0% found this document useful (0 votes)
39 views

National Productivity Organization: Training Need Assessment (Tna)

This document is a training needs assessment form for a Pakistani organization. It provides information about the organization including its mission, products, type of industry, number of employees, and certification status. It also includes details about a selected "role model" department, including its processes, employees, major problems, and machine efficiency losses analysis. Finally, it lists preferred technical training topics in English or Urdu such as maintenance processes, troubleshooting, and instrumentation. The goal of the form is to assess the training needs of the organization to improve productivity.

Uploaded by

Shayan Rehman
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

National Productivity Organization: Training Need Assessment (Tna)

This document is a training needs assessment form for a Pakistani organization. It provides information about the organization including its mission, products, type of industry, number of employees, and certification status. It also includes details about a selected "role model" department, including its processes, employees, major problems, and machine efficiency losses analysis. Finally, it lists preferred technical training topics in English or Urdu such as maintenance processes, troubleshooting, and instrumentation. The goal of the form is to assess the training needs of the organization to improve productivity.

Uploaded by

Shayan Rehman
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

National Productivity Organization Doc # QP/7.

5/Trg/F-01
Rev # 02
Ministry of Industries, Production & Special Initiatives
Government of Pakistan
TRAINING NEED ASSESSMENT (TNA)
1. ORGANIZATIONAL INFORMATION
COMPANY PROFILE:
M/s
NAME
COMPANY Mr / Mrs / Ms
REPRESENTATI
VE

ADDRESS

TELEPHONE +92 - - CELL +92 - -


(EXT.) FAX +92 - -
E-MAIL

MISSION STATEMENT:

PRODUCT (S):

TYPE OF INDUSTRY: SECTOR:


[ Processing [ Manufacturing [ Service [ Textile (Spinning, Fiber, Yarn, Dyeing & Printing, etc.)
[ Institution
(if institution, please also fill the annexure “A”
__________________________________________
attached) [ Engineering (Light / Heavy) ___________________
Other: [ Leather
____________________________________ [ Pharmaceutical
NO. OF EMPLOYEES: [ Food and Beverages
[ Printing
Number of
Sr. Type of Staff [ Education
People
[ Any Other _________________________________
HIGHER MGT.

MANAGEME MIDDLE MGT.


1.
NT
LOWER MGT.

2. TECHNICAL STAFF

3. LOWER STAFF
Nominate Productivity Facilitator: Designation:
Note: (This Performa will be treated as a confidential document. We will ensure its confidentiality.)

NPO PAKISTAN Page 1 of 5


CERTIFICATION STATUS:
1. ISO 9001: 2000 [ CERTIFIED [ NOT CERTIFIED [ UNDER PROCESS
2. ISO 14000 [ CERTIFIED [ NOT CERTIFIED [ UNDER PROCESS
3. SA 8000 [ CERTIFIED [ NOT CERTIFIED [ UNDER PROCESS
4. ANY OTHER (Please mention the standard and the status)
______________________________________________________________________________________

PROBLEMS FACING DURING WORKING / PRODUCTION:


______________________________________________________________________________________
______________________________________________________________________________________

SUGGESTED CORRECTIVE ACTION:


______________________________________________________________________________________
__________________
DO YOU REQUIRE PROCESS UPGRADATION FOR YOUR RPODUCTION LINE: [ YES [ NO
(IF REQUIRED, PLEASE SPECIFY
__________________________________________________________________________)
NPO SERVICES: [ FORIEGN EXPERTS REQUIRED (TES) [ OBSERVATION / STUDY MISSION
[ CONSULTANCY [ TRAINING SERVICES
[ QUALITY CIRCLES [ PAKISTAN NATIONAL QUALITY AWARD
[ ENERGY EFFICIENCY [ BENCHMARKING
[ APO SERVICES

1. DEPARTMENTAL INFORMATION (Compulsory):


(Preferably the worst department of the organization)

Name of the selected Brief Process: (Attach process flow diagram)


“Role Model”
Department:
Type of Production: Products of the Dept. Person Incharge Contact Person
Flow Production ‫ם‬

Small lot production‫ם‬


Any other:-----------------

NO. OF EMPLOYEES:
Number of Overall
Sr. Type of Staff
People Language level *
1. MIDDLE MGT. 1 2 3 4
Management
LOWER MGT. 1 2 3 4
2. Skilled Workers 1 2 3 4
3. Semi Skilled Workers 1 2 3 4
4. Unskilled workers 1 2 3 4
5. Total Number of Employees in department
* The Evaluation criteria for Language proficiency:
1. As fluent as the native language (Write and Speak Well)
2. Competent to participate in discussion and express himself.
3. Proficient enough to follow lectures/discussions, but will have difficulties in expressing ideas and giving comments.
4. Cannot speak and write urdu at all.

NPO PAKISTAN Page 2 of 5


Major problems:
Problems of selected department (Please Tick the appropriate one)
Technology ‫ם‬ Wastage ‫ם‬
Frequent Machine Break Down ‫ם‬ Rework ‫ם‬
Lack training / Lack Skills ‫ם‬ Low wages ‫ם‬
High cost of production ‫ם‬ Employees Turnover ‫ם‬
ional Health and safetyOccupat House keeping ‫ם‬

Any other (Please specify) _________________________________________________________________

Machine Efficiency and Losses Analysis


Machine Model: Machine #
Machine Name: (The
most problematic Year of Manufacturing:
machine) Machine working hrs:

a) Quality Loss (Eq)


Targeted Loses
No of defects /day(units)
No of output • Defective Products
Valuable time loss
• Rework
products/day(units)

Eq = (No of outputs – No of defects) x 100


(No of output)

b) Function Loss (Ef)

Standard cycle time • Idling or short stop


Net Working time loss • speed down
Machine work time

Ef = (standard cycle time x No of output products) x 100


(Machine work time)

c) Stop Loss (Et)

Total planned time (Hrs/Min):


Failure Time (FT) • Failure
• Preparation and
Planned and Preparation and Adjustment Time adjustment
Working time • Change tools and
(PAT)
Loss material
Change tools and materials time • Start-up
(CTMT)
Start-up time or set-up (ST)
Total loss time: FT + PAT+ CTMT+ST

Et = (Planned time - loss time) x 100


(Planned time)

Overall Machine Efficiency= Eq x Es x Et

NPO PAKISTAN Page 3 of 5


TRAINING NEEDS: (Just tick the appropriate training and also please specify details against each topic,
where necessary)

PREFERRED MEDIUM OF INSTRUCTION:


ENGLISH [ URDU [ ANY OTHER ______________

TECHNICAL (Organizational Trainings):


ON JOB TRAINING (OJT) REQUIREMENTS
(In case of Machine Specific Training, Please indicate the xii). Instrumentation [
type of Machine)
i). Maintenance Process [
ii). Trouble Shooting [ xiii). Calibration and Monitoring Devices [
iii). Any Other
________________________________________

iv). Maintenance Management [ Any Detail: xiv). Introduction to Computer and Application
Software [

v). Industrial Production Planning and Control [ xv). Computer Maintenance [

vi). Inventory Management / Store Keeping [ xvi). Industrial Machine Tools [

vii). Programmable Logic Controllers (PLC) [ xvii). Industrial Quality Control & Management [

viii). CNC Machines [ xviii). Precision Machining [

ix). Design Techniques and Application Software (CAD / xxi). Electrical system [
CAM )[

Industrial Electronics [ Any other (Please specify)

GENERAL MANAGEMENT TRAINING :


i). ISO 9000 / ISO 14000 / SA 8000 / Other Standards [ Benchmarking [

ii). Enhancing Human Productivity [ ix). QC Tools [

iii). Productivity Tools [ x). Time Management [

iv). Quality Control Circles [ xi). Leadership & Motivation [

v). 5 S [ xii). Decision Making & Problem Solving [

vi). Integrated Productivity Improvement [ xiii). Kaizen Management [

vii). Enhancing Productivity through Total Quality Management xiv). Suggestion System [
[

viii). Total Productive Maintenance (TPM) [ xvi). Occupational Health & Safety (OHAS) [

ix). Any other training

NPO PAKISTAN Page 4 of 5


ANY OTHER SPECIALIZED TRAINING REQUIRED:
______________________________________________________________________________________

______________________________________________________________________________________

______________________________________________________________________________________

______________________________________________________________________________________

______________________________________________________________________________________

______________________________________________________________________________________

SUGGEST LOCAL Or INTERNATIONAL EXPERTS you may like to hire (if anyone you know):
______________________________________________________________________________________

______________________________________________________________________________________

______________________________________________________________________________________

WE HOPE THAT YOU WILL PROVIDE THE INFORMATION UP TO BEST OF YOUR KNOWLEDGE:
______________________________________________________________________________________

DATE (DAY-MONTH-YEAR): ___________________ SIGNATURE


(PLEASE ATTACH EXTRA SHEETS WHERE NECESSARY)

NAME & DESIGNATION

NPO PAKISTAN IS THANKFUL FOR YOUR EARLY AND KIND RESPONSE.


AFTER FILLING THE FORM, PLEASE HANDOVER TO THE DISTRIBUTOR OR MAIL / FAX TO:

DEPUTY GENERAL MANAGER


NATIONAL PRODUCTIVITY ORGANIZATION
MINISTRY OF INDUSTRIES & PRODUCTION
GOVERNMENT OF PAKISTAN
11th Floor, Shaheed-e-Millat Secretariat, F-6/1
Islamabad
E-MAIL: [email protected]
WEBSITE: www.npo.gov.pk

For office Use only


Remarks by the Assessor who conducted the Survey:
--------------------------------------------------------------------------------------------------------------------------------------------------------

Photograph session Video Any other mode :______________________________

Date of Assessment (DAY-MONTH-YEAR): ________________________ SIGNATURE

Training Need Assessment Report attached NAME

DESIGNATION

Remarks by the DGM NPO (if any)

-------------------------------------------------------------------------------------------------------------------------------------------------------

Date: Training Plan not required Training Plan required Deputy General Manager

NPO PAKISTAN Page 5 of 5

You might also like