with
in week. Manufacturability study Sheet
Conduct Feasibility study & Preliminary PFD.
Study the customer input requirements like Special
characteristics,drawing specifications,statutory & regulatory
requirements.
60 70
No Stop The
Is Feasibility Project &
study ok? Send Note to
Marketing
Yes
80
Prepare the Costing sheet. 80
Either submit in FVMT Format or Customer specific format. Quotation
90
110- Quote No
120 Quote
No feedback accepted by revision
from customer customer required
upto 4 month,
discuss with
customer & close
130 YES
RFQ
Output
PAGE : 2 of 3
QUALITY MANAGEMENT SYSTEM PROCESS
Doc No. FVMT/MKTG/QP/08
(Turtle Diagram)
IATF 16949:2016 Rev. No : 01
RFQ Handling
8.1.1 Rev. Date : 06.07.2020
Process
Inputs Outputs
Customer Drawing
Technical Data
Volume Project Life
Market Intelligence
RFQ Handling Process Quotation
RFQ from customer
Learning sheet
PAGE : 3 of 3