0% found this document useful (0 votes)
139 views

SWOT & Turtle Diagram Production Control

This document provides a horizontal infographic for a SWOT analysis. It lists strengths such as interdepartmental communication and teamwork. Weaknesses include a lack of Cpk analysis and insufficient support for quality issues. Opportunities include establishing strategic alliances and implementing new technologies. Threats include fluctuations in requirements and suppliers not being available with needed quantities.

Uploaded by

A81V Salon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
139 views

SWOT & Turtle Diagram Production Control

This document provides a horizontal infographic for a SWOT analysis. It lists strengths such as interdepartmental communication and teamwork. Weaknesses include a lack of Cpk analysis and insufficient support for quality issues. Opportunities include establishing strategic alliances and implementing new technologies. Threats include fluctuations in requirements and suppliers not being available with needed quantities.

Uploaded by

A81V Salon
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Horizontal Infographic For SWOT Analysis

S W O T
STRENGTHS WEAKNESSES OPPORTUNITIES THREATS

• Interdepartmental • Drop In, spikes or


• There are not Cpk • Stablish Frozen
communication changes in the
analysis in the zones.
• Team Work requirement.
production lines. • Strategic alliances
• Planner with APICS • Components not
• Support is not between BU to
trainning. bought On Time.
enough for Quality tooling, people,
• Communication and • There are not
issues. processes.
follow Up between suppliers available to
• Artesanal & manual • Implement new
Redmond and buy the quantities
processes. technologies for
Chihuahua. needed.
• There are not back produce (Automatic
• Robust knowledge
up in all the processes)
in MRP.
positions for cover • Update the
• Employees with
the demand. manufacturing times
more 3 years of
for the items in
experience in the
production.
position.
• MRP.
• Kanban System With whom?
• Agile
• e-mail.
Documents Control,
Warehouse.

Planning
• MRP requirement • Planning of Production.
• Special requests by e- • Program production according to capacity Planned WO’s
mail • Track WO’s in Production Floor.
• Follow up urgent WO’s to meet due dates.

• Age Wip
• OTD
QMS 730 • Late backlog
• Future Load.

You might also like