20% Development Fund Report
20% Development Fund Report
Province of Cebu
Municipality of Bantayan
Page 1 of 10
Utilized Fund Unutilized Fund
Name of Program/ Project/ Activity Project Cost Mode of Implementation Status
(as of June 30, 2021) (as of June 30, 2021)
Repair of Government Facilities- Sports 855,698.00 by Administration 120,230.00 735,468.00
Complex, Birthing Ctr and other Multi-
Purpose Bldg
Establishment of Waterwork System (Atop- 5,000,000.00 Straight Contract Complete 4,998,420.00 1,580.00
atop)
Expansion of Water System (Kampingganon, 5,999,993.78 Straight Contract Complete 5,991,996.40 7,997.38
Patao, Putian & Baod)
Const. of MRF in the 15 barangays of 811,400.00 - 811,400.00
Bantayan
Implementation of Development Projects in 157,045.55 - 157,045.55
the Barangay and other Infrastructure Assets
Opening of Bypass Road (Brgy Mojon across 9,250,000.00 Straight Contract For Implementation (Bid - 9,250,000.00
crossing Sulangan traversing Kangkaibe Sitio Opening 7/13/2021)
Poso, Ticad, Bantigue exit Kabangbang
beside Don Bernardo)
Expansion of School Covered Court (Mojon IS 1,000,000.00 by Administration Complete 903,871.00 96,129.00
& Kabangbang ES)
Improvement of Holding Center Building & 500,000.00 by Administration Complete 476,800.00 23,200.00
Perimeter Fence
Const. of production well with pumphouse 800,000.00 - 800,000.00
& electrical connections (Kampingganon)
Page 2 of 10
Utilized Fund Unutilized Fund
Name of Program/ Project/ Activity Project Cost Mode of Implementation Status
(as of June 30, 2021) (as of June 30, 2021)
Installation of Street Lights at Bantayan 500,000.00 by Administration For Implementation (Bid - 500,000.00
Wharf Opening 7/8/2021)
Road Concreting at Sitio Kantamayon, Patao 1,000,000.00 by Administration Complete 955,860.00 44,140.00
Installation of Street lights from Poso, Ticad 3,609,000.00 by Administration For Implementation (Bid - 3,609,000.00
to Sillon Opening 7/21/2021)
Page 3 of 10
Utilized Fund Unutilized Fund
Name of Program/ Project/ Activity Project Cost Mode of Implementation Status
(as of June 30, 2021) (as of June 30, 2021)
Construction of Sillon Water System 600,000.00 by Administration For Implementation (Bid - 600,000.00
Perimeter Fence Opening 7/8/2021)
Construction of Watchtower as Patrol 500,000.00 - 500,000.00
Outpost in Brgy. Lipayran
Sub-Total - 42,409,341.00
TOTAL 34,710,537.40 86,313,208.98
Prepared by:
ETHEREAL A. DIAZ
MPDC
Page 4 of 10
Republic of the Philippines
Province of Cebu
Municipality of Bantayan
Name of Program/ Project/ Activity Project Cost Mode of Implementation Status Utilized Fund Unutilized Fund
(as of June 30, 2021) (as of June 30, 2021)
CONTINUING APPROPRIATION- 2019
Construction of Multi- Purpose Center at 999,795.50 by Administration Complete 952,905.95 46,889.55
Brgy. Baod
Installation & Maint. Of Street Lighting 1,500,000.00 by Administration Complete 1,375,713.00 124,287.00
Facilities
Const. & Improvement of Toilets 231,535.70 by Administration Complete 67,370.70 164,165.00
Construction of two (2) storey six (6) CL 2,400,000.00 - 2,400,000.00
School Bldg. at Baigad Integrated School
Construction of Perimeter Fence (Sulangan, 495,520.00 by Administration On going (34%) 105,345.00 390,175.00
Luyongbaybay, Bantigue DCC)
Page 5 of 10
Utilized Fund Unutilized Fund
Name of Program/ Project/ Activity Project Cost Mode of Implementation Status
(as of June 30, 2021) (as of June 30, 2021)
Repair of Government Facilities- Sports 855,698.00 by Administration 120,230.00 735,468.00
Complex, Birthing Ctr and other Multi-
Purpose Bldg
Establishment of Waterwork System (Atop- 5,000,000.00 Straight Contract Complete 4,998,420.00 1,580.00
atop)
Expansion of Water System (Kampingganon, 5,999,993.78 Straight Contract Complete 5,991,996.40 7,997.38
Patao, Putian & Baod)
Const. of MRF in the 15 barangays of 811,400.00 - 811,400.00
Bantayan
Implementation of Development Projects in 157,045.55 - 157,045.55
the Barangay and other Infrastructure Assets
Opening of Bypass Road (Brgy Mojon across 9,250,000.00 Straight Contract For Implementation (Bid - 9,250,000.00
crossing Sulangan traversing Kangkaibe Sitio Opening 7/13/2021)
Poso, Ticad, Bantigue exit Kabangbang
beside Don Bernardo)
Expansion of School Covered Court (Mojon IS 1,000,000.00 by Administration Complete 903,871.00 96,129.00
& Kabangbang ES)
Improvement of Holding Center Building & 500,000.00 by Administration Complete 476,800.00 23,200.00
Perimeter Fence
Const. of production well with pumphouse 800,000.00 - 800,000.00
& electrical connections (Kampingganon)
Const. of Motorpool (Manan-ao, Bantigue) 4,000,000.00 by Administration On going (98%) 3,852,395.00 147,605.00
Page 6 of 10
Utilized Fund Unutilized Fund
Name of Program/ Project/ Activity Project Cost Mode of Implementation Status
(as of June 30, 2021) (as of June 30, 2021)
Installation of Street Lights at Bantayan 500,000.00 by Administration For Implementation (Bid - 500,000.00
Wharf Opening 7/8/2021)
Road Concreting at Sitio Kantamayon, Patao 1,000,000.00 by Administration Complete 955,860.00 44,140.00
Road Concreting at Barangay Sillon (Sitio 1,000,000.00 by Administration Complete 1,000,000.00 (4,640.00)
Kampendoy)
Construction of Desalination Plant in Doong 21,912,000.00 Design and Build For Implementation (Bid - 21,912,000.00
Island & Brgy Luyong Baybay Opening 7/12/2021)
Prepared by:
ETHEREAL A. DIAZ
MPDC
Page 7 of 10
Republic of the Philippines
Province of Cebu
Municipality of Bantayan
Opening of Bypass Road (Brgy Mojon across 9,250,000.00 Straight Contract On going (2%)
crossing Sulangan traversing Kangkaibe Sitio
Poso, Ticad, Bantigue exit Kabangbang
beside Don Bernardo)
Sub-Total
CONTINUING APPROPRIATION- 2020
Const. of Perimeter Fence for Day Care 1,000,000.00
Centers (Counterpart to the Day Care
Centers Const. Program of RAFI-DACF)
Sub-Total
20% DEVELOPMENT FUND- 2021
Construction of Atop-Atop waterworks 6,000,000.00 Realigned
system (Electrical Works and Distribution
Pipelines)
Installation of Street lights from Poso, Ticad 3,609,000.00 by Administration For Implementation (Bid
to Sillon Opening 7/21/2021)
Sub-Total
TOTAL
Prepared by:
ETHEREAL A. DIAZ
MPDC