PM FM 400
PM FM 400
Preventive maintenance
Training Department
Training Division
TST 1701-1, March 2010
Competence Development Planning
Competence Development Planning
Preventive Maintenance
Truck selalu siap digunakan
Investigasi awal
pemantauan Masalah yang
akanterjadi
umur Komponen Panjang
mengurangi biaya
Mengurangi waktu
breakdown
Competence Development Planning
Financial Services
FH12, FH16
Training Division
TST 1701-1, March 2010
Competence Development Planning
Training Division
TST 1701-1, March 2010
Competence Development Planning
VIN
VIN
1. Place of Manufacture
2. Type of cab
3. Engine type
4. Brakes/ axle combination
5. Check sum
VIN 6. Model year
7. Assembly factory
8. Chassis serial number
Competence Development Planning
Note :
VDS : Volvo Drain Specification
ACEA: Association Constructeurs Européens d'Automobiles
API :The American Petroleum Institute
Type of Engine
D 13 A
Competence Development Planning
Type of Gearbox
AT 24 12 C
Generation
Forward gear
Max. Torque 2400 Nm
Automatic Transmission
Competence Development Planning
VT2014; VT2214B;
VT2514OD, VTO2214B,
VTO2514B,VTO2814B 13,5 liter
VT2009B
SAE 50 12.0 liter
VT2412B SINGLE GRADE 13.0 liter
AT2412C, AT2412D, API CE or CF
AT2512C, ATO2512C, ACEA E2 or E3
AT2612D, ATO2612D,
AT2812C, AT2812D, 16 liter
ATO3112C, ATO3112D,
ATO3512D
ATF DextronIII &
VT1605PT, VT1705PT , Alison C4 35 liter
VT1706PT , VT1805PT
Note : Oli Manual Transmissi dan I-shift diganti setiap 20.000 km
Oli Auto Transmissi / powertronic diganti setiap 40.000 km
Competence Development Planning
Cab lubrication
Lubrication point Lubricant
Oil Level
FM/FH series
Competence Development Planning
C
Competence Development Planning
Ganti oil Filter
Competence Development Planning
80 ± 20 Nm
Competence Development Planning
Training Division
TST 1701-1, March 2010
Competence Development Planning
1000 Hm / 500.000 Km
Competence Development Planning
Training Division
TST 1701-1, March 2010
Competence Development Planning
Instrumentation
> IC
> SID
Training Division
TST 1701-1, March 2010
Competence Development Planning
1. Focus change between navigation in the driver information display or the secondary display.
2. Navigate left.
3. Escape (cancel/go back).
4. Navigate right.
5. Navigate up/down. Confirm selection/OK (press).
Competence Development Planning
Diagnostics
Competence Development Planning
Training Division
TST 1701-1, March 2010
Competence Development Planning
•Check that the control steps are distinct and that the control remains in the set position.
A. Position lights.
B. Day Running Light.
C. Dipped beam/main beam.
D. Main beam and auxiliary
lamps(spotlights).
•Make sure the level in the battery cells is about •Check the condition of batteries
18–28 mm above the cell plates (South with battery analyser 9812515 or
America) and 5 -10 mm above the cell plates 9812518.
(Europe).
Competence Development Planning
Check fuel tank, hoses, pipes, venting and
mounting
•Check that the filter air inlet is not blocked by dust or dirt.
•Check that the filter and ventilation pipe are intact and
securely fastened.
Competence Development Planning
•Check that the hose and pipe nipples on the fuel lines do not leak
•Check that the fuel pipes do not leak and are not chafed.
Competence Development Planning
.
Competence Development Planning
Rubber Valve
Competence Development Planning
! There must be no play evident when checking. No abnormal noise/feel may occur
when the steering wheel is raised or lowered within its range of adjustment.
Competence Development Planning
Training Division
TST 1701-1, March 2010
Competence Development Planning
For FM Axial clearance, steering knuckle - front axle member..... 0.01 - 0.15 mm
•If the bearing play is 0.2 mm or greater, the hub and bearing must be
changed immediately to avoid future bearing breakdown.
Competence Development Planning
Check that the seal on the speedometer sensor on the gearbox is intact
Competence Development Planning
•Check the anti–roll bar bushes. Rubber bushes must not have any play and
plastic bushes must not have radial play greater than 2 mm.
Competence Development Planning
Setiap Service
Competence Development Planning
Specifications:
1.5 mm
Competence Development Planning
Welding instruction
Welding instruction
Welding instruction
Welding instruction
Welding instruction
Terimakasih