The document outlines the work methodologies for several road construction projects. For mobilization, site clearance, and demobilization, the common approach is to use a pickup truck to transport personnel, equipment, and materials. Machinery like graders and compactors are utilized along with manual labor for tasks like earthworks, gravelling, and culvert installation. Three sentences or less cannot provide many details but cover the high level approaches.

Uploaded by

KOL pol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views5 pages

Work Mehodology Kerra Roads - Mukuva

The document outlines the work methodologies for several road construction projects. For mobilization, site clearance, and demobilization, the common approach is to use a pickup truck to transport personnel, equipment, and materials. Machinery like graders and compactors are utilized along with manual labor for tasks like earthworks, gravelling, and culvert installation. Three sentences or less cannot provide many details but cover the high level approaches.

Uploaded by

KOL pol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

WORK MEHODOLOGY C449: KAEWA – IIANI - NYANGENI

1) GENERAL OFFICE ADMISTRATION AND

OVERHEADS/PRELIMINARIES

These items, we shall use labour to go the site using a pickup to transport

fuel. We shall employ manual employ for setting up of camp site and putting

up sign post.

2) Site clearance

We shall use labour and machinery grader where necessary

3) Gravelling

We shall use machinery in the form of grader for this purpose water

bulldozer for watering and compactor for compaction purpose.

4) Demobilization

We shall use a pick up to demobilize the equipment of works from site.


WORK METHODOLOGY : E1804: MBEE - KALIVANI

1. Mobilization

The contractor will proceed with works, with due diligence upon receiving

order of commence from the Engineer. We shall employ the use of a pick up

to move both personnel and materials such as fuel.

For sign post and camp site we shall employ labour.

2. Earthworks

We shall use labour and compactor for excavations and compaction

respectively.

3. Culvert and Drainage

We shall use labour for this work

4. Grading and Gravelling works

We shall use a motor grader for the purpose of gravel patching.

5. Dayworks

We shall employ machinery that is bulldozer for this particular task.

6. Demobilization

We shall use a pick-up for getting out materials from the camp site.
WORK METHODOLOGY E1803: NGELANI – KITHIMA - MITABONI

I. Mobilization

We shall use pick-up to transport to get to site personnel and fuel. Labour

will be used to put up the sign post at camp site.

II. Site clearance

We shall use labour and a motorized grader where necessary in reshaping of

the surface to the specified camber.

III. Earthworks

We shall use labour and compactor to do this work.

IV. Grading and Gravelling

We shall use machinery on the form of grader to do this task

V. Demobilization

We will make use of our pick-up to demobilize from site.


WORK METHODOLOGY E4062: NDULUMONI – KALALA - KAYAATA

1. Mobilization

We shall use our pick up to go to site.

2. Site clearance

We shall use labour and machinery grader where necessary

3. Culvert and drainage work

We shall employ labour and machinery -concrete mixer and compactor for

this work.

4.Trees

We shall use labour for this work.

5.Demobilization

We shall employ the use of our pick up for this work.


WORK METHODOLOGY U_G44415 KATWII – MIU - KASEVE

1. Mobilization

We shall employ the use of a pick up to transport both fuel and personnel to

site.

2. Site clearance

We shall use both labour and machinery grader for this purpose.

3. Culvert and drainage work

We shall use labour and machinery in the form of grader for this purpose.

4. Demobilization

We shall use pick up to demobilize from site.